1z0-068 無料問題集「Oracle Database 12c: RAC and Grid Infrastructure Administrator」
Examine this command:
SQl> CREATE DISKGROUP RECO HIGH REDUNDANCY:
FAILGROUP fgrp1 DISK
'/dev/disk1' NAME disk1,
'/dev/disk2' NAME disk2,
'/dev/disk3' NAME disk3,
FAILGROUP fgrp2 DISK
'/dev/disk4' NAME disk4,
'/dev/disk5' NAME disk5,
'/dev/disk6' NAME disk6,
FAILGROUP fgrp3 DISK
'/dev/disk7' NAME disk7,
'/dev/disk8' NAME disk8,
'/dev/disk9' NAME disk9,
ATTRIBUTE 'au_size'='4M',
'compatible.asm' = '12.1',
'compatible.rdbms' = '12.1',
'compatible.advm' = '12.1',
'content_type' = 'recovery';
Which three statements are true about this disk group?
SQl> CREATE DISKGROUP RECO HIGH REDUNDANCY:
FAILGROUP fgrp1 DISK
'/dev/disk1' NAME disk1,
'/dev/disk2' NAME disk2,
'/dev/disk3' NAME disk3,
FAILGROUP fgrp2 DISK
'/dev/disk4' NAME disk4,
'/dev/disk5' NAME disk5,
'/dev/disk6' NAME disk6,
FAILGROUP fgrp3 DISK
'/dev/disk7' NAME disk7,
'/dev/disk8' NAME disk8,
'/dev/disk9' NAME disk9,
ATTRIBUTE 'au_size'='4M',
'compatible.asm' = '12.1',
'compatible.rdbms' = '12.1',
'compatible.advm' = '12.1',
'content_type' = 'recovery';
Which three statements are true about this disk group?
正解:C、D、E
解答を投票する
解説: (JPNTest メンバーにのみ表示されます)
You must deploy several Oracle 12c databases on an Oracle Grid Infrastructure Managed Cluster, and are required to have the ability to perform these actions without down time:
1. Apply a Grid Infrastructure interim patch.
2. Apply a Grid Infrastructure Patch Set Update (PSU).
3. Apply a database on-line patch.
4. Apply a Grid Infrastructure patchset.
5. Apply a database patchset.
6. Upgrade Grid Infrastructure from one release to another.
7. Upgrade databases from one release to another.
Your plan is to perform these tasks:
1. Install and configure Oracle Grid Infrastructure on a local le system.
2. Install Oracle Database software on an ACFS le system.
3. Create several RAC One Node databases.
Which of the 7 requirements are met by your plan?
1. Apply a Grid Infrastructure interim patch.
2. Apply a Grid Infrastructure Patch Set Update (PSU).
3. Apply a database on-line patch.
4. Apply a Grid Infrastructure patchset.
5. Apply a database patchset.
6. Upgrade Grid Infrastructure from one release to another.
7. Upgrade databases from one release to another.
Your plan is to perform these tasks:
1. Install and configure Oracle Grid Infrastructure on a local le system.
2. Install Oracle Database software on an ACFS le system.
3. Create several RAC One Node databases.
Which of the 7 requirements are met by your plan?
正解:F
解答を投票する