ST0-151 無料問題集「Symantec Control Compliance Suite 11 Technical Assessment」

How does Symantec Control Compliance Suite 11.0 help achieve the Assess Technical Controls business objective?

To modify a Published Policy, what must the status be changed to?

A Control Compliance Suite 11.0 user schedules a Policy Acceptance report. After the Report job finishes, the user opens the results and receives the message: 'No data available to generate this report.' The user is sure that certain people have already accepted policies this morning. What should the user do in order to get the data in the report?

A medical supply company with 200 servers needs to implement a small scale deployment of Symantec Control Compliance Suite 11.0. The minimum requirements recommend a single computer system to host the CCS Application Server and the CCS Manager in most roles. Which CCS Manager role should be hosted on a separate CCS Manager system?

The entitlements import process can be refined with the help of rules that are called import settings. Import settings apply to which two control points? (Select two.)

正解:A、B 解答を投票する
Controls are safeguards put into place to protect against a specific risk or threat. Organizations deploy controls to protect physical and business assets from various threats and to mitigate risks to those assets. What are two examples of these types of controls? (Select two.)

正解:C、E 解答を投票する
What must be installed on a computer in order to export evaluation results using the context menu?

What are two requirements for launching the Certificate Management Console? (Select two.)

正解:D、E 解答を投票する
Which deployment model should be used to monitor up to 5,000 assets monthly, based on sizing guidelines?

Which two are required in order to use Response Assessment Module results as policy evidence in Symantec Control Compliance Suite 11.0? (Select two.)

正解:B、C 解答を投票する

弊社を連絡する

我々は12時間以内ですべてのお問い合わせを答えます。

オンラインサポート時間:( UTC+9 ) 9:00-24:00
月曜日から土曜日まで

サポート:現在連絡