C1000-031 無料問題集「IBM Power Systems Scale-Up Technical Sales」

Amongst which architectures can virtual machines be moved with Live Partition Mobility (LPM)?

Which of the following is a feature exclusive to PowerVM Enterprise Edition?

A customer is evaluating options for a new system to handle a rapidly growing workload. Initial requirements are for 16 cores and 1TB, and growth expected to be 15% per year.
Why should Enterprise Power Systems be marketed over Scale-out systems to this customer?

An IBM Business Partner is installing two systems in two locations for a Disaster Recovery (DR) solution.
Which of the following is the most efficient way to set up production systems for DR of the LPARs operating system disks?

A customer's infrastructure is currently based on a Power System E870 managed by an HMC 7042-CR6 at V8.860 SW level. They are planning to upgrade their server to a new Power System E980.
Which of the following will enable the customer to connect an HMC to the Power System E980?

A customer with a Power System 770 and direct SAN I/O is planning a migration to a Power System E980.
The Power System 770 has four 8Gb PCIe 2-port full-height Fibre Channel adapters with all storage going through the SAN. The customer wants to keep the same WWPNs, and avoid a SAN reconfiguration.
What procedure should be recommended?

An installation engineer has configured a new POWER9 processor-based server with two VIOS partitions. The client is questioning the use of resources for two VIOS partitions instead of one.
What benefit does the dual VIOS configuration provide?

A customer has used Trial Capacity on Demand on their Power System E980 for two months to test the effect of activating two additional cores and 32GB of additional memory for their SAP LPAR. Being satisfied with the test result, they bought a permanent activation of the two cores and 32GB memory.
They now want to do another short test that requires the activation of one additional core.
Which option provides the most cost-effective solution?

Which tool is recommended to assist in the design and deployment of partitions?

A customer wants to transfer existing licenses for PowerHA from a Power System E880 to a new Power System E980.
What service, if any, will allow the customer to do this?

弊社を連絡する

我々は12時間以内ですべてのお問い合わせを答えます。

オンラインサポート時間:( UTC+9 ) 9:00-24:00
月曜日から土曜日まで

サポート:現在連絡