DCDC-002 無料問題集「BICSI Data Center Design Consultant - DCDC」

What are the speed and distance limitations of ESCON?

What is the preferred location of the power distribution unit?

What are the equipment clearance/access requirements when designing the door openings and loading dock areas for a data center?
正解:
Clearance requirements of 10' L x 4' W x 8' H and 7500 pounds
What is the benefit to locating the power distribution unit supporting equipment outside the computer room

解説: (JPNTest メンバーにのみ表示されます)
where is the storage room located?

What is the minimum distance recommended between a data center's backup generator and the main data center building?

What is the recommended floor loading capacity for a data center?

Which network topology uses the least amount of cabling?

What is the ASHRAE min and max dew point

What is the minimum slab floor to ceiling height recommended?