HPE2-T27 無料問題集「HPE Synergy Solutions」
The compute modules in the Synergy Frame should use a single mezzanine card for both their storage and network traffic. The cards connect to an HPE VC SE 40Gb F8 Module for the interconnect module. The customer needs these uplinks on the interconnect module:
* two 40GbE links to the data center core
* two 8Gbps Fibre Channel links to a SAN switch
What does the interconnect module require to support the desired uplinks?
* two 40GbE links to the data center core
* two 8Gbps Fibre Channel links to a SAN switch
What does the interconnect module require to support the desired uplinks?
正解:D
解答を投票する
An HPE Synergy Frame contains two HPE D3940 Storage Modules in bays 1-4 and eight
HPE Synergy 480 Compute Modules in bays 5-12 The storage modules require redundant connections.
In which bays should the architect install the interconnect modules for connecting the compute modules to the storage modules?
HPE Synergy 480 Compute Modules in bays 5-12 The storage modules require redundant connections.
In which bays should the architect install the interconnect modules for connecting the compute modules to the storage modules?
正解:D
解答を投票する