NCSE-Level-1 無料問題集「Nutanix Certified Systems Engineer (NCSE): Level 1」
During a sales motion with a new prospect, the prospect and SE agree to evaluate Nutanix and a computing platform using XRay.
The prospect is currently using 3-tier architecture and considering Nutanix and HPE Simplivity.
Which two details must be discussed with the prospect before the POC starts? (Choose two)
The prospect is currently using 3-tier architecture and considering Nutanix and HPE Simplivity.
Which two details must be discussed with the prospect before the POC starts? (Choose two)
正解:C、D
解答を投票する
A customer is asking for a quote for a hybrid cluster to run general purpose VMs and an ERP application containing a 500GB database. The customer has a VSAN ReadyNode quote already and looking for a comparable Nutanix solution. They share the following specifications
3 hosts
2 x E5-2640v4 CPU
512GB RAM
1 x 480GB SSD
2 x 8TB HDD
2 x 1GB NIC
Which two aspects of the requested configuration should cause concern and need for further discovery?
(Choose two.)
3 hosts
2 x E5-2640v4 CPU
512GB RAM
1 x 480GB SSD
2 x 8TB HDD
2 x 1GB NIC
Which two aspects of the requested configuration should cause concern and need for further discovery?
(Choose two.)
正解:B、E
解答を投票する