(A)Specify a negative offset time in the strategy profile.
(B)Specify a positive offset time in the strategy profile.
(C)Specify a positive planning horizon in the strategy profile.
(D)Specify a negative lanning horizon in the strategy profile.
(A)Material Requirements Planning (MRP)
(B)Integrated Business Planning (IBP)
(C)Supply Chain Management(SCM)
(D)Capacity Requirements Planning (CRP)
(A)The Change Planning Direction indicator is set in strategy profile.
(B)The work center has several invidula capacities.
(C)The finite Scheduling indicator is NOT set in the strategy profile.
(D)Alternative work centers are fully occupied.
(A)When multiple materials also have similar BOMs
(B)When a material has a configurable BOM
(C)When multiple materials have multiple BOMs
(D)When a material has multiple BOMs
(A)Non-stock item
(B)Work item
(C)Variable-size item
(D)WBS item
(A)In which storage location is the BOM required?
(B)Which Valid To information is necessary?
(C)What status does the BOM have?
(D)Is the material type allowed in the BOM?
(A)The assigned routing must be a rate routing.
(B)The lot size range must be within the lot-size range of the assigned routing.
(C)The assigned routing and bill of materials (BOM) must be valid in the entire validity period.
(D)The deletion flag must NOT be set for the bill of materials (BOM) or the routing.
(E)The assigned routing must NOT have alternative sequences.
(A)Creation, release, settlement, goods issue, confirmation, goods receipt
(B)Creation, availability check, release, material widrawal, confirmation
(C)Creation, release, printing, goods issue, confirmation, goods receipt
(D)Creation, printing, release, goods issue, confirmation, goods receipt
(A)Queue time
(B)Wait time
(C)Transportation time
(D)Setup time