質問 # 65
A customer previously purchased a Nutanix solution of nine NX-3060 G7 nodes. The customer asks for help to increase the resillency of their environment after power outages to individual racks in their datacenter.
Their current soluction consists of two NX-3460-G7 blocks and a single NX-3160-G7 block placed in a single rack.
What should the systems engineer recommend to this customer?
- A. Move one node from each NX-3460 block over to the NX-3160 blocks. Enable Block Awareness.
- B. Buy three additional NX-3060 upgrade nodes and place them into the NX-3160 block, Enable Rack Awareness.
- C. Buy one additional node and place it into the NX-3160 block, Spread the blocks over three racks. Ebable Rack Awareness.
- D. Move one node from each NX-3460 block into the NX-3160 block. Spread the blocks over three racks and enable Rack Awareness.
正解:D
質問 # 66
A customer's current AHV cluster for mixed server workloads consists of 7 NX-3060-G6 nodes with intel Skylake processors spread across two blocks. Growing demand for resources requires the customer to order three additional NX-3060-G7 nodes with Intel Cascade Lake processors. Which supported approach allows the customer the most efficient use of their additional resources?
- A. Expand the cluster by fully populating the existing blocks, and adding a new block populated with two nodes
- B. Expand the cluster by fully populating the existing blocks with the three additional nodes
- C. Create a new cluster using a new block populated by the three additional nodes.
- D. Expand the existing cluster by adding a new block populated with the three additional nodes
正解:D
質問 # 67
An 8-node hybrid cluster is configured with a Fault Tolerance level of 2 (RF3). All nodes are identical.
Which simultaneous failures will result in VM data being unavailable?
- A. Two HDD failures on one node and a single SSD failure on another node.
- B. SSD failures on two nodes and a CVM powered off on another
- C. CVM being powered off on one node and two HDD failures on another node.
- D. Single SSD failure on one node and a single SSD failure on another node
正解:B
質問 # 68
An existing customer wants to upgrade their non-AHV hypervisor to the most recent version. The customer needs confirm that the hypervisor is supported on their AOS version. Where on the Support Portal is this information located?
- A. Upgrade Paths
- B. Field Advisories
- C. EOL, Information
- D. Compatibility Matrix
正解:D
質問 # 69
An administrator needs to configure Acropolis File Service (AFS). The administrator is setting up AFS for the first time on the Nutanix cluster.
How many file services VMs are created by default?
- A. 0
- B. 1
- C. 2
- D. 3
正解:D
質問 # 70
prospect uses Vmware, Oracle, and Microsoft products for a critical application. The prospect prefers an all flash array because they have significantly invested in servers for their Oracle environment to save on licensing costs.
which feature should be discussed to address this objection?
- A. ABS
- B. Hyper-V support
- C. All flash nodes
- D. AHV
正解:A
質問 # 71
Where are Leap Availability Zones configured?
- A. Cloud Connect
- B. Prism Central
- C. Prism Element
- D. Controller VM
正解:B
解説:
Terminology
Availability Zone - it is represented by all resources (Nutanix Clusters) connected to Prism Central or Xi Leap Availability zone. Depends on the architecture, Availability zone can represent geographic territory, datacenter or server room in the datacenter. Protection policies - in protection policies you set up (RPO, Retention), rules to auto-apply policies to virtual machines
https://vmwaremine.com/2019/02/08/nutanix-leap-runbooks-part-1/#sthash.VwrzSzhQ.dpbs
質問 # 72
A systems engineer provides a demo to a prospective customer who wants to be more hands on with Nutanix Which two resources can the customer leverage without support from a systems engineer or Nutanix? (Choose two)
- A. Foundation
- B. Hosted POC (HPOC)
- C. Community Edition (CE)
- D. Test Drive
正解:C、D
質問 # 73
Which CVM service rs responsible for providing storage to the hypervisor?
- A. Stargate
- B. Curator
- C. Genesis
- D. Zookeeper
正解:A
質問 # 74
Which tool could be used to perform a sizing discovery in a general server virtualization environment running both VMware ESXi and Nutanix AHV?
