[2022年11月06日] 検証済みのOG0-092問題集と75格別な問題 [Q17-Q36]

Share

[2022年11月06日] 検証済みのOG0-092問題集と75格別な問題

OG0-092問題集合格保証付きの合格できるOG0-092試験2022年更新


The Open Group OG0-092 認定試験の出題範囲:

トピック出題範囲
トピック 1
  • ArchiMateツール認定は、ツールがArchiMateモデリングをサポートするための必須要件を満たしていることを保証します。
トピック 2
  • ArchiMate Certification for Peopleは、個人が知識を持っていることを保証する市場主導の教育および認定プログラムです

 

質問 17
Scenario: Rollins Manufacturing
Please read this scenario prior to answering the question
Rollins Manufacturing is a major supplier in the automotive industry, headquartered in Cleveland, Ohio with
manufacturing plants in Chicago, Sao Paulo, Stuttgart, Yokohama, and Seoul. Each of these plants has been
operating its own Manufacturing Requirements Planning (MRPII) system, production scheduling, and custom
developed applications that drive the automated production equipment at each plant.
Rollins is implementing lean manufacturing principles to minimize waste and improve the efficiency of all of its
production operations. During a recent exercise held for internal quality improvement, it was determined that a
significant reduction in process waste could be achieved by replacing the current MRPII and scheduling
systems with a common Enterprise Resource Planning (ERP) system located in the Cleveland data center.
This central system would provide support to each of the plants replacing the functionality in the existing
systems. It would also eliminate the need for full data centers at each of the plant facilities. A reduced number
of IT staff could support the remaining applications. In some cases, a third-party contractor could provide those
staff.
The Rollins Enterprise Architecture department has been operating for several years and has mature, well-
developed architecture governance and development processes that are strongly based on TOGAF 9.At a
recent meeting, the Architecture Review Board approved a Request for Architecture Work from the Chief
Engineer of Global Manufacturing Operations who is the project sponsor. The request covered the initial
architectural investigations and the development of a comprehensive architecture to plan the transformation.
The Common ERP Deployment architecture project team has now been formed, and the project team has
been asked to develop an Architecture Vision that will achieve the desired outcomes and benefits. Some of the
plant managers have expressed concern about the security and reliability of driving their MRPII and production
scheduling from a central system located in Cleveland. The Chief Engineer wants to know how these concerns
can be addressed.
Refer to the Rollins Manufacturing Scenario
You are serving as the Lead Enterprise Architect for the Common ERP Deployment architecture project.
One of the earliest initiatives in the Enterprise Architecture program at Rollins was the definition of a set of IT
principles and architecture principles that are well aligned with the overall enterprise principles. These now
need to be updated to address the concerns raised.
You have been asked to select a set of principles most appropriate for guiding the team to define a robust
solution.
[Note: You should assume that Rollins has adopted the example set of principles that are listed and defined in
TOGAF 9, Section 23.6.]
Based on TOGAF 9, which of the following is the best answer?

  • A. Maximize Benefit to the Enterprise, Business Continuity, Common-use Applications, Data is Shared, Data
    is Accessible, Data is Secure.
  • B. Common-use Applications, Data is Shared, Data is Accessible, Data is Secure, Interoperability, Control
    Technical Diversity.
  • C. Business Continuity, Service-orientation, Data is Accessible, Data is Secure, Responsive Change
    Management.
  • D. Information Management is Everybody's Business, IT Responsibility, Data Trustee, Technology
    Independence, Responsive Change Management.

正解: A

 

質問 18
Please read this scenario prior to answering the question
Worldwide Mobile is a mobile telecommunications company formed through a series of mergers and acquisitions. They are yet to fully integrate the customer service systems for the most recent acquisitions, and as result, customer service has been a major concern for the Chief Technology Officer.
Results for the last two quarters have shown that Average Revenue Per User (ARPU) and the customer retention (Churn) rate have fallen below the industry average. The Corporate Marketing group has published some new finding about customer satisfaction. The customers appear to be switching to Air Light, a competitor, because of superior customer service. WorldwideMobile actually has better coverage in nearly all markets than Air Light, and good roaming agreement that keep rates low for business travellers. But customer satisfaction has remained low.
The Business Strategy group and the Enterprise Architecture group have conducted a high-level project to develop the enterprise-wide strategic plan. They have developed a business scenario which contains a good conceptual model of what needs to be done and also identifies the key requirements. This was used in preparing the proposal presented to the Executive Council and the Corporate Board.
The planning for the program has been underway for several months. WorldwideMobile has selected TOGAF
9 as the basis for its Enterprise Architecture.
The Corporate Board has approved funding for a multi-million Euro conversion to transition to a packaged Customer Service System. It is anticipated that the overall program will take five years to complete, but there are some tactical projects that can commence immediately to address the situation. The Executive Council has stated that the program should define specific initiatives to enable each regional business units to create an implementation of the Customer Service System. The implementation must meet the needs of the business unit and still provide the information needed to enable major improvements to the customer.
Refer to WorldwideMobile-2 Scenario
You are serving as the Lead Architect for the Performance and Integrity project of the Customer Service System program.
The project has been chartered to address the architecture(s) required to support the Customer Service System from an infrastructure perspective. At present time, the project team is conducting an architecture development project that is focused on the customer self service capability, which was defined as part of the earlier strategic planning activities. This capability will enable customers to access their accounts, pay bills, request account reviews, and provision services from any web-enabled device.
The project team has gathered information about the self-service capability, developed a business scenario, and used the results to define an Architecture Vision for achieving the capability.
You have been asked to recommend the course of action to complete the project.
Based on TOGAF 9, which of the following is best answer?

  • A. The remaining architecture definition work should be focused on mapping out the technology and infrastructure capability in the Technology domain. In Phases E and F, the capability should be broken down into a set of Solution Building Blocks that will be implemented to realize the Target Architecture.
    The Solution Building Blocks will provide the basis for the completed Architecture Definition Document that will be submitted for approval. Upon approval, the implementation team will conduct Compliance Assessments to ensure that the self-service capability is compliant with the overall Enterprise Architecture.
  • B. In the remaining architecture definition phases, the project team should map out the capability in the Technology domain. In the Phases E and F, the capability should be broken down into a set of Solution Building Blocks that define the Target Architecture. Where possible, the Solution Building Blocks should be drawn from the Architecture Repository. The completed Architecture Definition Document and the Implementation and Migration Plan will be submitted for approval. Upon approval, the architecture team will conduct Compliance Assessments to ensure that the Target Architecture is properly implemented.
  • C. In the remaining architecture definition phases, the project team should map out the capability across the Business, Information System and Technology domains. In the Phases E and F, the capability should be broken down into a set of increments that are sequenced into Transition Architectures that will lead to the realization of the Target Architecture. The resulting Solution Building Blocks will then provide the basis for the capability increment solutions. The complete Architecture Definition Document and the Implementation and Migration Plan will be submitted for approval. Upon approval, the architecture team will oversee the implementation process through monitoring Architecture Contracts and by conduction Compliance Assessments.
  • D. In the remaining architecture definition phases, the project team should map out the capability across the Business, Information System and Technology domains. In the Phases E and F, the capability should be broken down into a set of increments that defines the Target Architecture. The Solution Building Blocks will provide the basis for the capability increment solutions. The complete Architecture Definition Document and the Implementation and Migration Plan will be submitted for approval. Upon approval, the architecture team will oversee the implementation process through monitoring Architecture Contracts and by conducting Compliance Assessments.

