試験準備には欠かさないトップクラスのAPICS CPIM試験学習ガイド練習問題最新版 [Q330-Q355]

Share

試験準備には欠かさないトップクラスのAPICS CPIM試験学習ガイド練習問題最新版

今すぐCPIM問題を使おうCPIM問題集PDFで合格しよう

質問 330
What will be the impact on inventory turns if average inventory levels are cut in half and all other operating conditions remain the same?

  • A. Turns will double
  • B. Turns will be cut in half
  • C. Turns will remain constant
  • D. Turns will increase by the square root of 2

正解: A

 

質問 331
Utilization can be determined from:

  • A. Historical records
  • B. Efficiency
  • C. Both A And B
  • D. Work sampling study

正解: C

 

質問 332
Which of the following situation that will leads or generates Exception messages?

  • A. Open orders for which the timing or quantity of scheduled receipts does not satisfy the plan.
  • B. Situations in which the standard lead times will result in late delivery of a Zero-level part
  • C. Components for which planned orders are in the action bucket and which should be considered for release
  • D. All of the above

正解: D

 

質問 333
An index of the relative priority of an order to other orders at a work center is referred to as:

  • A. Aspect ratio
  • B. Critical ratio
  • C. Priority ratio
  • D. Schedule ratio

正解: B

 

質問 334
is that portion of firm's inventory and planned production that is not already committed and is available to the customer.

  • A. Safety stock
  • B. Available to produce
  • C. Available to promise
  • D. None of these

正解: C

 

質問 335
A manufacturer's decision to extend the degree of forward integration should be influenced by its desire to do which of the following?
1. Reduce the uncertainty of demand
2. Erect barriers to potential competitors
3. Reduce the number of processes to be controlled

  • A. III only
  • B. I only
  • C. I, II, and III
  • D. I and II only

正解: D

 

質問 336
Capacity is the quantity of work done and not the rate of doing work.

  • A. True
  • B. False

正解: B

 

質問 337
* Pareto charts
* Check sheets
* Process flowcharts
* Sactterplots
* Cause and effect diagram
These are the:

  • A. Quality control tools
  • B. None of these
  • C. Control charts
  • D. demand measurements

正解: B

 

質問 338
MRP and CRP should form part of a/an?

  • A. Workable plan that meets the priority objectives
  • B. Balanced system
  • C. Closed-loop system
  • D. Open system

正解: C

 

質問 339
What may vary depending upon the interest rates, the credit rating of the firm, and the opportunities the firm may have for investment?

  • A. Item cost
  • B. Capital cost
  • C. Normal cost
  • D. Inventory cost

正解: B

 

質問 340
Capacity planning links the various production priority schedules to :

  • A. All of these
  • B. Manufacturing plans
  • C. MRP
  • D. Manufacturing resources

正解: D

 

質問 341
When a quantity of an item equal to the order point quantity is set aside and not touched until all the main stock is used up, this strategy is called:

  • A. Two-bin system
  • B. Dual system
  • C. Two-fold system
  • D. Wait-for-next strategy

正解: A

 

質問 342
Which of the following details are true about time buckets EXCEPT:

  • A. Needs to avoid future problems
  • B. Can be any length of time convenient to the company
  • C. These are often a week
  • D. Companies can move to daily time buckets

正解: A

 

質問 343
Which of the following is generally a function of the physical distribution system?

  • A. packaging
  • B. Production activity control
  • C. bill of material
  • D. Production planning

正解: A

 

質問 344
The sum of queue, setup, run, wait and move times is known as:

  • A. Direct time
  • B. Lead time
  • C. Guide time
  • D. Principal time

正解: B

 

質問 345
The computer software program that organizes and maintains the bills of material structures and their linkage is called:

  • A. Procurement of material and supplies
  • B. Bills of material processor
  • C. Purchasing record
  • D. Inventory record

正解: B

 

質問 346
Which tactic would successfully reduce cycle stock?

  • A. Increase setup costs
  • B. Reduce ordering costs
  • C. Increase annual usage of an item
  • D. Reduce carrying costs

正解: B

 

質問 347
Extranet is an internet shared by two or more companies.

  • A. True
  • B. False

正解: B

 

質問 348
A work center is to process 150 units of gear shaft SG 123 on work order 333.the setup time is 1.5 hours, and the run time is 0.2 hours per piece. What is the standard time needed or run the order?

  • A. 28 standard hours
  • B. 30 standard hours
  • C. 31.5 standard hours
  • D. 29.5 standard hours

正解: C

 

質問 349
For example, the price for a certain type of product must full within a range for the suppliers to be considered .but being considered does not mean winning the order. so win orders a supplier must have characteristics that encourage customers to choose its products and services over competitors. Those competitive characteristics, or combination of characteristics are called

  • A. Order credentials
  • B. Order achievers
  • C. Order winners
  • D. Order takers

正解: C

 

質問 350
The information for the CRP inputs can be obtained from:

  • A. Routing and work center file
  • B. Open order fie
  • C. All of these
  • D. MRP

正解: C

 

質問 351
What means doing it right the first time and, if something does go wrong, stopping the process and fixing it?

  • A. Quality at the source
  • B. Process balancing
  • C. All of the above
  • D. Quality assurance

正解: A

 

質問 352
With reference to the above example; considering 116 cases produced during the period what is the ending inventory for each period?

  • A. 106 cases
  • B. 107 cases
  • C. 102 cases
  • D. 110 cases

正解: C

 

質問 353
Independent demand is:

  • A. A & C
  • B. Directly related to the demand for any other products or assemblies
  • C. Not related to the demand for any other products or assemblies
  • D. Calculated

正解: C

 

質問 354
Quality and delivery factor of products tend to have increased importance during:

  • A. Maturity phase
  • B. Growth phase
  • C. Decline phase
  • D. Introduction phase

正解: B

 

質問 355
......

無料APICS Certification CPIM試験問題:https://www.jpntest.com/shiken/CPIM-mondaishu