- A. Collector
- B. RVTools
- C. AWR
- D. MAP
正解:A
質問 # 75
A prospect is evaluating solutions to support a project. The SE proposes a hybrid model as recommended by size in addition to nutanix, the prospect is evaluating an all flash storage array. The storage administrator is concerned about the performance the hybrid configuration and claims that the flash array is less expensive the it Director sees the benefits of Nutanix but needs to address the team's concerns.
Which two Nutanix features should be discussed to address the concems
of the storage administrator? (Choose two)
- A. Data Locality
- B. Automatic Data Tiering
- C. NVMe support
- D. Capacity Planner
- E. 40Gb/s support
正解:A、B
質問 # 76
A customer who uses Nutanix for mission critical workloads is considering migrating public cloud workloads to Nutanix. The customer has experienced difficulty auditing where applications reside and understanding cloud costs on a per application basis.
Which Nutanix product should be discussed to address the customer'sneeds?
- A. Xi
- B. Beam
- C. Calm
- D. Prism Pro
正解:B
質問 # 77
A customer asks for a quote for a hybrid cluster to run general purpose VMs and an ERP application. The customer has a vSAN ReadyNode quote already and is looking for a comparable Nutanix solution. They share the following bill of materials: 3 Hosts , 2x E5-2640v4 CPUs , 512GB RAM , 1 x 480GB SSD , 2 x 8TB HDD
, 2 x 1GB NIC What are two reasons to avoid sizing to match a competitor's bill of materials ? (Choose two)
- A. Nutanix Collector is better at capturing the metrics needed
- B. The assumptions made in the competitor's sizing cannot be determined.
- C. There is no visibility to the actual customer requirement
- D. Sizing data from the competition was shared.
正解:B、C
質問 # 78
A customer has successfully deployed Citrix XenDesktop on Nutanix,
They value the product but view Nutanix as a VDI appliance. The customer mentions a cloud initiative.
Which open-ended discovery question should the SE ask to start a conversation about expanding beyond VDI workloads?
- A. Are you using Time Stream for the VDI workloads?
- B. Does your company use Microsoft Exchange?
- C. What is your process for evaluating new methodologies and technologies?
- D. Have you reviewed additional features Nutanix like Calm or Beam yet?
正解:D
質問 # 79
In the event of a primary datacenter failure. a customer wants to power on virtual machines in a secondary datacenter with an RPO and RTO of no more than 15 minutes. Upon further discussions with the customer. the systems engineer (SE) finds that round trip latency between the 2 sites ca reach up to 6ms Which Nutanix feature should the SE recommend?
- A. NearSync
- B. Fault Tolerance FT1
- C. Rack Awareness
- D. Metro Availability
正解:A
質問 # 80
During a meeting with a prospect a storage administrator comments that they're currently using 16Gb Fibre Channel for their SAN and believes that 10Gb Ethernet can't provide adequate bandwidth or low latency.
As a followup to the meeting, which Nutanix Bible section would be most helpful in overcoming the storage administrator's objection?
- A. Storage Tiering and Prioritization
- B. Drive Breakdown
- C. Cluster Components
- D. Do you have any infrastructure refreshes planned for this year?
- E. Data locality
正解:E
質問 # 81
A customer needs to image nodes that are either bare metal or regime a different hypervisor.
Which Nutanix tool should be used?
- A. Foundation
- B. Era
- C. Prism Centrail
- D. Move
正解:A
質問 # 82
An SE is conducting a first call presentation with their Account Executive and a prospect. The prospect needs to build a private cloud but has been unable to implement the solution in-house, since using their traditional architecture would require integrating server, storage and networking solutions from six different vendors.
The cost and complexity of that approach is too high. Also their current infrastructure is not built for scalability or performance.
The prospect has considered upgrading their traditional server and SAN storage platforms but could not meet requirements for scale and performance using this approach.
In what order should the SE present the critical product and technology portions of the First Customer Presentation to the IT Director?
- A. Data locality and distributed data.
Scalable distributed system.
Native convergence of traditional infrastructure.