正解: C

 

質問 19
You have been assigned the role of Chief Enterprise Architect within a leading professional services company that specializes in providing outsourcing services.
The company has over 20,000 professionals and works on some of the world's largest outsourcing projects.
Outsourcing services include business processes, infrastructure, and service management. The company also provides business consulting services. Roughly half of its turnover comes from the private sector and hal from the public sector.
With numerous service areas and a large number of diverse engagements in progress at any given time, overall engagement management within the company has become challenging. The company has recently had a number of high profile projects that have overrun on budget and under delivered, thereby damaging its reputation and adversely impacting its share price.
The company has established an Enterprise Architecture program based on the TOGAF standard, sponsored jointly by the Chief Executive Officer and Chief Information Officer. An Architecture Board has been formed comprised of IT staff executives and executives from the major service areas and consulting practice.
The Enterprise Architecture (EA) team has been working with the Strategic Planning team to create a strategic Enterprise Architecture to address these issues.
The EA team has defined a framework and held workshops with key stakeholders to define a set of architecture principles to govern the architecture work. They have completed an Architecture Version at a strategic level and laid our Architecture Definitions for the four domains. They have set out an ambitious vision of the future of the company over a five-year period. This will include three distinct transformations.
The CIO has made it clear that prior to the approval of the detailed implementation and Migration plan, the EA team will need to assess the risks associated with the proposed architecture. He has received concerns from some of the vice presidents across the company that the proposed architecture may be too ambitious and they are not sure it can produce sufficient value to warrant the risks.
You have been asked to recommend an approach to satisfy these concerns.
Based on the TOGAF Standard, Version 9.2, which of the following is the best answer?

  • A. Before preparing the detailed Implementation and Migration plan, the EA team should review and consolidate the gap analysis results from Phases B to D. This can be used to understand the transformations that are required to achieve the proposed Target Architecture. The EA team should then assess the readiness of the organization to undergo change. Once the architecture has been assembled, it should be analyzed using a state evolution table to determine the Transition Architectures.
  • B. The EA team should evaluate the organization's readiness to undergo change. This will allow the risks associated with the transformations to be identified and mitigated for. It will also identify improvement actions to be worked into the Implementaion and Migration Plan. The Business Value Assessment technique should then be used to detetmine the business value and associated risks for the transformation.
  • C. The EA team should apply an interoperability analysis to evaluate any potentital issues across the architecture. This should include the development of a matrix showing the interoperability requirements.
    Once all of the concerns have been resolved, the EA team should finalize the Architecture Roadmap and the Implementation and Migration Plan.
  • D. The EA team should bring together information about potential solutions from the appropriate sources.
    Once the target architecture has been assembled, it should be analyzed using a state evolution table to determine the Transition Architectures. A value realization process should then be established to ensure that the concerns raised are addressed.

正解: B

 

質問 20
Scenario
Please read this scenario prior to answering the question
Your role is that of the Lead Architect working for a government agency responsible for immigration, customs, and border control. The agency was formed by consolidating several smaller government agencies. The agency has established an Enterprise Architecture practice based on TOGAF 9. The CIO is the executive sponsor and has appointed an EA steering team to oversee the practice.
There has been a considerable increase in security requirements and immigration service requests in recent years, which have expanded the scope and size of the operations of the agency. As a result, the existing Information Technology architecture no longer meets the required service levels. A significant Enterprise Architecture (EA) initiative is in progress with the goal to improve customer responsiveness and satisfaction, and improve the overall operational efficiency of the agency.
The current EA staff members were internal appointments based on a request from the EA steering team to supply a number of suitable individuals for the EA effort. Collectively, they possess a broad range of IT and business analysis skills. However, the CIO has expressed concern about the diverse range of experience within the team. There is concern that the EA staff may be lacking in some of the critical skills that are required to properly conduct EA activities. It had been assumed that any EA-related skill gaps would be overcome by on-the-job mentoring from the senior members of the EA staff. Each architect was expected to attend a TOGAF training course and participate in other skill development activities.
A recent review of the EA program revealed that many EA staff members, despite attending multi-day training courses, were not proficient in analyzing or creating the models and artifacts required for their assigned architecture projects. Stakeholders have observed errors and inconsistencies in artifacts and deliverables being submitted for review.
Refer to the Scenario
The CIO has asked you to recommend a professional development plan for the EA staff in order to address the findings raised in the recent review.
Based on TOGAF, which of the following is the best answer?

  • A. You recommend that you work with the EA steering team to adapt the TOGAF Architecture Skills Framework for use within the architecture practice at the agency. The categories of architecture roles, the required skills for each role and the desired level of proficiency for each role and skill will be defined by this framework. Each team member, or prospective team member, can then be evaluated for suitability against these roles and skills. Staffing and training adjustments can then be made as necessary to close gaps that are discovered.
  • B. You recommend that an architecture maturity assessment should be conducted. This will identify the practices on which the agency should focus to see the greatest improvement and ensure that the basic enterprise architecture process is documented. As part of the assessment, all of the team leaders should be interviewed and their qualifications assessed. In order to rectify areas of low proficiency, they are expected to attend additional EA training courses. When the team leaders have achieved the desired levels of proficiency, they should apply a similar process for their staff members.
  • C. You recommend that to address the issues identified in the review, the experienced team leaders should mentor the junior team members. At the same time additional training should be provided. Since it is now known that some models are improperly defined and may have caused cascading errors in other parts of the architecture, you recommend an iteration of the Migration Planning phase occur, so as to develop a coordinated transition to a new baseline using the last known good architecture. Once the artifacts are consistent and correct, these can be applied to this new baseline.
  • D. You recommend that a comprehensive evaluation of key team leader skills be made using the TOGAF Architecture Skills Framework. Based on the evaluations, you will recommend the necessary staff changes.
    This will ensure that the team leaders have the necessary skills and experience for the architecture tasks within the agency. The role and skill categories defined in the TOGAF Architecture Skills Framework should then be shared with the department leaders so that in the future, they can make more informed choices when providing internal candidates for the EA team.

正解: A

 

質問 21
Scenario: Zephyr Enterprises
Please read this scenario prior to answering the question
Zephyr Enterprises specializes in the development of wind turbine blades for use in large-scale commercial wind energy production systems. Zephyr has manufacturing facilities located in Palm Springs, California, Omaha, Nebraska, and Winnipeg, Ontario. Each of these plants supplies a different manufacturer that builds and sells complete systems. The turbine blades are custom engineered to meet each manufacturers design specifications.
Until recently, most turbine blades were fabricated manually using molded fiber-reinforced plastics.
However, recent improvements in composite materials, coupled with enhanced automated methods for precision application of materials during the molding process, have led to significant reduction in weight, increase in strength, and greatly improved blade longevity. Zephyr has pioneered the development of a proprietary automated process for continuous extrusion of the turbine blades. Patents have been filed to protect the process, but certain trade secrets must be closely guarded.
Zephyr has a mature Enterprise Architecture organization that is supported by a cross-functional Architecture Review Board. The Chief Information Officer and the Chief Operating Officer co-sponsor the Enterprise Architecture program.
Zephyr has used TOGAF and its Architecture Development Method (ADM) to develop its automated manufacturing processes and systems that are used to design, manufacture, and test the blade assemblies. They have recently updated to TOGAF 9 and have adapted the Zephyr Enterprise Architecture to closely follow the TOGAF 9 framework. All of Zephyrs IT architects have been trained and certified on TOGAF 9.Recently, an architecture project was completed that defined a standard approach for controlling the Automated Test System that is used at each plant to perform final quality assurance tests on each completed blade assembly. The Manufacturing Architecture Board approved the plan for immediate implementation at each plant.
An Architecture Contract was developed that detailed the work needed to implement and deploy the new Automated Test System controller. The Chief Engineer, sponsor of the activity, has expressed concern that a uniform process be employed at each site to ensure consistency.
Refer to the Zephyr Enterprises Scenario
You are the Lead Architect for this activity.
You have been asked to recommend the best approach to adopt to address the Chief Engineer's concern.
Based on TOGAF 9, which of the following is the best answer?

