Refer to the exhibit.

A large hospital chain has approached you to redesign their storage infrastructure. The head of IT believes their requirement is for 100 TB of RAW capacity.
They want to consolidate their PACS, file shares and home directories onto one cluster and require very fast enumeration of the directories. The following are the notes from meetings with the department heads.
Which is the best cluster configuration that meets the customer's requirements?

A large hospital chain has approached you to redesign their storage infrastructure. The head of IT believes their requirement is for 100 TB of RAW capacity.
They want to consolidate their PACS, file shares and home directories onto one cluster and require very fast enumeration of the directories. The following are the notes from meetings with the department heads.
Which is the best cluster configuration that meets the customer's requirements?
正解:A
解答を投票する
A European Sports TV network is considering Isilon for their Media Edit Storage for their editing workloads. They are also considering Isilon for near-line media archiving.
The network receives XDCAM HD footage which is loaded onto their existing Transcoding Storage platform. New footage that needs to be edited will be transferred from their Transcoding Storage platform to the proposed Media Edit Storage platform at the rate of ten simultaneous XDCAM HD files via FTP.
Edited files will be transferred back to the Transcoding Storage platform at the rate of ten simultaneous XDCAM HD files via FTP.
The network currently has 15 Final Cut Pro edit stations, 15 Avid edit stations. Proxy software will be used to allow Isilon to act as the storage for the Final Cut Pro and Avid media. Three of those edit stations will be performing content compositing as needed.
The network expects 70 hours of new content per week, and 50 hours of edited content per week. They intend to keep the new and edited content on the proposed Media Edit Storage as a performance tier for
30 days. They would like to retain all new and edited footage proposed Media Edit Storage as a near-line tier for two years.
In addition to the current workloads, the network expects to implement a new Media Asset Management (MAM) solution and has requested the Isilon cluster be capable of supporting 120 MBps read and 120 MBps write to support the MAM requirements.


Based on the described use of the cluster, which node combination is the appropriate choice for the customer's requirements?
The network receives XDCAM HD footage which is loaded onto their existing Transcoding Storage platform. New footage that needs to be edited will be transferred from their Transcoding Storage platform to the proposed Media Edit Storage platform at the rate of ten simultaneous XDCAM HD files via FTP.
Edited files will be transferred back to the Transcoding Storage platform at the rate of ten simultaneous XDCAM HD files via FTP.
The network currently has 15 Final Cut Pro edit stations, 15 Avid edit stations. Proxy software will be used to allow Isilon to act as the storage for the Final Cut Pro and Avid media. Three of those edit stations will be performing content compositing as needed.
The network expects 70 hours of new content per week, and 50 hours of edited content per week. They intend to keep the new and edited content on the proposed Media Edit Storage as a performance tier for
30 days. They would like to retain all new and edited footage proposed Media Edit Storage as a near-line tier for two years.
In addition to the current workloads, the network expects to implement a new Media Asset Management (MAM) solution and has requested the Isilon cluster be capable of supporting 120 MBps read and 120 MBps write to support the MAM requirements.


Based on the described use of the cluster, which node combination is the appropriate choice for the customer's requirements?
正解:C
解答を投票する
A customer has eight X400 24GB RAM that supports 400 client connections today The customer plans to add 400 more clients in the next few months. They are looking at adding an A-Series node to the cluster to help with client connections.
Before they start adding client connections, what hardware change do you recommend?
Before they start adding client connections, what hardware change do you recommend?
正解:A
解答を投票する
A customer is experiencing problems writing data to their PowerScale cluster. You have checked all network settings and authentication sources. No errors are reported on the cluster.
Which command can the customer use to collect information about network activity, network packets, and network latency?
Which command can the customer use to collect information about network activity, network packets, and network latency?
正解:C
解答を投票する
Your customer is looking for a storage solution that will be able to store seven million 3 MB files, which are written and seldom accessed. Read and write operations are both completed by a webbased application, which requires 1.3 Gbps throughput. The customer's network has not been upgraded in many years, so the network interfaces are 1Gbps.
Which cluster configuration would best meet the customer's requirements?
Which cluster configuration would best meet the customer's requirements?
正解:B
解答を投票する