Xi Cloud Services.
Application automation with Calm. - B. Application automation with Calm.
Xi Cloud Services.
Native convergence of traditional infrastructure.
Scalable distributed system.
Data locality and distributed data. - C. Xi Cloud Services.
Application automation with Calm.
Native convergence of traditional infrastructure.
Scalable distributed system.
Data locality and distributed data. - D. Native convergence of traditional infrastructure.
Scalable distributed system.
Data locality and distributed data.
Application automation with Calm.
Xi Cloud Services.
正解:A
質問 # 83
A systems engineer (SE) is gathering requirements to size a hybrid cluster to replace a prospect's existing IT test and development environment The prospective customer has indicated the cluster contains no business critical applications and has provided the aggregate vCPU and RAM requirements of the existing cluster.
Which two additional items does the SE require to size the cluster' (Choose two.)
- A. Storage Capacity
- B. Working Data Set
- C. Existing Drive Count
- D. Virtual Switch Configuration
正解:A、B
質問 # 84
A systems engineer needs to size a new project that requires offsite backup using Veeam. The prospect requires an RPO of 24 hours, and the ability to restore from the past 7 days of backups. The prospect's data change rate is 1%. How should the SE configure the SE configure Sizer for this scenario? ????
- A. HYCU
- B. Mine
- C. Veeam
- D. Async
- E. Yes
正解:B、E
質問 # 85
Which two VMs require further data analysis to accurately size resources? (Choose two.)
- A. prodsrv06
- B. prodsrv05
- C. prodsrv02
- D. prodsrv07
正解:B、D
質問 # 86
A prospects need to refresh their environment but has a very small budget for the project. Four years after their last infrastructure refresh, the prospect's datacenter is only running at 40% utilization. In addition, they have 25 satellite offices. Each office has a requirement to run 4 to 6 VM's locally.
Which two Nutanix platform capabilities should the SE highlight to address the prospect's concerns? (Choose two)
- A. Single node backup.
- B. Automated data storage tiering.
- C. Software only.
- D. Pay as you grow.
- E. Multi-Site Management.
正解:D、E
質問 # 87
A systems engineer is building a private cloud for internal developers that should include self-service and life cycle management for both kubernetes containers and SQL databases. which additional license feature must be purchased to provide this capability?
- A. Nutanix Flow
- B. Nutanix Era
- C. Prism Pro
- D. Nutanix Beam
正解:C
質問 # 88
A prospect customer's expected workload consists of the following:
* 110 vCPUs
* 512Gb RAM
* 500TB Storage
They need a solution to help decrease storage costs. The majority of their storage requirements come from an imaging application that stores scanned JPEG images.
Which two Nutanix capabilities should be leveraged? (Choose two.)
- A. Compression
- B. Capacity Tier Deduplication
- C. Storage-Only Nodes
- D. Erasure Coding
正解:A、D
質問 # 89
An SE is performing a sizing exercise for a large financial institution.
They plan to move 8000 VMs to Nutanix AHV manage those clusters using Prism Central.
Which sizing configuration should the SE use for each Prism Central VM?
- A. 2 vCPU / 8gig MEM /200 gig Storage
- B. 4 vCPU / 16gig MEM /500 gig Storage
- C. 10 vCPU / 48gig MEM /3500 gig Storage
- D. 8 vCPU / 32gig MEM /2500 gig Storage
正解:D
質問 # 90
......
NCSE-Core 資格認定試験は、Nutanix アーキテクチャ、インストールと設定、データ保護、災害復旧、パフォーマンス最適化など、広範なトピックをカバーしています。実世界の環境において、Nutanix ソリューションを設計、展開、管理する能力を評価する包括的な試験です。
NCSE-Coreリアル試験問題と正確なNutanix Certified Systems Engineer-Core (NCSE-Core)PDF解答:https://www.jpntest.com/shiken/NCSE-Core-mondaishu
リアルNutanix試験の素晴らしい練習問題集でNCSE-Core試験:https://drive.google.com/open?id=1wtEaL3MNTUjQXCd4lpt9hQx_fZEzWaJS