CTFL-AT 無料問題集「ISQI ISTQB Certified Tester - Foundation Level Extension - Agile Tester」
Consider an online application that allows registered users to pay the annual car tax based on the vehicle's engine power in kW. Given the following user story:
"As a customer I need the online application to calculate the annual car tax amount that I need to pay for my car:
* If the power of the vehicle is less than 20 kW, then the annual car tax is free
* If the power of the vehicle is more or equal than 20 kW but less or equal than 150 kW, then the annual car tax is 250 Euros
* If the power of the vehicle is more than 150 kW, then the annual car tax is 750 Euros" What is the MOST suitable use of a black-box test design technique for this user story?
"As a customer I need the online application to calculate the annual car tax amount that I need to pay for my car:
* If the power of the vehicle is less than 20 kW, then the annual car tax is free
* If the power of the vehicle is more or equal than 20 kW but less or equal than 150 kW, then the annual car tax is 250 Euros
* If the power of the vehicle is more than 150 kW, then the annual car tax is 750 Euros" What is the MOST suitable use of a black-box test design technique for this user story?
正解:D
解答を投票する
解説: (JPNTest メンバーにのみ表示されます)
You have been asked to execute an exploratory testing session on Park & Ride system. The test charter has been titled as "Buy a bus ticket". As a result, a number of defects were reported, the titles of which are listed below.
Which defect is out of scope for the given test charter?
Which defect is out of scope for the given test charter?
正解:C
解答を投票する
解説: (JPNTest メンバーにのみ表示されます)
A Scrum project is aimed at developing an online travel website based on an IBE (Internet Booking Engine), to provide booking of flights. The website will allow customers to specify their travel requirements, and once these requirements are received, the website will offer a list of available flights which customers can book. A single Scrum team will work on this project and the project will start with a Sprint Zero.
Which of the following statements best describes how a tester on the Scrum team should contribute during the Sprint Zero?
Which of the following statements best describes how a tester on the Scrum team should contribute during the Sprint Zero?
正解:D
解答を投票する
解説: (JPNTest メンバーにのみ表示されます)