API-936 無料問題集「API Refractory Personnel」

The installation contractor is required to secure an advance agreement that concerns all the installation details from the:

解説: (JPNTest メンバーにのみ表示されます)
The lining surface should remain uncovered and free from contact with moisture during the curing period for what type of refractory?

解説: (JPNTest メンバーにのみ表示されます)
Which of the following is the appropriate term for testing refractory that was sampled during project site installation in order to confirm that it meets specified physical property standards?

解説: (JPNTest メンバーにのみ表示されます)
When is metal fiber reinforcement used in castable refractory?

解説: (JPNTest メンバーにのみ表示されます)
Maximum allowable crack length, visible on the surface of a dense firebrick, is:

解説: (JPNTest メンバーにのみ表示されます)
What abrading media is required in the ASTM C-704 abrasion-resistant test?

解説: (JPNTest メンバーにのみ表示されます)
Refractory samples cast during the mock-up are cured for a minimum of:

解説: (JPNTest メンバーにのみ表示されます)
A layer coat of refractory lining that is applied to an existing lining in an attempt to extend the lining's life is known as:

解説: (JPNTest メンバーにのみ表示されます)
The quantity of manufactured refractory that has the same formulation as that prepared in an uninterrupted manufacturing operation is called a:

解説: (JPNTest メンバーにのみ表示されます)

弊社を連絡する

我々は12時間以内ですべてのお問い合わせを答えます。

オンラインサポート時間:( UTC+9 ) 9:00-24:00
月曜日から土曜日まで

サポート:現在連絡