  • A. You create an Architecture Contract to govern the implementation and migration process at each site. If the contract is issued to an external party, you ensure that it is a fully enforceable legal contract. You ensure that the contract addresses the project objectives, effectiveness metrics, acceptance criteria, and risk management.
    You then schedule compliance reviews at key points in the implementation process to ensure that the work is proceeding in accordance with the Architecture Definition. Based on the results, you ensure that the Manufacturing Architecture Board reviews all deviations from the Architecture Contract, and considers whether or not to grant a dispensation to allow the implementation organization to customize the process to meet their local needs.
  • B. You create an Architecture Contract to manage and govern the implementation and migration process.
    If the contract is issued to an external party, you ensure that it is a fully enforceable legal contract. For internal development projects, you decide it is adequate to utilize a memorandum of understanding between the Manufacturing Architecture Board and the implementation organization.
    You recommend that if a deviation from the contract is detected, the Manufacturing Architecture Board should modify the Architecture Contract to allow the implementation organization the ability to customize the process to meet their local needs. As a result, you then issue a new Request for Architecture Work to implement the modified Architecture Definition.
  • C. You create an Architecture Contract to manage and govern the implementation and migration process.
    If the contract is issued to an external party, you ensure that it is a fully enforceable legal contract. For internal envelopment projects, you decide it is adequate to utilize a memorandum of understanding between the Manufacturing Architecture Board and the implementation organization.
    You recommend that if a deviation from the Architecture Contract is detected, the Manufacturing Architecture Board grant a dispensation to allow the implementation organization the ability to customize the process to meet their local needs.
  • D. You create an Architecture Contract to manage and govern the implementation and migration process.
    If the contract is issued to an external party, you ensure that it is a fully enforceable legal contract. For internal development projects, you decide it is adequate to utilize a memorandum of understanding between the Manufacturing Architecture Board and the implementation organization.
    You ensure that the Manufacturing Architecture Board reviews all deviations from the Architecture Contract, and considers whether or not to grant a dispensation to allow the implementation organization to customize the process to meet their local needs.

正解: D

 

質問 22
Scenario:
Please read this scenario prior to answering the Question
You have been appointed as a consultant to the Lead Enterprise Architect of an international agricultural company that exports bulbs, flowers and seeds worldwide. The company has its headquarters in the Netherlands, and has sales and distribution centers in over 30 countries worldwide. Several of these centers include administrative, manufacturing, and research facilities.
To achieve full integration of their research capabilities with their development centers located in various climate zones, the company wants to develop strong self-directed teams in each location. It also wants to define new business models that are profitable while reducing their impact on the environment. The management team is deeply committed to ensuring that the company is a world leader in socially responsible seed development with a business strategy that focuses on profitability through environmentally friendly operating processes.
The international operations of the company are subject to legal and regulatory requirements for each country where they operate. The production of genetically modified seeds has governmental controls that are strictly enforced and compliance is critical. Recently a competitor was heavily fined for violating the regulations in a country where it was developing pest-resistant seeds.
The Governing Board is concerned about the risks posed in this complex global environment, and as a result has approved the expenditure of resources to establish an Enterprise Architecture program. They have requested to be informed about the status of projects that could impact regulatory compliance. They also want to enable the corporate legal staff and auditors to analyze proposed architectures to ensure that they are within the legal guidelines for a given location. In addition, the research organization should be able to see that the architecture is appropriate for its needs.
TOGAF 9 has been mandated as the framework for the development and evolution of the Enterprise Architecture practice. The Preliminary Phase has been completed to establish the enterprise architecture capability for this project.
Refer to the Scenario
You have been asked to recommend an approach that would enable the development of an architecture that addresses the needs of the Governing Board, legal staff, auditors and the research organization.
Based on TOGAF 9, which of the following is the best answer?

  • A. You recommend that each project architecture activity is developed using a consistent modeling approach that is uniform across all architecture projects. Each architecture should be defined based on this fixed set of models so that all concerned parties can examine the models to ensure that their issues and concerns have been addressed.
  • B. You recommend that a set of models be created for each project architecture that can be used to ensure that the system will be compliant with the local regulations. Stakeholders should then view the models to verify that their concerns have been properly addressed.
  • C. You recommend that a stakeholder map be developed. This will allow the architects to define groups of stakeholders that share common concerns. A set of views should be defined to address the concerns for each group of stakeholders. Architecture models should then be created for each view to address the stakeholders' concerns.
  • D. You recommend that a special report be created for those groups that have sufficient power and level of interest. This report should summarize the key features of the architecture with respect to the particular location. Each of these reports should reflect the stakeholders1 requirements.

正解: B

 

質問 23
Scenario:
Please read this scenario prior to answering the Question
You are serving as the Lead Architect for the enterprise architecture team at the prime contractor for the
Dreadnought Unmanned Aircraft System program.
Over the course of this contract, the company has grown rapidly by acquisition and has inherited numerous
different procurement processes and related IT systems. The decision has been made to consolidate and
reduce redundant procurement processes and systems. The CEO has announced that the company will seek
to leverage higher volume discounts and lower related IT support costs by instituting a preferred supplier
program.
TOGAF 9 Is used for internal Enterprise Architecture activities, with an iterative approach for executing
Architecture Development Method (ADM) projects.
At present, there are no particularly useful architectural assets related to this initiative, so all assets need to be
acquired and customized or created from scratch. The company prefers to implement commercial off the shelf
package applications with little customization. The CIO, who is the project sponsor, has stated that she is not
concerned about preserving existing processes or systems.
The architect-re development project has put in place Its Architecture Capability for this project and has started
a number of iteration cycles to develop the Architecture. Some tasks to address concerns related to the
Business Architecture have been completed. The next immediate task is to address the Information Systems
Architectures.
The Information Systems Architectures must address stakeholder concerns such as:
1. Which procurement-related business processes are supported by zero, one, or many existing applications?
2. What non-procurement applications will need to be integrated with any new procurement applications?
3. What data will need to be shared?
Refer to the Scenario
[Note: You may need to refer to TOGAF 9 Chapter 35 in order to answer this question.]
You have been asked to identify the most appropriate catalogs, matrices, and diagrams for this situation.
Based on TOGAF 9, which of the following is the best answer?

