最新の無料C-IBP-2211効率的問題集をダウンロード2023年11月06日更新された80問がある [Q42-Q61]

Share

最新の無料C-IBP-2211効率的問題集をダウンロード2023年11月06日更新された80問がある

SAP C-IBP-2211試験練習テスト解答

質問 # 42
You need to define a new logic for a key figure to drive values from the PERPRODCUSTREGION level to the PERPRODCUST level.Which of the following configuration options are possible for this process?Note: There are 2 correct answers to this question.

  • A. Splitting the values from aggregated to detailed level using multiplication by the proportions
  • B. Splitting the values from aggregated to detailed level, based on a stored split-factor key figure
  • C. Splitting the values from aggregated to detailed level, based on the time profile attribute
  • D. Splitting the values from detailed to aggregated level by using a copy operator

正解:A、B


質問 # 43
What do you need to be aware of when using multiple pairs of key figures in one copy operator? Note:
There are 2 correct answers to this question.

  • A. If necessary target key figures values are disaggregated.
  • B. Copying multiple key figures can be processed sequentially.
  • C. If necessary source key figures values are disaggregated.
  • D. Copying multiple key figures on different planning levels is not possible.

正解:A、B


質問 # 44
Why would you set up a cascading filter in the planning view?Note: There are 2 correct answers to this question.

  • A. To filter attributes based on specific values
  • B. To filter using attributes that have a large number of values
  • C. To filter attributes based on other attribute filters
  • D. To filter data in an Application Job template

正解:A、B


質問 # 45
You are adding a value-based filter to a planning view.Which of the following conditions apply?Note: There are 3 correct answers to this question.

  • A. You can add (or delete) planning objects to a planning view after these filters are applied.
  • B. You can only apply one value-based filter per planning view.
  • C. The alerts dashboard is not available if a value-based filter is set for the open planning view.
  • D. These filters can be used together with attribute totals in the same planning view.
  • E. These filters are always applied based on the values stored in the database.

正解:B、C、E


質問 # 46
Which of these conditions must be met to create a Local Member key figure?Note: There are 2 correct answers to this question.

  • A. Users should have authorization for template administration.
  • B. Activate Local Member Recognition setting is selected.
  • C. Use Excel Cell References in the Report Editor option is selected.
  • D. A key figure is selected in the Key Figures tab in the SAP IBP, add-in for Microsoft Excel.

正解:A、B


質問 # 47
Which of the following are features of lag-based snapshots?Note: There are 2 correct answers to this question.

  • A. Lag-based snapshots are created in the Configuration app for a fixed time range.
  • B. The number of lag-based snapshots are limited to nine levels.
  • C. Target key figures for these snapshots are exposed to the user in planning views.
  • D. Target key figures for these snapshots must have lag as a root attribute in its base planning level.

正解:A、D


質問 # 48
Which features apply to quota violations modeled with the optimizer?

  • A. Quotas can be modeled for sourcing location, production, and consensus demand.
  • B. Min and Max Quotas have to be the same as sourcing ratios.
  • C. Because quota violations shouldn't be possible, the non-delivery cost rate is less than quota violation cost.
  • D. The optimizer will only violate quotas if quotas are maintained as time-dependent key figures.

正解:C


質問 # 49
What are the outputs of the Calculate Target Inventory Components Operator?Note: There are 3 correct answers to this question.

  • A. Component Usage
  • B. Reorder Point
  • C. Recommended Safety Stock
  • D. Target Pipeline Stock
  • E. Target Cycle Stock

正解:C、D、E


質問 # 50
You need to create time periods for the time profile in a planning area.What should you be aware of when running the Create Time Periods application job?

  • A. The assigned Planning Area must be active.
  • B. A time profile has to be activated so that the application job can proceed.
  • C. This application job can be run for multiple time profiles at once.
  • D. In the Parameter Section of the application job, choose the Time Profile ID and Planning Area.

正解:D


質問 # 51
Which conditions have to be fulfilled as a prerequisite to maintain a key figure disaggregation?Note: There are 2 correct answers to this question.

  • A. The key figure is calculated and system editable.
  • B. The key figure is calculated and all editable.
  • C. The key figure is stored and system editable.
  • D. The key figure is stored and all editable.

