
[2022年01月] 実際問題を使ってC-S4CSC-2108無料問題集サンプルと問題と練習テストエンジン
合格させるSAP C-S4CSC-2108試験問題でテスト復刻エンジンとPDF
質問 27
The stock value is calculated based on price and stock quantity. Which date determines the correct quantity in the Analytical Apps for Inventory and Warehouse Management?
- A. The selected reporting date
- B. The goods receipt date
- C. The material production date
- D. The purchase order date
正解: A
質問 28
Which of the following are outcomes of the Fit-to-Standard workshop? Note: There are 3 correct Answers to this question.
- A. Identification of source code changes
- B. Expert configuration definition
- C. Extensibility solutions to close gaps
- D. Solution impact on business processes
- E. Finalized scope and integration requirements
正解: B,C,D
質問 29
What are key activities of the Prepare phase of the SAP Activate methodology? Note: There are 3 correct Answers to this question.
- A. Data migration
- B. Project setup
- C. Customer self-enablement
- D. User training
- E. Starter system provisioning
正解: B,C,E
質問 30
Which of the following criteria are part of the definition of a stock management unit for the physical inventory in Inventory Management? Note: There are 3 correct Answers to this question.
- A. Batch number
- B. Material group
- C. Plant
- D. Material number
- E. Warehouse number
正解: A,C,D
質問 31
How can shipped stock be monitored in the Cross-Plant Transfer Posting (1P7) scope item?
- A. As blocked stock in the delivering plant
- B. As transfer stock in the receiving plant
- C. As transfer stock in the delivering plant
- D. As blocked stock without plant assignment
正解: B
質問 32
In what phase of the SAP Activate methodology do you test the business processes?
- A. Prepare
- B. Deploy
- C. Explore
- D. Realize
正解: D
質問 33
What types of situations does Situation Handling support? Note: There are 2 correct Answers to this question.
- A. event-based
- B. message-based
- C. role-based
- D. object-based
正解: B,D
質問 34
When configuring the Product Availability Check, which of the following can you decide to exclude from the available stock? Note: There are 3 correct Answers to this question.
- A. Subcontractor Stock
- B. Blocked Own Stock
- C. Unrestricted-Use Supplier Consignment Stock
- D. Stock in Transfer
- E. Unrestricted-Use Own Stock
正解: A,B,D
質問 35
Which organizational units are directly linked to a plant? Note: There are 2 correct Answers to this question.
- A. Credit control area
- B. Company code
- C. Storage location
- D. Sales office
正解: B,C
質問 36
What needs to be activated as a prerequisite for using a product allocation check? Note: There are 2 correct Answers to this question.
- A. The availability check against product allocation for basic Available-to-Promise
- B. The availability check against product allocation per client
- C. The availability check against product allocation in the context of aATP
- D. The availability check against product allocation in Sales and Distribution
正解: B,C
質問 37
Which of the following options are available for creating inbound deliveries? Note: There are 2 correct Answers to this question.
- A. Manually with reference to a purchase order
- B. Automatically with a background job
- C. Manually with reference to a material document
- D. Automatically when saving a purchase order
正解: A,B
質問 38
What are the prerequisites for using the SAP Fiori Test Your Processes app? Note: There are 2 correct Answers to this question.
- A. The quality system is connected to the Test Execution Service on SAP Cloud Platform
- B. The productive system is connected to the implementation landscape
- C. The test scripts are uploaded in the productive system
- D. SAP Best Practices are activated in the quality system
正解: A,D
質問 39
You procure some materials exclusively via subcontracting. You want Material Requirements Planning (MRP) to create subcontract purchase requisitions for these materials instead of normal purchase requisitions. What must you do for each of these materials? Note: There are 2 correct Answers to this question.
- A. Set a special MRP group for subcontracting in the material master record
- B. Create a routing with an operation to be processed externally
- C. Set a special procurement type for subcontracting in the material master record
- D. Create a bill of material with the components to be provided
正解: C,D
質問 40
In a direct material procurement process, what can you use App Manage Material Coverage for? Note:
There are 3 correct Answers to this question.
- A. Revoke acceptance of shortage for selected materials
- B. Convert a purchase requisition into a purchase order
- C. Create forecast delivery schedules for the material being processed
- D. Mark a purchase order change request to the supplier
- E. Start an MRP run for the material being processed
正解: B,D,E
質問 41
What is one purpose of the Supply Protection (SUP) feature?
- A. Propose framework agreements with suppliers to secure supply quantities
- B. Sell products in the sequence of incoming customer orders
- C. Protect yourself from unreliable suppliers
- D. Reserve quantities for a category of customers
正解: B
質問 42
Which of the following business areas are part of the Line of Business Supply Chain, but are covered in separate courses? Note: There are 2 correct Answers to this question.
- A. Transportation Management
- B. Warehouse Management
- C. Inventory Management
- D. Advanced Order Promising
正解: A,B
質問 43
......
あなたを合格させるC-S4CSC-2108お手軽に試験合格リアルC-S4CSC-2108練習問題集で更新されたのは2022年01月24日:https://www.jpntest.com/shiken/C-S4CSC-2108-mondaishu