  • A. In the early iterations of Architecture development, you would describe the Target Application Architecture
    with Application Communication diagrams and an Application Interaction matrix, and describe the Target
    Data Architecture with a System/Data matrix. In the later iterations of Architecture development, you would
    describe the Baseline Application Architecture with an Application and User Location diagram and a
    System/Function matrix, and describe the Baseline Data Architecture with a Data Entity/Data Component
    catalog.
  • B. In the early iterations of Architecture development, you would describe the Baseline Application Architecture
    with a Technology Portfolio catalog, and describe the Baseline Data Architecture with a Data diagram. In
    the later iterations of Architecture development, you would describe the Target Application Architecture with
    a System/Technology matrix, and describe the Target Data Architecture with a Data Dissemination
    diagram.
  • C. in the early iterations of Architecture development, you would describe the Baseline Application Architecture
    with a System/Function matrix, and describe the Baseline Data Architecture using a Data Entity/Data
    Component catalog. In the later Iterations of the Architecture Definition, you would describe the Target
    Application Architecture using Application Communication diagrams and an Application Interaction matrix,
    and describe the Target Data Architecture with a System/Data matrix.
  • D. In the early iterations of Architecture development, you would describe the Target Application Architecture
    with Application Communication diagrams and an Application Interaction matrix, and describe the Target
    Data Architecture with a Data Entity/Business Function matrix and a System/Data matrix. In the later
    iterations of Architecture development, you would describe the Baseline Application Architecture with a
    System/Function matrix, and describe the Baseline Data Architecture with a Data Entity/Data Component
    catalog.

正解: D

 

質問 24
Worldwide Mobile is a mobile telecommunications company formed through a series of mergers and acquisitions. They are yet to fully integrate the customer service systems for the most recent acquisitions, and as result, customer service has been a major concern for the Chief Technology Officer.
Results for the last two quarters have shown that Average Revenue Per User (ARPU) and the customer retention (Churn) rate have fallen below the industry average. The Corporate Marketing group has published some new finding about customer satisfaction. The customers appear to be switching to Air Light, a competitor, because of superior customer service. WorldwideMobile actually has better coverage in nearly all markets than Air Light, and good roaming agreement that keep rates low for business travellers. But customer satisfaction has remained low.
The Business Strategy group and the Enterprise Architecture group have conducted a high-level project to develop the enterprise-wide strategic plan. They have developed a business scenario which contains a good conceptual model of what needs to be done and also identifies the key requirements. This was used in preparing the proposal presented to the Executive Council and the Corporate Board.
The planning for the program has been underway for several months. WorldwideMobile has selected TOGAF 9 as the basis for its Enterprise Architecture.
The Corporate Board has approved funding for a multi-million Euro conversion to transition to a packaged Customer Service System. It is anticipated that the overall program will take five years to complete, but there are some tactical projects that can commence immediately to address the situation. The Executive Council has stated that the program should define specific initiatives to enable each regional business units to create an implementation of the Customer Service System. The implementation must meet the needs of the business unit and still provide the information needed to enable major improvements to the customer.
Refer to WorldwideMobile-2 Scenario
You are serving as the Lead Architect for the Performance and Integrity project of the Customer Service System program.
The project has been chartered to address the architecture(s) required to support the Customer Service System from an infrastructure perspective. At present time, the project team is conducting an architecture development project that is focused on the customer self service capability, which was defined as part of the earlier strategic planning activities. This capability will enable customers to access their accounts, pay bills, request account reviews, and provision services from any web-enabled device.
The project team has gathered information about the self-service capability, developed a business scenario, and used the results to define an Architecture Vision for achieving the capability.
You have been asked to recommend the course of action to complete the project.
Based on TOGAF 9, which of the following is best answer?

  • A. In the remaining architecture definition phases, the project team should map out the capability in the Technology domain. In the Phases E and F, the capability should be broken down into a set of Solution Building Blocks that define the Target Architecture. Where possible, the Solution Building Blocks should be drawn from the Architecture Repository. The completed Architecture Definition Document and the Implementation and Migration Plan will be submitted for approval. Upon approval, the architecture team will conduct Compliance Assessments to ensure that the Target Architecture is properly implemented.
  • B. The remaining architecture definition work should be focused on mapping out the technology and infrastructure capability in the Technology domain. In Phases E and F, the capability should be broken down into a set of Solution Building Blocks that will be implemented to realize the Target Architecture. The Solution Building Blocks will provide the basis for the completed Architecture Definition Document that will be submitted for approval. Upon approval, the implementation team will conduct Compliance Assessments to ensure that the self-service capability is compliant with the overall Enterprise Architecture.
  • C. In the remaining architecture definition phases, the project team should map out the capability across the Business, Information System and Technology domains. In the Phases E and F, the capability should be broken down into a set of increments that are sequenced into Transition Architectures that will lead to the realization of the Target Architecture. The resulting Solution Building Blocks will then provide the basis for the capability increment solutions. The complete Architecture Definition Document and the Implementation and Migration Plan will be submitted for approval. Upon approval, the architecture team will oversee the implementation process through monitoring Architecture Contracts and by conduction Compliance Assessments.
  • D. In the remaining architecture definition phases, the project team should map out the capability across the Business, Information System and Technology domains. In the Phases E and F, the capability should be broken down into a set of increments that defines the Target Architecture. The Solution Building Blocks will provide the basis for the capability increment solutions. The complete Architecture Definition Document and the Implementation and Migration Plan will be submitted for approval. Upon approval, the architecture team will oversee the implementation process through monitoring Architecture Contracts and by conducting Compliance Assessments.

正解: C

 

質問 25
Scenario: MegaMart
Case Study Title (Case Study):
MegaMart is a Retail Chain which has expanded throughout India and the Far East.
The CEO and CIO decide that there is a crying need to put an Enterprise Architecture in place to realize MegaMart's strategy to expand its revenue and diversify. The CIO has evaluated and decided to go in for TOGAF9 and adapt it to his enterprise requirements.
The Preliminary and Vision Phase have been completed.
As such very few architectural artifacts exist and the target architecture as of now is not very clear. As the Lead Architect how would you guide your team of architects for the Business Architecture definition?

  • A. In the next iteration finalize the Target Business Architecture, determine the gaps and the roadmap, and the impact and update the Architecture Definition document. after analyzing the impacts and reviewing with the stakeholders. Then proceed with the iteration.
  • B. In the first iteration start with the definition of the Baseline Business Architecture using a Bottom Up approach. Define the Architecture Definition document after analyzing the impacts and reviewing with the stakeholders'.
    Proceed to Phase C and Phase
  • C. In the first iteration start with the definition of the Baseline Business Architecture using a Top Down approach. Define the Architecture Definition document after analyzing the impacts and reviewing with the stakeholders. Then proceed to Phase C and Phase
  • D. In the next iteration finalize the Baseline Business Architecture, determine the gaps and the roadmap, and the impact and update the Architecture Definition document.
    After analyzing the impacts and reviewing with the stakeholders. Then proceed with the iteration.
  • E. In the first iteration start with the definition of the Target Business Architecture using a Top Down approach.
    Define the Architecture Definition document after analyzing the impacts and reviewing with the stakeholders proceed to Phase C and Phase
  • F. In the first iteration start with the definition of the Target Business Architecture using a Top down Approach.
    Then keep on iterating in Phase B till the Target Business Architecture is refined before going to Phase C and Phase
  • G. After Phase C and Phase D are over, iterate again to Phase B and define the baseline Business Architecture, analyze the gaps finalize the Architecture Definitions documents and proceed to Phase C and Phase D.
  • H. In the next iteration finalize the Target Business Architecture and proceed to Phase C and Phase D.

