試験C-DBADM-2601 トピック1 問題113 スレッド

SAP C-DBADM-2601のリアル試験問題集
問題 #: 113
トピック #: 1
A regional medical devices distributor is preparing an SAP HANA upgrade rehearsal for an on-premises database. The upgrade package is available, and the database is currently running. Before the rehearsal begins, the administrator compares the maintenance checklist with the validation output and finds that the prerequisite check was completed before the latest package was staged. SAP HANA cockpit still shows normal availability, and the technical lead wants to proceed because the system has not reported an error.
The constraint is that the administrator must base the upgrade decision on preparation evidence that matches the current package state. The rehearsal should not begin from validation output created before the final staged artifact was present.
What should the administrator do before starting the rehearsal?

おすすめの解答:B 解答を投票する

Feedback:
This corrects the lifecycle validation timing gap. Confirming the staged package and rerunning prerequisites ensures that package state, preparation checks, execution readiness, and rehearsal evidence are aligned before the upgrade begins.

Arimura 2026-07-19 09:43:16

コメント

正解:
「?」こちらは投票コメントになっております。普通のコメントに切り替えます。
ニックネーム: 送信 キャンセル
投票コメントをあげるごとに、選択した解答の投票数を1つ増やすことができます。

他人の解答コメントを賛成するのも、その解答に一票を入れることになります。したがって、すでに同じ意見の投票コメントが存在する場合、新規コメントをする代わりに賛成することもできます。

弊社を連絡する

我々は12時間以内ですべてのお問い合わせを答えます。

オンラインサポート時間:( UTC+9 ) 9:00-24:00
月曜日から土曜日まで

サポート:現在連絡