Greg is the manager at a car wash and is trying to work out the break-even point of his business. Which of the following pieces of information will he need to consider to understand his break-even point?Select ALL that apply.

正解:A、C、E 解答を投票する
解説: (JPNTest メンバーにのみ表示されます)
Linear Programming (LP) can be adopted bymany business functions. Who out of the following could use LP modelling?Select ALL that apply.

正解:A、C、D 解答を投票する
解説: (JPNTest メンバーにのみ表示されます)
White Moon Ltd, amanufacturing organisation, is consideringoutsourcing transportation. What would be areason for doing this?

解説: (JPNTest メンバーにのみ表示されます)
Company A manufactures wheels for Company B, which manufactures cars. Traditionally, Company A would complete the wheels and conduct quality assessments before sending them to Company B, which would then begin assembling cars. However, a new CEO at Company B has introduced atechnology system that enablessimultaneous production, meaning Company B starts manufacturing cars at the same time Company A begins producing wheels.
What is this new system known as?

解説: (JPNTest メンバーにのみ表示されます)
Jed is theOperations Managerat acake manufacturerand is trying to determine theoptimumcapacityof the factory.
Which of the following would be true if the factoryachieves optimum capacity? SelectALLthat apply.

正解:A、D 解答を投票する
解説: (JPNTest メンバーにのみ表示されます)
What does a forcefield diagram show?

The operations department of ABC Ltd has recently launched a new product. The product is manufactured within a large factory and then sent to retailers for sale. The department has a system in place which details the components required for the product and the quantities required to fulfil customer demand. The system works online and links to other areas of the business including HR and finance.
So far, several large orders have been placed for the product from different retailers. The Chief Operations Officer (COO) has decided to programme the completion of the orders based on when the orders were placed.
The benefit of this strategy is that it will give each customer a similar lead time. Thus far no buffer stock has been created as products are only created when orders are received.
Three teams are required to make the product and the product flows from team one to team two to team three, each team adding a component to the product. Unfortunately, team two are short staffed and are completing their work at a slower rate than the other two teams. This is a huge consideration for the COO as it will impact upon the capacity of the organisation.
The retailers have all signed contracts with ABC Ltd and the COO is extremely happy that they are long term contracts. Contract 1 is with retailer X and the price is set for three years. Contract 2 is with retailer Y and is a five year contract where the price will be reviewed annually in line with CPI. Contract 3 has a variable pricing mechanism based on the volume of products ordered.
What capacity strategy is being used?

解説: (JPNTest メンバーにのみ表示されます)
Which of the following can be used to pre-assess the consequences of a network member not meeting the control requirements set by the organisation?

解説: (JPNTest メンバーにのみ表示されます)
Dan is an Operations Manager at a retail organisation. He is keen to understand more about the types of customers his organisation serves and has therefore devised new KPIs (key performance Indicators) with a customer-centric focus. He is particularly keen to understand which customersegments are providing the organisation with the highest ROI (return on investment). Which customer-centric performance measure should Dan look to introduce?