正解: B

解説:
Explanation/Reference:

 

質問 26
Scenario: Armstrong Defense Industries
Please read this scenario prior to answering the question
Armstrong Defense Industries is the prime contractor for the Dreadnought Unmanned Aircraft System program.
Over the course of this contract, the company has grown rapidly by acquisition and has inherited numerous different procurement processes and related IT systems. Armstrong Defense is moving aggressively to consolidate and reduce redundant procurement processes and systems. The CEO has announced that the company will seek to leverage higher volume discounts and lower related IT support costs by instituting a preferred supplier program.
To achieve this goal, Armstrong Defense needs to define Baseline and Target Architectures. These architectures must address key stakeholders concerns such as:
1. What groups of people should be involved in procurement-related business processes?
2. What current applications do those groups use?
3. Which procurement-related business processes are supported by zero, one, or many existing applications?
4. What are the overall lifetimes of the Request for Proposal and Purchase Order business objects?
5. What non-procurement applications will need to be integrated with any new procurement applications?
6. What data will need to be shared?
At present, there are no particularly useful architectural assets related to this initiative. All assets need to be acquired and customized or created from scratch. The company prefers to implement existing package applications from systems vendors with little customization.
The architecture development project has just completed its Architecture Context iteration cycle and is about to begin the Architecture Definition iteration cycle.
Armstrong Defense is using TOGAF for its internal Enterprise Architecture activities. It uses an iterative approach for executing Architecture Development Method (ADM) projects.
Refer to the Armstrong Defense Industries Scenario
You are serving as the Lead Architect.
You have been asked to identify the most appropriate architecture viewpoints for this situation.
Based on TOGAF 9, which of the following is the best answer?

  • A. In the early iterations of the Architecture Definition: * Describe the Target Business Architecture with a Business Service/Function catalog and a Business Interaction matrix* Describe the key business objects with Product Lifecycle diagrams* Describe the Target Application Architecture with Application Communication diagrams and an Application Interaction matrix* Describe the Target Data Architecture with a Data Entity/Business Function matrix and a System/Data matrixIn the later iterations of the Architecture Definition: * Describe the Baseline Business Architecture with a Business Service/Function catalog and a Business Interaction matrix* Describe the Baseline Application Architecture with a System/Organization matrix and a System/Function matrix* Describe the Baseline Data Architecture with a Data Entity/Data Component catalog
  • B. In the early iterations of the Architecture Definition: * Describe the Baseline Business Architecture with a Baseline Business Process catalog* Describe the Baseline Application Architecture with a Technology Portfolio catalog* Describe the Baseline Data Architecture with a Data diagramIn the later iterations of the Architecture Definition: * Describe the Target Business Architecture with an Actor/Process/Data catalog* Describe the Target Application Architecture with a System/Technology matrix* Describe the Target Data Architecture with a Data Dissemination diagram
  • C. In the early iterations of the Architecture Definition: * Describe the Target Business Architecture with a Business Service/Function catalog and an Organization/Actor catalog* Describe the key business objects with Data Lifecycle diagrams* Describe the Target Application Architecture with Application Communication diagrams and an Application Interaction matrix* Describe the Target Data Architecture with a System/Data matrixIn the later iterations of the Architecture Definition: * Describe the Baseline Business Architecture with a Business Service/Function catalog and a Business Interaction matrix* Describe the Baseline Application Architecture with an Application and User Location diagram and a System/Function matrix* Describe the Baseline Data Architecture with a Data Entity/Data Component catalog
  • D. In the early iterations of the Architecture Definition: * Describe the Baseline Business Architecture with an Organization/Actor catalog* Describe the Baseline Application Architecture with a System/Function matrix* Describe the Baseline Data Architecture using a Data Entity/Data Component catalogIn the later iterations of the Architecture Definition: * Describe the Target Business Architecture with en Organization/Actor catalog* Describe the Target Application Architecture using Application Communication diagrams end an Application Interaction matrix* Describe the Target Data Architecture with a System/Data matrix

正解: A

 

質問 27
McKinley Rockets is an enterprise that employs 20,000 men and women in five countries: UK, Italy, France, Spain and the Netherlands and its mission is to guarantee access to space offering space transportation, launch and management of satellite systems at low cost.
A TOGAF 9 mature Enterprise Architecture program is already established within the enterprise. McKinley Rockets strategy is to leverage in the USA shortage of satellite launches availability - that NASA created because of the Shuttle program shutdown - by acquiring an important merican space agency. This will ultimately allow McKinley Rockets to offer its services to the US market. The new acquired company NovaSpace is very successful but with outdated satellite monitoring systems. The CIO is sponsoring an activity to extend the McKinley Rockets' satellite monitoring applications to include the NovaSpace's satellites flock.
A task force of enterprise architects prepared an Architecture Vision and secured the approval. The Architecture Board decided to approve the vision, provided that the Design Definition Document is presented for review at phase D conclusion.
Refer to the scenario above
The Chief Architect asked you as Lead Integration Architect to use TOGAF 9 to recommend the best approach to design the Full Architecture and present it to the Architecture Board.
Identify the best answer accordingly to the TOGAF 9 guidelines.
Choose one of the following answers

  • A. You start with the Business Architecture and then address Data, Application and Technology domains. For every domain you select the relevant reference models, viewpoints, and tools. You develop a Baseline and Target Architecture. Then perform Gap Analysis, assess the roadmap impacts and finally update the Architecture Definition Document.
  • B. You start with the Business Architecture and then address Data, Application and Technology domains. For every domain you develop a Baseline and Target Architecture. Then perform Gap Analysis and update the Architecture Definition Document.
  • C. You start with the Business Architecture and then address Technology, Application and Data domains. For every domain you select the relevant reference models, viewpoints, and tools. You develop a Target and Baseline Architecture Descriptions. Then perform Gap Analysis, resolve impacts across the Architecture Landscape and update the roadmap. Finally update the Architecture Definition Document.
  • D. You start with the Business Architecture and then address Data, Application and Technology domains. You then Confirm management framework interactions for the Implementation and Migration Plan, Prioritize the migration projects through the conduct of a cost/benefit assessment and risk validation. Then perform Gap Analysis and update the Architecture Definition Document.

正解: A

 

質問 28
Please read this scenario prior to answering the question
Worldwide Mobile is a mobile telecommunications company formed through a series of mergers and acquisitions. They are yet to fully integrate the customer service systems for the most recent acquisitions, and as result, customer service has been a major concern for the Chief Technology Officer.
Results for the last two quarters have shown that Average Revenue Per User (ARPU) and the customer retention (Churn) rate have fallen below the industry average. The Corporate Marketing group has published some new finding about customer satisfaction. The customers appear to be switching to Air Light, a competitor, because of superior customer service. WorldwideMobile actually has better coverage in nearly all markets than Air Light, and good roaming agreement that keep rates low for business travellers. But customer satisfaction has remained low.
The Business Strategy group and the Enterprise Architecture group have conducted a high-level project to develop the enterprise-wide strategic plan. They have developed a business scenario which contains a good conceptual model of what needs to be done and also identifies the key requirements. This was used in preparing the proposal presented to the Executive Council and the Corporate Board.
The planning for the program has been underway for several months. WorldwideMobile has selected TOGAF 9 as the basis for its Enterprise Architecture.
The Corporate Board has approved funding for a multi-million Euro conversion to transition to a packaged Customer Service System. It is anticipated that the overall program will take five years to complete, but there are some tactical projects that can commence immediately to address the situation. The Executive Council has stated that the program should define specific initiatives to enable each regional business units to create an implementation of the Customer Service System. The implementation must meet the needs of the business unit and still provide the information needed to enable major improvements to the customer.
Refer to WorldwideMobile-2 Scenario
You are serving as the Lead Architect for the Performance and Integrity project of the Customer Service System program.
The project has been chartered to address the architecture(s) required to support the Customer Service System from an infrastructure perspective. At present time, the project team is conducting an architecture development project that is focused on the customer self service capability, which was defined as part of the earlier strategic planning activities. This capability will enable customers to access their accounts, pay bills, request account reviews, and provision services from any web-enabled device.
The project team has gathered information about the self-service capability, developed a business scenario, and used the results to define an Architecture Vision for achieving the capability.
You have been asked to recommend the course of action to complete the project.
Based on TOGAF 9, which of the following is best answer?

