You are working in a data center with multiple servers and need to update the iLO 5 user names and passwords on a regular basis. Which tool enables you to streamline and automate this process?
You are designing a server solution that requires a significant amount of memory. Which guideline should you keep in mind when working with memory channels?
You are installing HPE ProLiant servers into a rack that will be fully loaded. You also need to install four power distribution units (PDUs) in the rack. How should you install the PDUs to maximize power distribution and space efficiency?
You are designing a network for a customer that needs a centrally-managed solution for their physical and virtual switches. This product must integrate with their existing third-party networking equipment. Which HPE management solution meets the customer's needs?
You are installing multiple components into an existing server. Which HPE resource can you use to verify the compatibility of the server hardware options with the server? (Choose two.)
You are upgrading firmware on two SN6000 switches in a fabric with a CLI connection. You did not wait for the upgrade to be activated on the first switch before beginning to install the firmware on the second switch. What must you do to install the firmware on the second switch?