A specialty chemicals company is moving selected database workloads from on-premises SAP HANA to SAP HANA Cloud over several phases. The first transition wave met the technical migration target, but the administration team now finds that daily operating procedures still assume a single-environment model. Monitoring ownership, backup responsibility, and operational validation steps are not clearly separated between source and target environments.
Management wants the next phase to continue on schedule, but it also wants to avoid a repeated pattern where technically completed migration waves create avoidable support confusion after handover. A full operating model redesign is out of scope for the current phase.
What is the best next step?

おすすめの解答:C 解答を投票する

Feedback:
This drill introduces the required modernization pressure without overexpanding scope. The technical migration succeeded, but the upstream risk is operational ambiguity across the mixed environment. A phase-specific readiness checkpoint that separates monitoring, backup, and validation ownership for the target environment directly addresses the transition weakness while preserving schedule and avoiding a full redesign.

上野** 2026-07-26 10:22:04

コメント

正解:
?」こちらは投票コメントになっております。普通のコメントに切り替えます。
ニックネーム: 送信 キャンセル
投票コメントをあげるごとに、選択した解答の投票数を1つ増やすことができます。

他人の解答コメントを賛成するのも、その解答に一票を入れることになります。したがって、すでに同じ意見の投票コメントが存在する場合、新規コメントをする代わりに賛成することもできます。

弊社を連絡する

我々は12時間以内ですべてのお問い合わせを答えます。

オンラインサポート時間:( UTC+9 ) 9:00-24:00
月曜日から土曜日まで

サポート:現在連絡