C1000-031 無料問題集「IBM Power Systems Scale-Up Technical Sales」
A customer with a Power System 770 and direct SAN I/O is planning a migration to a Power System E980.
The Power System 770 has four 8Gb PCIe 2-port full-height Fibre Channel adapters with all storage going through the SAN. The customer wants to keep the same WWPNs, and avoid a SAN reconfiguration.
What procedure should be recommended?
The Power System 770 has four 8Gb PCIe 2-port full-height Fibre Channel adapters with all storage going through the SAN. The customer wants to keep the same WWPNs, and avoid a SAN reconfiguration.
What procedure should be recommended?
正解:B
解答を投票する
A customer has used Trial Capacity on Demand on their Power System E980 for two months to test the effect of activating two additional cores and 32GB of additional memory for their SAP LPAR. Being satisfied with the test result, they bought a permanent activation of the two cores and 32GB memory.
They now want to do another short test that requires the activation of one additional core.
Which option provides the most cost-effective solution?
They now want to do another short test that requires the activation of one additional core.
Which option provides the most cost-effective solution?
正解:A
解答を投票する