(A)To track software version compatibility
(B)To plan for capacity expansion
(C)To maintain hardware inventory accuracy
(D)To preemptively identify potential hardware failures
(A)Verifying the availability of adequate power sources
(B)Ensuring the floor can support the weight of the hardware
(C)Planning for future expansion
(D)Arranging for specialized cooling systems
(A)Midplane
(B)Suitcase
(C)Front panel
(D)Compute module
(A)Storage and compute node ratios
(B)Data distribution and redundancy settings
(C)Network throughput and latency
(D)Power and cooling requirements
(A)Private interconnects between nodes
(B)Public IP addresses for all nodes
(C)Unrestricted internet access
(D)Serial connection between nodes
(A)It tests the node's compatibility with the cluster environment.
(B)It ensures data is evenly distributed across the cluster.
(C)It provides a mechanism for graceful removal of a node.
(D)It allows the node to join the cluster without disrupting existing operations.
(A)Configuring the BIOS settings according to cluster requirements
(B)Performing a full system backup
(C)Verifying network port configurations
(D)Updating the node's firmware to the latest version
(A)Scheduling downtime for each node individually
(B)Testing the upgrades in a staging environment before deployment
(C)Upgrading the node with the least amount of data first
(D)Ensuring all nodes are upgraded simultaneously to prevent version mismatch
(A)isi cluster smartresume -node
(B)isi node smartfail -revert
(C)isi devices node stopfail
(D)isi device smartfail --node-lnn -stop
(A)Bandwidth limitations
(B)Compliance requirements
(C)Data access frequency
(D)Cloud storage costs