  • A. In the remaining architecture definition phases, the project team should map out the capability in the Technology domain. In the Phases E and F, the capability should be broken down into a set of Solution Building Blocks that define the Target Architecture. Where possible, the Solution Building Blocks should be drawn from the Architecture Repository. The completed Architecture Definition Document and the Implementation and Migration Plan will be submitted for approval. Upon approval, the architecture team will conduct Compliance Assessments to ensure that the Target Architecture is properly implemented.
  • B. The remaining architecture definition work should be focused on mapping out the technology and infrastructure capability in the Technology domain. In Phases E and F, the capability should be broken down into a set of Solution Building Blocks that will be implemented to realize the Target Architecture. The Solution Building Blocks will provide the basis for the completed Architecture Definition Document that will be submitted for approval. Upon approval, the implementation team will conduct Compliance Assessments to ensure that the self-service capability is compliant with the overall Enterprise Architecture.
  • C. In the remaining architecture definition phases, the project team should map out the capability across the Business, Information System and Technology domains. In the Phases E and F, the capability should be broken down into a set of increments that are sequenced into Transition Architectures that will lead to the realization of the Target Architecture. The resulting Solution Building Blocks will then provide the basis for the capability increment solutions. The complete Architecture Definition Document and the Implementation and Migration Plan will be submitted for approval. Upon approval, the architecture team will oversee the implementation process through monitoring Architecture Contracts and by conduction Compliance Assessments.
  • D. In the remaining architecture definition phases, the project team should map out the capability across the Business, Information System and Technology domains. In the Phases E and F, the capability should be broken down into a set of increments that defines the Target Architecture. The Solution Building Blocks will provide the basis for the capability increment solutions. The complete Architecture Definition Document and the Implementation and Migration Plan will be submitted for approval. Upon approval, the architecture team will oversee the implementation process through monitoring Architecture Contracts and by conducting Compliance Assessments.

正解: C

 

質問 29
Scenario: Eight Twelve
Eight Twelve has retail outlets throughout North America. An Enterprise Architecture practice already exists in Eight Twelve. Now the CEO and CIO decide that they want to use TOGAF9 to re-architect their Enterprise Architecture to cater to the changing strategies of Eight Twelve to better respond to the changes in the economic and technology environments.
Some of the key issues which need to be addressed in this re-architecting work are:
1. Since Eight Twelve's retail chain operate 24 hours a day and are expanding to South America and Europe, the retail chain business ecosystem should be able to withstand any unforeseen disruptions which might affect the chain's day to day operations. This is highly critical to ensure high levels of customer satisfaction and thus maintaining and enhancing Eight Twelve's revenue chain.
2. Dependency between the application components, which are the nerve centers to Eight Twelve's sophisticated range of services both external and internal, and the application platform and technology infrastructure should be minimal. This would facilitate scalability and ease of enhancement of the service offerings.
3. Eight Twelve uses the ARTS Data Model and the quality of data is of utmost importance for its operation.
4. Users of the Enterprise Information ecosystem should have an environment which is able to cater to their needs without any undue delays.
Which one of the following set of Architecture Principles do you feel is the most appropriate for these guidelines stated above for the TOGAF 9 architecting work which Eight Twelve is embarking on?

  • A. a) Maximize Benefit to the Enterprise
    b).Data is an Asset
    c) Data is Shared
    d) Requirements Based Change
  • B. a) Business Continuity
    b).Data is an Asset
    c) Data is Shared
    d) Requirements Based Change
  • C. a) Business Continuity
    b).Data Trustee
    c) Technology Independence
    d) Responsive Change Management
  • D. a) Maximize Benefit to the Enterprise
    b).Data Trustee
    c) Service Orientation
    d) Responsive Change Management

正解: C

 

質問 30
Scenario:
Please read this scenario prior to answering the question
Your role is consultant to the Lead Architect within a company that manufactures a variety of small electromechanical devices. As part of a corporate-wide Lean Manufacturing initiative, the company has defined a strategic architecture to improve its ability to meet consumer demand and improve its ability to manage its supply chain. The strategic architecture called for the consolidation of multiple Enterprise Resource Planning (ERP) applications that have been operating independently in several of the divisions' production facilities. The goal is to replace the functionality of the existing applications with a new ERP product running as a single instance in the company's primary data center.
The company has a mature enterprise architecture practice and uses TOGAF 9 for the basis of its architecture framework. In addition to the EA program, the company has a number of management frameworks in use, including business planning, portfolio/project management, and operations management. The EA program is sponsored by the CIO.
Each division has completed the Architecture Definition documentation required to tailor and configure the environment to meet its own specific manufacturing requirements.
The enterprise architects have analyzed the key corporate change attributes and implementation constraints. A consolidated gap analysis has been completed which has identified the gaps across the Business, Data, Application, and Technology domains. Based on the results of the gap analysis, the architects have reviewed the requirements, dependencies and interoperability requirements needed to integrate the new ERP environment into the existing environment. The architects have completed the Business Transformation Readiness Assessment started in Phase

  • A. You would conduct a series of Compliance Assessments to ensure that the implementation team is implementing the architecture according to the contract. The Compliance Assessment should verify that the implementation team is using the proper development methodology. It should include deployment of monitoring tools and ensure that performance targets are being met. If they are not met, then changes to performance requirements should be identified and updated in the Implementation and Migration Plan.
  • B. You would assess how the plan impacts the other frameworks in use in the organization. Minimally, the plan should be coordinated with the business planning, portfolio/project management and operations management frameworks. You would then assign a business value to each project, taking into account available resources and priorities for the projects. Finally, you would generate the Implementation and Migration Plan.
  • C. You would apply the Business Value Assessment Technique to prioritize the implementation projects and project increments. The assessment should focus on return on investment and performance evaluation criteria that can be used to monitor the progress of the architecture transformation. You would confirm the Transition Architecture phases using an Architecture Definition Increments Table to list the projects. You would then document the lessons learned and generate the final plan.
  • D. Based on all of these factors they have produced a risk assessment.
    Because of the risks posed by the complexity of the current environment, it has been determined that a phased approach is needed to implement the target architectures. The overall implementation process is estimated to take several years.
    Refer to the Scenario The Implementation and Migration Plan v0.l, the draft Architecture Roadmap, and the Capability Assessment deliverables are now complete. You have been asked to recommend the next steps to prepare the final Implementation and Migration Plan.
    Based on TOGAF 9, which of the following is the best answer?
  • E. You would place the strategic Architecture Definition and Transition Architectures under configuration control as part of the ongoing architecture development cycle. This will ensure that the architecture remains relevant and responsive to the needs of the enterprise. You would then produce an Implementation Governance Model to manage the lessons learned prior to finalizing the plan. You recommend that lessons learned be accepted by the Architecture Board as changes to the architecture without review.

