(A)threshold
(B)appetite
(C)tolerance
(D)management
(A)Are unpredictable and challenge the Plan Schedule Management process.
(B)Represent both significant and insignificant points in the project and are difficult to anticipate.
(C)Represent a moment in time such as a significant project point or event.
(D)Occur at random times in the project plans.
(A)Report Performance
(B)Perform Quality Control
(C)Perform Quality Assurance
(D)Plan Quality
(A)Project scope statement changes
(B)Change requests
(C)Variance analysis
(D)Project document updates
(A)Plan Cost Management
(B)Determine Budget
(C)Control Costs
(D)Estimate Costs
(A)Resource breakdown structure (RBS)
(B)Project breakdown structure (PBS)
(C)Work breakdown structure (WBS)
(D)Organizational breakdown structure (OBS)
(A)Assumptions logs
(B)Academic studies
(C)Work performance reports
(D)Network diagrams
(A)Mitigate
(B)Transfer
(C)Share
(D)Accept
(A)Control Budget
(A)Benchmarking, expert judgment, and analytical techniques
(B)Expert judgment, analytical techniques, and meetings
(C)Negotiations, pre-assignment, and multi-criteria decision analysis
(D)Statistical sampling, benchmarking, and meetings
(A)Team performance assessments and enterprise environmental factor updates
(B)Project management plan updates and enterprise environmental factor updates
(C)Resource calendars and project management plan updates
(D)Human resources plan changes and project staff assignment updates
(A)Virtual team
(B)Pre-assignment
(C)Negotiation
(D)Acquisition
(A)Avoid
(B)Mitigate
(C)Transfer
(D)Share
(A)-700
(B)-200
(C)200
(D)500