試験C-TS422-2023-JPN トピック3 問題33 スレッド
SAP C-TS422-2023-JPNのリアル試験問題集
問題 #: 33
トピック #: 3
問題 #: 33
トピック #: 3
生産オーダー操作に「発送済み」操作ステータスが設定されている場合のオプションは何ですか? 注: この質問には 2 つの正解があります。
おすすめの解答:C,D 解答を投票する
In SAP S/4HANA, an operation withDispatchedstatus (set in CM21 or PP/DS after scheduling) is assigned a fixed time slot on a work center. Options for rescheduling include:
* You can reschedule the operation using finite scheduling in a planning table(C): In the capacity planning table (CM21) or PP/DS Planning Board (/SAPAPO/CDPS0), you can manually drag-and-drop or use heuristics to reschedule a dispatched operation, respecting finite capacity constraints (work center, CR02, "Relevant to Finite Scheduling").
* You can reschedule the operation in the Manage Work Center Capacity app(D): This Fiori app (SAP GUI equivalent: CM25) allows planners to adjust dispatched operations' schedules by shifting them within available capacity slots, maintaining finite scheduling rules and updating the operation's time.
Lead time scheduling(A) (e.g., in CO02) recalculates the entire order's basic dates, not individualdispatched operations-it's not used post-dispatch.Infinite scheduling in a planning table(B) (e.g., ignoring capacity) isn' t typical for dispatched operations, which are already capacity-constrained. This is per SAP's dispatching options.
* You can reschedule the operation using finite scheduling in a planning table(C): In the capacity planning table (CM21) or PP/DS Planning Board (/SAPAPO/CDPS0), you can manually drag-and-drop or use heuristics to reschedule a dispatched operation, respecting finite capacity constraints (work center, CR02, "Relevant to Finite Scheduling").
* You can reschedule the operation in the Manage Work Center Capacity app(D): This Fiori app (SAP GUI equivalent: CM25) allows planners to adjust dispatched operations' schedules by shifting them within available capacity slots, maintaining finite scheduling rules and updating the operation's time.
Lead time scheduling(A) (e.g., in CO02) recalculates the entire order's basic dates, not individualdispatched operations-it's not used post-dispatch.Infinite scheduling in a planning table(B) (e.g., ignoring capacity) isn' t typical for dispatched operations, which are already capacity-constrained. This is per SAP's dispatching options.
Hamasaki 2026-01-21 02:56:34
コメント
他人の解答コメントを賛成するのも、その解答に一票を入れることになります。したがって、すでに同じ意見の投票コメントが存在する場合、新規コメントをする代わりに賛成することもできます。
コメントを通報する
コメント中
今すぐ 新規登録 / ログイン (無料です)。