正解: B

 

質問 31
Chiamin Metals is a leading world-wide manufacturer for continuous casting and bottom pouring powders.
In addition to mould powders, the company also produces cored wire for secondary metallurgy. Chiamin Metals offers a variety of products and uses a paper-based catalog to sponsor them. A new CIO has joint the enterprise and has set up a team of Enterprise Architects following the TOGAF 9 practice. The main challenge is now to offer to Chiamin Metals customers a centralized and reliable entry point for their request via the implementation of a global online portal. This will allow the management of new marketing activities and will enable the new Chiamin Metals' ecommerce service.
Refer to the scenario above
You are the Chief Architect and the CIO asked you to present an Architecture Vision to address the above business problem. Identify the best answer accordingly to the TOGAF 9.
Choose one of the following answers

  • A. You create a high-level view of the Target Architectures and then present them to the CIO.
  • B. As requested by the CIO you focus on the Architecture Vision and create a detailed view of the Baseline Architectures. This is done for Business, Data, Application and Technology domains and then presented to the CIO using the Architecture Definition Document.
  • C. As requested by the CIO you focus on the Architecture Vision documentation and apply the Business Scenarios technique to create a high-level view of the Baseline and Target Architectures also based on the stakeholder concerns, business capability requirements, scope, constraints, and principles.
  • D. You identify key stakeholders, their concerns, and define the key business requirements to be addressed in the architecture engagement and generate a Stakeholder Map. You Evaluate business capabilities and execute a Business Transformation Readiness Assessment. You apply the Business Scenarios technique to create a high-level view of the Baseline and Target Architectures also based on the stakeholder concerns, business capability requirements, scope, constraints, and principles.

正解: D

 

質問 32
Please read this scenario prior to answering the question
You are serving as the Lead Architect for a chain of convenience stores, which has over 2000 retail outlets throughout the Asia-Pacific region. The stores operate 24 hours a day and 7 days a week and use the latest cloud-based point-of-sale (POS) technology to manage their sales and inventory. Cloud-based POS systems store all user data, including sales and inventory in a remote server.
The cloud-based systems collect real-time data to support ordering and product selection decisions including the tailoring of product assortment based on sales history, customer demographics as well as the next day's weather forecast. In many cases, several stores are located in neighboring areas. This strategy makes distribution to each store cheaper, as well as making multiple deliveries per day possible. The stores also act as self-service delivery locations for a large online retailer which further increases the number of potential customers entering the stores.
An Enterprise Architecture practice exists within the company, with the CEO and CIO as joint sponsors. They have decided to adopt TOGAF 9 within the practice and the first project is to restructure the Enterprise Architecture so that it can better support the existing environment and accommodate future changes of strategy within the company.
The CIO has stated that the following issues also need to be addressed in the restructuring:
- They need to address problems with data quality and inconsistent data in order to support better decision making and analysis.
- The architecture should focus on the needs of the business, not technology.
- To remain competitive, new products and promotions must undergo market trials before deployment across the retail chain. Information systems must be able to manage changes and updates without undue delays.
Refer to the Scenario
[Note: You should assume that the company has adopted the example set of principles that are listed and defined in TOGAF, Section 23.6. You may need to refer to Chapter 23 of the reference text in order to answer this question.] You have been asked to identify the most relevant architecture principles for the current situation.
Based on TOGAF, which of the following is the best answer? [Note: The ordering of the principles listed in each answer is not significant.]

  • A. IT Responsibility, Data security, Ease of Use, Service Orientation, Common Use Applications.
  • B. Data is Accessible, Data is shared, Interoperability, Requirements Based Change, Control Technical Diversity.
  • C. Maximize Benefit to the Enterprise, Data Trustee, Data is an Asset, Responsive Change Management, Interoperability.
  • D. Requirements Based Change, Responsive Change Management, Data Trustee, Common Vocabulary and Data Definitions, Business Continuity.

正解: D

 

質問 33
Scenario
Please read this scenario prior to answering the question
You have been assigned the role of Chief Enterprise Architect within a leading outsourcing services company.
The company has over 20,000 outsourcing professionals and works on some of the world's largest outsourcing
projects. Outsourcing services include business processes, infrastructure, and service management. The
company also provides business consulting services.
With numerous service areas and a large number of diverse engagements in progress at any given time,
overall engagement management within the company has become challenging. The company does not want to
risk its outstanding reputation or its international certifications and CMM ratings.
The company has an established an Enterprise Architecture program based on TOGAF 9, sponsored jointly by
the Chief Executive Officer and Chief Information Officer. An Architecture Board has been formed comprised
of IT staff executives and executives from the major service areas and consulting practice.
The Enterprise Architecture (EA) team has been working with the Strategic Planning team to create a strategic
enterprise architecture to address these issues. The EA team has defined a framework and held workshops
with key stakeholders to define a set of architecture principles to govern the architecture work. They have
completed an Architecture Vision at a strategic level and laid out Architecture Definitions for the four domains.
They have set out an ambitious vision of the future of the company over a five-year period. This includes a
solution architecture including three distinct transformations.
The CIO has made it clear that prior to the approval of the detailed implementation and Migration plan, the EA
team will need to assess the risks associated with the proposed architecture. He has received concerns from
some of the vice presidents across the company that the proposed architecture may be too ambitious and they
are not sure it can produce sufficient value to warrant the attendant risks.
Refer to the Scenario
You have been asked to recommend an approach to satisfy these concerns.
Based on TOGAF, which of the following is the best answer?

  • A. Before preparing the detailed Implementation and Migration plan, the EA team should review and
    consolidate the gap analysis results from Phases B to D to understand the transformations that are
    required to achieve the proposed Target Architecture. The EA team should then assess the readiness of
    the organization to undergo change. Oice the Solution Architecture has been assembled, it should be
    analyzed using a state evolution table to determine the Transition Architectures.
  • B. The EA team should apply an interoperability analysis to evaluate any potential issues across the Solution
    Architecture. This should include the development of a matrix showing the interoperability requirements.
    Once all of the concerns have been resolved, the EA team should finalize the Architecture Roadmap and
    the Implementation and Migration Plan.
  • C. The EA team should gather information about potential solutions from the appropriate sources. Once the
    Solution Architecture has been assembled; it should be analyzed using a state evolution table to determine
    the Transition Architectures. A value realization process should then be established to ensure that the
    concerns raised are addressed.
  • D. The EA team should apply the Business Transformation Readiness Assessment technique. This will allow
    the risks associated with the transformations to be identified and mitigated for. It will also identify
    improvement actions to be worked into the Implementation and Migration Plan. The Business Value
    Assessment technique should then be used to determine the business value and associated risks for the
    transformation.

