Which strategy could be incorporated into the negotiations of a lease agreement between a tenant and building owner to contribute towards earning a LEED credit?

解説: (JPNTest メンバーにのみ表示されます)
Which of the following is required for a cooling tower and evaporative condenser in the Water Efficiency Prerequisite, Indoor Water Use Reduction?

解説: (JPNTest メンバーにのみ表示されます)
A project is pursuing Indoor Environmental Quality Credit, Interior Lighting, Option 1. Lighting Control.
Which lighting control could the design team specify to meet the credit requirements for open-office workstations?

解説: (JPNTest メンバーにのみ表示されます)
A project team wants to achieve Materials and Resources Credit, Building Product Disclosure and Optimization - Material Ingredients. By what means can a product demonstrate their material ingredient optimization?

解説: (JPNTest メンバーにのみ表示されます)
In a goal-setting workshop, a project team identifies that teleworking could reduce building area and therefore the required plug loads. What is a requirement for the documentation of the energy-related systems of the Integrative Process worksheet?

解説: (JPNTest メンバーにのみ表示されます)
A renovation project includes both a new kitchen sink and shower and an existing lavatory and water closet within the LEED project boundary. How would the project perform the Water Efficiency Credit, Indoor Water Use Reduction calculations?

解説: (JPNTest メンバーにのみ表示されます)
Which of the following are regularly occupied spaces in a commercial application?

解説: (JPNTest メンバーにのみ表示されます)
Using the scale of 0 = no view and 5 = maximum view, what is the view factor in the diagram below, as defined in Indoor Environmental Quality Credit, Quality Views?

解説: (JPNTest メンバーにのみ表示されます)
What primary role does the LEED AP have during the LEED certification process?

解説: (JPNTest メンバーにのみ表示されます)
A Client is fitting out a building with area 20,500 ft2 (1 904.5 m2) and wishes to pursue the Energy and Atmosphere Credit, Enhanced Commissioning. Who may be appointed as the Commissioning Authority (CxA) for the project?

解説: (JPNTest メンバーにのみ表示されます)