質問 32
When creating a process order , what type of task list is primary used for inspection ? Correct 3

  • A. Equipment
  • B. Routings
  • C. Reference rate routing
  • D. Master recipe

正解: B,C,D

 

質問 33
The call object for scheduling in stability studies is

  • A. all are true
  • B. the inspection lot
  • C. the inspection Group
  • D. the inspection type

正解: A

 

質問 34
Which statements are correct? (More than one answer is true.)

  • A. The quality level is updated depending on the combination of material, vendor, customer, manufacturer, plant, and inspection type.
  • B. During an inspection without a sampling scheme, you should use the inspection severities tightened, normal, or reduced.
  • C. When you create an inspection lot, the sample is determined on the basis of the quality level.
  • D. Different quality levels exist for the different dynamic modification levels.

正解: A,C

 

質問 35
The Early Warning System can be used to monitor critical key figures.

  • A. Correct
  • B. Incorrect

正解: A

 

質問 36
The code groups and codes are maintained in multiple transaction.

  • A. Correct
  • B. Incorrect

正解: B

 

質問 37
The life cycle of a control chart are, (More than one answers are true)

  • A. Creating inspection points and recording results
  • B. Calculating action limits
  • C. Creating a control chart for the first inspection lot
  • D. Creating additional inspection lots, inspection points and inspection results

正解: A,B,C

 

質問 38
If a planned inspection has inspection characteristics assigned to it, then _____.

  • A. the assignment of the sampling procedure takes place at inspection characteristic level.
  • B. the assignment of the sampling procedure takes place at the inspection setup in the QM view of the material master.

正解: A

 

質問 39
During the production inspection, which elements does the system use to determine the layout of results and defects recordings? Note : 3 correct answer

  • A. Confirmation profiles
  • B. Code groups
  • C. Status profiles
  • D. Report type
  • E. Partner profiles

正解: A,B,D

 

質問 40
In warehouse management, the goods receipt inspection is processed using inventory management. The system creates a quant on the interface and, depending on the system settings, creates a transfer requirement in WM.

  • A. Correct
  • B. Incorrect

正解: B

 

質問 41
After you create customer master records, you define second inspection related default specification in the ....
Which of the followings options can you use to control when the quality inspection take place (2 correct ans)

  • A. The inspection occurs after the good issue in posted
  • B. The inspection occurs after the transport order is quit.
  • C. The inspection occurs before the good issue in posted
  • D. The inspection occurs after the release of the sales order.

正解: A,C

 

質問 42
What must you do in configuration to enable defects recording during an inspection with inspection lots? Note: 2 correct answer

  • A. Activate the work flow template
  • B. Define the defect report type
  • C. Assign the notification type to the inspection type.
  • D. Activate reference to Existing notifications.

正解: B,C

 

質問 43
Which are the following control charts for qualitative characteristics? (More than one answers are true)

  • A. np-control chart for the number of nonconforming units
  • B. p-control chart for the fraction of nonconforming units for each sample
  • C. u-control chart for the number of defects for each unit
  • D. c-control chart for the number of defects

正解: A,B,C,D

 

質問 44
Which statements are correct? (More than one answer is true.)

  • A. If you use catalogs, it is easier to record and evaluate qualitative data and describe objects.
  • B. Input processing is intended for non-classed quantitative characteristics like Mean values and Single values.
  • C. In a catalog, information is assigned a unique alphanumeric code and an explanatory text.
  • D. You use catalogs to define, manage and standardize information (for example, defect types, characteristic attributes, tasks) consistently for all clients or plants.

正解: C,D

 

質問 45
Your customer uses MIC and requests automatic defect recording After configuration defect recording the implementation Guide ,which additional steps must you perform to satisfy customer requirements?(2 correct ans)

  • A. Assign a notification type to an inspection type
  • B. Assign an inspection method to your MIC
  • C. Select the radio button to activate quality notification in the defect class
  • D. Activate defects recording in the characteristic control indicator for your MIC

正解: A,D

 

質問 46
If you want to determine the stage at which quality control takes place differently for particular combinations of material and customer, you must store these specifications in the quality info record for sales and distribution.

  • A. Correct
  • B. Incorrect

正解: A

 

質問 47
A valuation may be in recorded for every question in the question list.

  • A. Correct
  • B. Incorrect

正解: A

 

質問 48
Sampling procedures are procedures that determine the sample size for an inspection.

  • A. Correct
  • B. Incorrect

正解: B

 

質問 49
Which statements are correct? (More than one answers are true)

  • A. The MPN profile defines how you can work with MPN materials in the procurement process.
  • B. The function group QEVA_ALTOUANTITY_INPUT contains coding that makes it possible to enter quantities in alternative wells of measure
  • C. An manufacturer part number profile (MPN profile) is assigned to an internal material in the material master.
  • D. Stock posting as generally performed in the Quality unit of measure of the material.

正解: A,C

 

質問 50
You can use the Quality Notifications to support the RMA (Return Material Authorization) process in your company.

  • A. Correct
  • B. Incorrect

正解: A

 

質問 51
If you change this basic data with the history, the changed data is immediately automatically updated in the task list, material specification and certificate profile.

  • A. Correct
  • B. Incorrect

正解: B

 

質問 52
Which are related to mySAP Business Suite? (More than one answer is true.)

  • A. mySap CRM
  • B. mySAP PLM
  • C. SAP xApp Resource & Program Mgmt
  • D. mySAP ERP
  • E. SAP Business One

正解: A,B,D

解説:
Explanation

 

質問 53
......


SAP C_TPLM40_65 認定試験の出題範囲:

トピック出題範囲
トピック 1
  • Configuration and Organization
  • Describe the unique processes for implementing QM in Discrete Manufacturing
トピック 2
  • Describe how QM integrates with Materials Management
  • Implement QM in Discrete Manufacturing
トピック 3
  • Describe the purpose and features of Sample Management
  • Implement & Configure Quality Control
トピック 4
  • Explain the configuration requirements of Quality Planning
  • Implement & Configure Quality Inspection
トピック 5
  • Describe the process of Audit Management
  • Implement & Configure Quality Planning
トピック 6
  • Describe the purpose and features of Quality Certificates
  • Explain the configuration requirements of Quality Control
トピック 7
  • Describe the QM business processes used in Process Industries
  • Integration of QM with S&D and Service

 

最新のC_TPLM40_65試験問題集でSAP試験トレーニング:https://www.jpntest.com/shiken/C_TPLM40_65-mondaishu

弊社を連絡する

我々は12時間以内ですべてのお問い合わせを答えます。

オンラインサポート時間:( UTC+9 ) 9:00-24:00
月曜日から土曜日まで

サポート:現在連絡