質問 # 25
You want to create a new standard cost estimate based on the quantity structure of the existing standard cost estimate. Which object do you use?

  • A. Costing version
  • B. Reference variant
  • C. Costing type
  • D. Transfer control

正解:D


質問 # 26
Which of the following statements are applicable to automatic account assignment in SAP S/4HANA? Note:
There are 2 correct answers to this question.

  • A. It can be defined for postings on general ledger accounts of secondary costs type.
  • B. It takes precedence over validation and substitution.
  • C. It can be defined for postings on general ledger accounts of primary costs type.
  • D. It can be overwritten in the application.

正解:B、C


質問 # 27
You want to understand why cost are collected on sales order item level. What do you need to in the configuration? Note: There are 3 correct answers to this question.

  • A. Valuation variant
  • B. Costing type
  • C. Requirement type
  • D. Account assignment category
  • E. Requirements class

正解:C、D、E


質問 # 28
Which parameters are controlled by the costing type in a costing variant? Note: There are 2 correct answers to this question.

  • A. Price for materials
  • B. Costing sheet
  • C. Save with date key
  • D. Price updates

正解:C、D


質問 # 29
What are some of the unique attributes of an assessment cycle in Controlling? Note: There are 2 correct answers to this question.

  • A. They transfer only primary costs.
  • B. They use a secondary cost element during transfer.
  • C. They use the original cost element during transfer
  • D. They transfer primary and secondary costs.

正解:B、D


質問 # 30
How can you populate local variables in Profitability Analysis reports?

  • A. By populating from user parameters
  • B. By user entry during report execution
  • C. By user exit
  • D. By Business Add-In

正解:B


質問 # 31
You are setting up a direct internal activity allocation in SAP S4/HANA. What is valid receivers for the activity? Note: There are 3 correct answers to this question.

  • A. Sales order item
  • B. General ledger account
  • C. Internal order
  • D. Profit center
  • E. WBS element

正解:A、C、E


質問 # 32
Which of the following objects can be selected in templates for activity-based costing? Note: There are 2 correct answers to this question.

  • A. Internal order
  • B. Cost center/activity type
  • C. Business process
  • D. WBS element

正解:A、D


質問 # 33
Which field can you select for both reporting in costing based and account-based Profitability Analysis?

  • A. Cost element
  • B. Version
  • C. Value in Controlling Area Currency
  • D. Record type

正解:B


質問 # 34
Which of the following statements best describe Product Cost by Period? Note: There are 2 correct answers to this question.

  • A. It is used when the focus of controlling is on a stable and continuous production process.
  • B. It is used to analyze work in process (WIP) based on actual costs.
  • C. It is used in conjunction with a product cost collector.
  • D. It is used when periodic costs outweigh daily postings.

正解:A、C


質問 # 35
You want to determine which operations of the routing should be considered in a product cost calculation.
How do you do this? Note: There are 2 correct answers to this question.

  • A. By marking the Relevance to Costing indicator in the operation
  • B. By marking the cost indicator in the control key assigned to the operation
  • C. By defining a usage key in the header of the routing.
  • D. By assigning a cost center to the work center in the operation

正解:A、B


質問 # 36
What are some of the characteristics of SAP Core Data Services (CDS) views? Note: There are 3 correct answers to this question.

  • A. CDS views have ready-to-use content.
  • B. CDS views support authorization.
  • C. CDS views have no latency.
  • D. CDS views duplicate data for reporting efficiencies.
  • E. CDS views are considered system modifications.

正解:A、B、C


質問 # 37
Which default values can you configure for the product cost collector? Note: There are 2 correct answers to this question.

  • A. Costing variant for preliminary costing
  • B. Result Analysis (RA) key
  • C. Result Analysis (RA) Version
  • D. Variance variant

正解:A、B


質問 # 38
Which of the following steps are part of the procedure to update the standard price of the material? Note:
There are 2 correct answers to this question.

  • A. Mark the cost estimate.
  • B. Release the cost estimate.
  • C. Split the costs.
  • D. Archive the cost estimates.

正解:A、B


質問 # 39
What can you configure in the settlement profile? Note: There are 2 correct answers to this question.

  • A. Determine whether settlement is required.
  • B. Define document management parameters.
  • C. Determine an overhead key.
  • D. Define a number range for settlement document.

正解:A、B


質問 # 40
What master data objects can you set up using time-based fields? Note: There are 2 correct answers to this question.

  • A. Activity type
  • B. Cost element
  • C. Statistical key figures
  • D. Cost centers

正解:A、D


質問 # 41
You define rules in a status profile and assign the profile to your internal order type. What do you use the status profile for? Note: There are 3 correct answers to this question.

  • A. To set the initial status as Created or Released
  • B. To define users for the order
  • C. To permit or forbid specific transactions
  • D. To define the user status
  • E. To activate the CO partner update

正解:A、C、D


質問 # 42
How does the system derive the requirement type from the material master data? Note: There are 2 correct answers to this question.

  • A. Strategy group -> planning strategy -> requirements type
  • B. MRP group -> requirements class -> planning strategy -> requirements type
  • C. Strategy group -> planning strategy -> requirements class -> requirements type
  • D. MRP group -> Strategy group -> planning strategy -> requirements type

正解:A、D


質問 # 43
You want to maintain a cost component structure. What can you determine for each cost component? Note:
There are 3 correct answers to this question.

  • A. Relevance of cost component to inventory valuation
  • B. Assignment of cost component of cost component group
  • C. Assignment of cost component to calculation base for overheads in costing sheet
  • D. Relevance of cost component to results analysis
  • E. Relevance of cost component to goods manufactured

正解:A、B、E


質問 # 44
......

C_TS4CO_2021リアル有効かつ正確な問題集82問題と解答が待ってます:https://www.jpntest.com/shiken/C_TS4CO_2021-mondaishu

C_TS4CO_2021認証と実際の解答があります:https://drive.google.com/open?id=1eC3eeoKs308exnQSp-Uhn_aiea_kjK9i

弊社を連絡する

我々は12時間以内ですべてのお問い合わせを答えます。

オンラインサポート時間:( UTC+9 ) 9:00-24:00
月曜日から土曜日まで

サポート:現在連絡