During a site survey for a new wireless deployment in a multifloor office building, an engineer must identify sources of interference and ensure optimal AP placement for 5 GHz coverage.
While walking the site with a spectrum analyzer, the engineer notices periodic spikes in the noise floor on several channels and inconsistent signal strengths reported by the survey tool, despite visually unobstructed paths. Which action must the engineer take next to accurately assess and mitigate the Layer 1 interference?
While walking the site with a spectrum analyzer, the engineer notices periodic spikes in the noise floor on several channels and inconsistent signal strengths reported by the survey tool, despite visually unobstructed paths. Which action must the engineer take next to accurately assess and mitigate the Layer 1 interference?
正解:D
解答を投票する
解説: (JPNTest メンバーにのみ表示されます)
A customer has a single anchor WLC named Anchor A.
Anchor A is in a DMZ and provides guest access. The customer wants to deploy an additional anchor controller named Anchor B to provide redundancy if Anchor A fails. Which design approach should be taken for the guest WLAN priority on the foreign WLC for each anchor WLC?
Anchor A is in a DMZ and provides guest access. The customer wants to deploy an additional anchor controller named Anchor B to provide redundancy if Anchor A fails. Which design approach should be taken for the guest WLAN priority on the foreign WLC for each anchor WLC?
正解:B
解答を投票する
解説: (JPNTest メンバーにのみ表示されます)
A consultant must design a WLAN for a large campus with high AP density, 50-100 clients per cell, 5 Mbps throughput per client minimum, 5 GHz and 2.4 GHz coverage at -67 dBm, and no
802.11b clients. Which two WLAN design approaches meet the requirements? (Choose two.)
802.11b clients. Which two WLAN design approaches meet the requirements? (Choose two.)
正解:C、E
解答を投票する
解説: (JPNTest メンバーにのみ表示されます)
A consulting engineer for a copper mine is trying to extend the network connectivity of autonomous trucks via Cisco IW3702 APs. The WGB design requirements include: latency- sensitive application (truck slows at 10 sec, stops at 20 sec of connection loss), aggressive scanning and roaming, enterprise-grade security without certificates on each AP, multiple clients in different VLANs on the WGB, and channel scan parameters restricted to only channels in the truck path. Which design approach meets the requirements?
正解:B
解答を投票する
解説: (JPNTest メンバーにのみ表示されます)
An engineer must assess an existing company WLAN to determine the possibility for future IEEE
802.11ac Wave 2 wireless deployment. All access switches are Fast Ethernet-capable only, and the wired infrastructure between existing APs and access switches is based on the CAT 6A standard. Which two actions provide maximum support of Cisco 3800 Series access points?
(Choose two.)
802.11ac Wave 2 wireless deployment. All access switches are Fast Ethernet-capable only, and the wired infrastructure between existing APs and access switches is based on the CAT 6A standard. Which two actions provide maximum support of Cisco 3800 Series access points?
(Choose two.)
正解:B、E
解答を投票する
解説: (JPNTest メンバーにのみ表示されます)
A customer has two Cisco wireless controllers named WLC-A and WLC-B. Each controller is in a different building on a campus. The WLCs have different Layer 3 interfaces and broadcast the same SSIDs from their respective APs. Users must remain connected to the same VLAN and maintain their IP addresses during roaming from the APs attached to WLC-A and WLC-B. Which action accomplishes the requirement?
正解:B