CLSSGB 無料問題集「GAQM Certified Lean Six Sigma Green Belt (CLSSGB)」

Voice of the Customer is a Lean Six Sigma technique to determine ____________________ attributes of a product or service.

Lean had its origins in the development and practice of the ___________ Production System.

The use of Kanbans work best with pull systems for determining the timing of which products or services are produced.

Examples of Mistake Proofing for a laptop computer include which of these? (Note: There are 2 correct answers).

正解:A、D 解答を投票する
According to a manager it takes an average weekday commute of 39 minutes with a Standard Deviation of 7 minutes for the employees to get to work while they use their personal vehicles for their office commute while the management set a policy of not more than 40 minutes for their daily one-way commute. A survey conducted one day on 70 employees showed an average of 34 minutes commuting time using the metro public transportation system with a Standard Deviation of 21 minutes. If the Standard Deviation is uncontrollable then the other option to increase the probability of coming in on time via personal vehicles to work could be ____________?

According to the definition of Rolled Throughput Yield which of these items best describe
the purpose of RTY?

Process Capability is a function of which of these?

The Z score is a measure of the distance in Standard Deviations of a sample data point from the Median of the sample population.

The reason(s) for not marking the customer Specification Limits (SL) on a Control Chart is which of these? (Note: There are 4 correct answers).

正解:A、B、C、E 解答を投票する
Measurement System Analysis is a procedure used to quantify all ____________ in the method or system used for taking measurements.

弊社を連絡する

我々は12時間以内ですべてのお問い合わせを答えます。

オンラインサポート時間:( UTC+9 ) 9:00-24:00
月曜日から土曜日まで

サポート:現在連絡