AN SE determines that a POC is necessary to overcome competitive FUD in an opportunity with an Enterprise account evaluating several HCI solutions. The customer will evaluate three solutions in their datacenter simultaneously over the course of 4 days.
The customer schedules all necessary personnel to be available during this time.
Which two network planning items should the SE determine prior to allocation hardware for the POC?
(Choose two)

正解:A、B 解答を投票する
During a sales motion with a new prospect, the prospect and SE agree to evaluate Nutanix and a computing platform using XRay.
The prospect is currently using 3-tier architecture and considering Nutanix and HPE Simplivity.
Which two details must be discussed with the prospect before the POC starts? (Choose two)

正解:C、D 解答を投票する
A customer who uses Nutanix for mission critical workloads is considering migrating public cloud workloads to Nutanix. The customer has experienced difficulty auditing where applications reside and understanding cloud costs on a per application basis.
Which Nutanix product should be discussed to address the customer'sneeds?

An SE is meeting with a prospect that is refreshing infrastructure in 100 retail locations. Currently the stores use vSphere hosts connected to direct attached storage and are managed by 6 separate vCenter servers. On-site retail staff is unqualified to deal with any hardware break/fix issues.
Which two aspects of Nutanix solution should the SE highlight? (Choose two)

正解:B、C 解答を投票する
Customer requests a 30-day POC to test Microsoft SQL Server performance on Nutanix compared to existing infrastructure.
Which action should be taken to avoid the POC?

A customer is conceded that IT will not be able to take advantage of Nutanix's frequent feature releases due to the man hour requirements of maintaining compliance with industry regulatory controls.
Which item should the SE discuss at the next customer visit with IT?

An SE builds a sizer scenario for a prospect's remote site running on an NX-1365S-G5.
Using only the sizer BOM. which two actions can be performed? (Choose two.)

正解:B、E 解答を投票する
A prospect is evaluating vSphere alternatives and has received FUD regarding AHV. The SE gives a demo and provides relevant case studies, but the prospect still requests a POC.
What additional option should the SE recommend to avoid a POC?