300-820 無料問題集「Cisco Implementing Cisco Collaboration Cloud and Edge Solutions」
Refer to the exhibit.

Refer to the exhibit. An engineer must configure a B2B traversal zone. Trusted certification authority and server certificates are uploaded to Cisco Expressway-C and Expressway-E servers. After the traversal zone configuration is completed in Expressway-C, the error message in the exhibit appears. What are the two reasons for the error? (Choose two.)

Refer to the exhibit. An engineer must configure a B2B traversal zone. Trusted certification authority and server certificates are uploaded to Cisco Expressway-C and Expressway-E servers. After the traversal zone configuration is completed in Expressway-C, the error message in the exhibit appears. What are the two reasons for the error? (Choose two.)
正解:C、D
解答を投票する
After an engineer implements load balancing in the Cisco CMS cluster, they observe that shortly after the second Call Bridge is added to the cluster, calls into a space randomly disconnect when the calls are from endpoints registered with Cisco UCM. Which action resolves the issue?
正解:A
解答を投票する