正解:D


質問 # 52
You are setting up planing with lot sizes.What are some of the properties of lot sizes that you need to be aware of?Note: There are 2 correct answers to this question.

  • A. Lot sizes are time-independent master data settings.
  • B. Periodic lot size setting overrides the minimum lot size.
  • C. Lot sizes are applicable for production and transportation quantities.
  • D. Lot sizes are applicable for production and handling quantities.

正解:A、D


質問 # 53
Which of the following checks for master data and key figures does the Check Mode algorithm trigger?Note: There are 3 correct answers to this question.

  • A. It checks whether the location resource specified in the master data forms a cycle in the supply chain network.
  • B. It checks whether the sourcing in the Production Source Item Master Data type exists.
  • C. It checks whether the required planning level master data exists for a subset of input key figures.
  • D. It checks whether the heuristic detects cycles formed by nodes (such as location products) in the supply chain network.
  • E. It checks whether the location products specified in the master data are connected by customer sourcing rules within the supply chain network.

正解:C、D、E


質問 # 54
You are evaluating criteria for choosing the solver to support planning for a complex supply chain. What are some of the points that should be reviewed?Note: There are 2 correct answers to this question.

  • A. Finite heuristics can achieve demand prioritization and pegging.
  • B. Planning results can be generated faster by the optimizer.
  • C. Push and Pull production models are used by the optimizer.
  • D. Prioritization of demand elements one by one is achieved by unconstrained heuristics.

正解:A、C


質問 # 55
Which of the following key functions are supported by SAP IBP for sales and operations?Note: There are
2 correct answers to this question.

  • A. Time series analysis
  • B. Multi-Level Supply Planning Heuristics
  • C. Simple statistical forecast
  • D. Scenario analysis for operational supply planning

正解:B、C


質問 # 56
You are invited to review a problem with a customer's SAP IBP Excel template performance.What areas with the biggest potential performance impact would you focus on?Note: There are 2 correct answers to this question.

  • A. Complex calculation graphs for key figures
  • B. Number of analytics charts displaying key figures' values
  • C. Number of local members and complexity of calculations
  • D. Excessive SAP IBP formatting in the Microsoft Excel UI

正解:A、D


質問 # 57
Analytics charts are created by the user in the Advanced Analytics application.What can the user do in the Advanced Analytics app?Note: There are 2 correct answers to this question.

  • A. Group data.
  • B. Apply filters on your data.
  • C. Merge charts together.
  • D. Open graphics in Excel.

正解:A、B


質問 # 58
You are working on a mid-range plan that spans the seasonal peak and you are evaluating the need for additional crewing.Which of the following parameters can you model to plan production with extra shift(s)?

  • A. Capacity expansion with additional costs
  • B. Production source validity at the start of seasonal peak
  • C. Adjusted production interactive values
  • D. Incremental production values

正解:A


質問 # 59
Safety Stock outputs from Multistage Inventory Optimization are sent to which of these processes?
Note: There are 2 correct answers to this question.

  • A. Charts creation in SAP Supply Chain Control Tower
  • B. Supply Heuristics in SAP IBP for sales and operations
  • C. Decoupling Points determination in SAP IBP for demand-driven replenishment
  • D. Demand Sensing with Gradient Boosting (Full)

正解:B、D


質問 # 60
Which applications are present in the sample model SAPIBP1?Note: There are 3 correct answers to this question.

  • A. Inventory Optimization
  • B. Demand Sensing
  • C. Sales and Operations Planning
  • D. Response Planning
  • E. Demand Driven Replenishment

正解:A、B、C


質問 # 61
......

最新の検証済みC-IBP-2211問題集と解答合格保証もしくは全額返金です:https://www.jpntest.com/shiken/C-IBP-2211-mondaishu

最新の認証試験C-IBP-2211問題集練習テスト解答はこちら:https://drive.google.com/open?id=1pJIZh15dITedo4-tYSkVbMRYJ_LExsUy

弊社を連絡する

我々は12時間以内ですべてのお問い合わせを答えます。

オンラインサポート時間:( UTC+9 ) 9:00-24:00
月曜日から土曜日まで

サポート:現在連絡