正解: D

 

質問 34
Magic Wand Corporation manufactures a range of equipment used by magician worldwide. The global popularity of a series of children's books describing the formative years of a budding wizard and his various escapades at wizard school has driven unprecedented sales growth in the magical equipment market.
The current IT systems at Magic Wand are struggling to cope with the high volumes in this growth market. The CIO wants to persuade the board of Magic Wand Corporation to make a greater investment in the IT systems to cope with the new higher transaction volumes. On of the key components the CIOs wants to include when he approaches the board is a description of the current problems and how they may be addressed from an architectural point of view.
As the High Architect of Magic Wand Corporation, the CIO has delegated the task of creating a vision for the future Architecture to you.
Which of the following answers best describes how TOGAF recommends delivering an Architecture Vision for the CIO?

  • A. I would start by ensuring there is a Request for Architecture Work from the sponsor (the CIO). I would then create a project to define and deliver the architecture vision and the necessary outputs. The outputs include an approved Statement of Architecture Work, refined statements of Businesses Principles, Business Goals and Business Drivers, Architecture Principles, a Capability Assessment, a Tailored Architecture Framework, an Architecture vision, a Communications plan. The Statement of Architecture Work needs to be clear on the scope of architectural work, the resources needed to complete the work and amount of time it would take to complete the work assuming the scope of architectural work is agreed and that all the resources required are available. The final step would be to agree the Statement of Architectural Work with stakeholders confirming the scope, schedule and confirming the availability of the necessary resources.
  • B. I would start by establishing the architecture project and follow the appropriate project management method. I would identify stakeholders their concerns and business requirements then confirm and elaborate the business goals, business drivers and constraints. I would then evaluate the business capabilities and readiness for business transformation and define the scope. I would then develop the architecture vision, define the target architecture value proposition, KPIs and identify and mitigate all risks associated with the transformation effort. Finally, I would develop an Enterprise Architecture Plan and Statement of Work and secure approval from the relevant stakeholders.
  • C. I would approach this by defining and establishing the architecture team and governance. This would be followed by agreeing and establishing the architecture principles. I would select and customize an architecture framework changing any terminology and selecting the right phases and customizing the structure of content and outputs from the chosen method. Finally I would select and implement and architecture tools. The outputs from this work would include an Organization Model for Enterprise Architecture, a Tailored Architecture Framework including method and content, the Architecture Principles, an initial architecture repository, restatement or references to business principles, business goals and business driver, a request for architecture work and the governance framework.
  • D. Firstly, I ensure there is a Request for Architecture Work from the CIO. Then I ensure that there is recognition for the architecture vision project by following any project management and programmed management frameworks used within the organization. I would identify the key stakeholders and engage with them to understand and document their concerns and high-level requirements. This would result in a stakeholder map used to support other deliverables such as the Architecture Vision, a Communications plan and a Statement of Architecture Work. I would then identify the business goals and strategic drivers of the organization and define any enterprise or project specific constraints such as time and resources. I would then define the business capabilities of the organization needed to fulfill those business goals and drivers and their readiness for change. Once complete, I would define the scope, confirm the architecture and business principles and develop the Architecture Vision. Following this, I would define the business case for the architecture project, assess the business risks and produce a risk mitigation plan. I would then define a plan of enterprise architecture work to meet the scope in the desired time line and the resources required and secure the support of stakeholders.

正解: D

 

質問 35
Scenario: Armstrong Defense Industries
Please read this scenario prior to answering the question
Armstrong Defense Industries is the prime contractor for the Dreadnought Unmanned Aircraft System program.
Over the course of this contract, the company has grown rapidly by acquisition and has inherited numerous different procurement processes and related IT systems. Armstrong Defense is moving aggressively to consolidate and reduce redundant procurement processes and systems. The CEO has announced that the company will seek to leverage higher volume discounts and lower related IT support costs by instituting a preferred supplier program.
To achieve this goal, Armstrong Defense needs to define Baseline and Target Architectures. These architectures must address key stakeholders concerns such as:
1. What groups of people should be involved in procurement-related business processes?
2. What current applications do those groups use?
3. Which procurement-related business processes are supported by zero, one, or many existing applications?
4. What are the overall lifetimes of the Request for Proposal and Purchase Order business objects?
5. What non-procurement applications will need to be integrated with any new procurement applications?
6. What data will need to be shared?
At present, there are no particularly useful architectural assets related to this initiative. All assets need to be acquired and customized or created from scratch. The company prefers to implement existing package applications from systems vendors with little customization.
The architecture development project has just completed its Architecture Context iteration cycle and is about to begin the Architecture Definition iteration cycle.
Armstrong Defense is using TOGAF for its internal Enterprise Architecture activities. It uses an iterative approach for executing Architecture Development Method (ADM) projects.
Refer to the Armstrong Defense Industries Scenario
You are serving as the Lead Architect.
You have been asked to identify the most appropriate architecture viewpoints for this situation.
Based on TOGAF 9, which of the following is the best answer?

  • A. In the early iterations of the Architecture Definition:
    * Describe the Target Business Architecture with a Business Service/Function catalog and an Organization/Actor catalog
    * Describe the key business objects with Data Lifecycle diagrams
    * Describe the Target Application Architecture with Application Communication diagrams and an Application Interaction matrix
    * Describe the Target Data Architecture with a System/Data matrix
    In the later iterations of the Architecture Definition:
    * Describe the Baseline Business Architecture with a Business Service/Function catalog and a Business Interaction matrix
    * Describe the Baseline Application Architecture with an Application and User Location diagram and a System/Function matrix
    * Describe the Baseline Data Architecture with a Data Entity/Data Component catalog
  • B. In the early iterations of the Architecture Definition:
    * Describe the Target Business Architecture with a Business Service/Function catalog and a Business Interaction matrix
    * Describe the key business objects with Product Lifecycle diagrams
    * Describe the Target Application Architecture with Application Communication diagrams and an Application Interaction matrix
    * Describe the Target Data Architecture with a Data Entity/Business Function matrix and a System/Data matrix In the later iterations of the Architecture Definition:
    * Describe the Baseline Business Architecture with a Business Service/Function catalog and a Business Interaction matrix
    * Describe the Baseline Application Architecture with a System/Organization matrix and a System/ Function matrix
    * Describe the Baseline Data Architecture with a Data Entity/Data Component catalog
  • C. In the early iterations of the Architecture Definition:
    * Describe the Baseline Business Architecture with a Baseline Business Process catalog
    * Describe the Baseline Application Architecture with a Technology Portfolio catalog
    * Describe the Baseline Data Architecture with a Data diagram
    In the later iterations of the Architecture Definition:
    * Describe the Target Business Architecture with an Actor/Process/Data catalog
    * Describe the Target Application Architecture with a System/Technology matrix
    * Describe the Target Data Architecture with a Data Dissemination diagram
  • D. In the early iterations of the Architecture Definition:
    * Describe the Baseline Business Architecture with an Organization/Actor catalog
    * Describe the Baseline Application Architecture with a System/Function matrix
    * Describe the Baseline Data Architecture using a Data Entity/Data Component catalog In the later iterations of the Architecture Definition:
    * Describe the Target Business Architecture with en Organization/Actor catalog
    * Describe the Target Application Architecture using Application Communication diagrams end an Application Interaction matrix Describe the Target Data Architecture with a System/Data matrix

正解: B

 

質問 36
......

最新100%合格率保証付きの素晴らしいOG0-092試験問題PDF:https://www.jpntest.com/shiken/OG0-092-mondaishu

弊社を連絡する

我々は12時間以内ですべてのお問い合わせを答えます。

オンラインサポート時間:( UTC+9 ) 9:00-24:00
月曜日から土曜日まで

サポート:現在連絡