NACE-CIP2-001 無料問題集「NACE Coating Inspector Level 2」
You are working as the only in-house NACE Level 2 Inspector in a shop setting when an independent 3 rd party NACE Level 3 Inspector, representing the owner, presents you with a copy of a Non Conformance Report (NCR) he has written for a NACE2/SSPC SP 10 centrifugal blast which you had previously approved.
Your FIRST preferred course of action is to:
Your FIRST preferred course of action is to:
正解:D
解答を投票する