質問 # 75
What is the acceptable method to temporarily repair a longitudinal crack in an existing piping system?

  • A. Welding over the crack
  • B. Welding a box over the cracked area
  • C. Installing a full encirclement welded split sleeve
  • D. Using a full encirclement welded spilt sleeve, with the approval of the piping engineer

正解:D


質問 # 76
In a piping circuit, which of the following does not routinely have thickness measurements taken?

  • A. Valves
  • B. Straight Run Pipe
  • C. Fittings
  • D. Dead legs

正解:A


質問 # 77
Care should be taken not to during a pressure test.

  • A. use water in the system
  • B. allow any inert gas into the system
  • C. under-pressure the system
  • D. over-pressure the system

正解:D


質問 # 78
When testing cast iron pipe which of the following methods should not be used?

  • A. Radiographic test
  • B. Leak test
  • C. Ultrasonic test
  • D. Hammer test

正解:D


質問 # 79
When environmental or operating conditions produce snow and ice loads, these are considered to be.

  • A. structural loads
  • B. Dead loads
  • C. environmental loads
  • D. live loads

正解:D


質問 # 80
Buried piping inspected periodically by excavation shall be inspected in lengths of:

  • A. 3 feet -5. feet
  • B. Any length as long as It IS Inspected full circumference.
  • C. 6 feet -8 feet.
  • D. Any length as long as it is inspected 180° circumference.

正解:C


質問 # 81
The transmitted film density through the radiographic image of the body of the appropriate hole penetrameter and the area of interest shall be minimum for radiographs made with a gamma ray source.

  • A. 2.0
  • B. 2.2
  • C. 1.8
  • D. 2.6

正解:A


質問 # 82
What is a thermocouple pyrometer?

  • A. A vibration device that generates heat through friction producing a stress relieved weldment
  • B. A device used to check the heat treatment temperature, usually connected by capacitor discharge welding
  • C. A flammable material that, when ignited, will create enough heat to stress relieve piping
  • D. A device taped to the pipe that will record temperature variations

正解:B


質問 # 83
Why should a leaking threaded joint not be tightened while the system is in service?

  • A. A crack in a thread root might fail
  • B. The joint might be unscrewed
  • C. The craftsman should not be near the threaded connection
  • D. Rust or corrosion might be holding the pressure

正解:A


質問 # 84
API 570 covers the inspection of__________.

  • A. In-service vessels
  • B. new construction
  • C. In-service piping
  • D. new tank construction

正解:C


質問 # 85
Impact testing of each form of material for any specification shall be done using procedures and apparatus in accordance with

  • A. ASTM A 370
  • B. ASME Section V
  • C. API 570
  • D. AWS D 1.5

正解:A


質問 # 86
A WPS shall have the referenced

  • A. NACE
  • B. welder
  • C. PDQ
  • D. PQR

正解:D


質問 # 87
On a class 1500 NPS 4 blind flange, what is the minimum thickness permitted?

  • A. 2.88"
  • B. 1.12"
  • C. 1.88"
  • D. 2.12"

正解:D


質問 # 88
What is the most common method used to manufacture tubing?

  • A. Riveted
  • B. Forged
  • C. Seamlessly drawn
  • D. Wire drawn

正解:C


質問 # 89
What is the minimum lifting power of an AC electromagnetic yoke used in magnetic particle inspection?

  • A. 30 pounds lifting power at the minimum pole spacing
  • B. 10 pounds lifting power at the maximum pole spacing
  • C. 40 pounds lifting power at the maximum pole spacing
  • D. 10 amps lifting power at the maximum pole spacing

正解:B


質問 # 90
Which of the following applies to socket welds in piping systems?

  • A. Should be avoided where crevice corrosion may occur
  • B. Should be avoided
  • C. Should be welded using SAW only
  • D. Should be used in all welded piping

正解:A


質問 # 91
The valve used to automatically prevent back flow is valve.

  • A. globe
  • B. gate
  • C. ball check
  • D. slide

正解:C


質問 # 92
The preheat zone shall extend beyond each edge of a pipe weld

  • A. 1"
  • B. 2"
  • C. 2T
  • D. 3T

正解:A


質問 # 93
What is the root face limitation as listed on the attached WPS and PQR

  • A. 3/32"
  • B. Not designated
  • C. No limit
  • D. 1/8"

正解:B


質問 # 94
......