CTAL-TM-001 無料問題集「ISTQB Certified Tester Advanced Level - Test Manager」

What occurs In the retrospective closing?

解説: (JPNTest メンバーにのみ表示されます)
Your project manager has requested that you run management reviews in her absence. Which two of the following might you be expected to do at these reviews?
a. Check for defects in requirements documents.
b. Check the process to see if it passes the assessment.
c. Check the consistency of the project plan.
d. Check compliance by conducting evidential interviews
e. Check adequacy of management procedures.
f. Check contractual compliance for a software product Select one correct answer from the options below:

You are Test Manager on a major project that is of strategic importance to your company. Your team has access to a suite of testing tools that provide support across the development life cycle and this suite of tools has been in place for the last two projects. You are concerned that the suite does not have an integrated defect management tool and have negotiated a small budget to find and implement such a tool. Your first choice is an open source tool that has been available for just over a year and appears to be popular with its users, who have found it easy to learn. The main disadvantage of the tool would be that current manual defect management processes would need to be modified to embrace use of the tool.
Which of the following would be the MAIN risk to consider in deciding whether or not to acquire the defect management tool? SELECT ONE OPTION

You have been assigned t o a project that has a very tight schedule. In fact, given your first analysis you do not think the planned test execution can be completed within the schedule There is no time allowed for defect fixing or for repeating tests. Regression testing has been left out of the planning entirely There is no time to develop test automation. The team has agreed that this Is not the way to run a project, yet they are stuck with the current schedule Given this information what is the best way to proceed with the testing to try to meet the deadline with the best outcome1?

解説: (JPNTest メンバーにのみ表示されます)
When, at a minimum, should project risks be re-evaluated? [1]

You tend to be conservative in your project estimations because you know how many things can go wrong and extend the schedule. You manager is not happy with your estimates and thinks you are being too negative with your numbers and not trying hard enough Which estimation method should you use to provide your manager with a positive' number while still also providing the number you think is more realistic?

解説: (JPNTest メンバーにのみ表示されます)
Which of the following aspects should test progress metrics be mapped to? [1]

解説: (JPNTest メンバーにのみ表示されます)
Which one of the following metrics would be MOST suitable for helping to determine whether test analysis and design is complete? SELECT ONE OPTION

Which of the following can demotivate a tester? [1]

解説: (JPNTest メンバーにのみ表示されます)
Assume that you are working for a company that has maintained and tested a car parking permit system for many years. The system holds the name and address of permit holders and automatically writes to the permit holder with a form to renew or cancel their permit each year.
The test plan states the following:
"since the system is considered a stable system. Boundary Value Analysis is the only test case design technique that needs to be applied during testing" Consider the following change that was detailed in the Requirements Specification for a replacement to an existing parameter held within the system;
* The specified renewal date for each permit must be not be after 31 st January 2020. Which one of the following is a valid test condition that satisfies both the requirement and the test plan?
SELECT ONE OPTION

弊社を連絡する

我々は12時間以内ですべてのお問い合わせを答えます。

オンラインサポート時間:( UTC+9 ) 9:00-24:00
月曜日から土曜日まで

サポート:現在連絡