
2026年03月25日更新されたE-S4CON-2025トレーニング最新認定問題をゲットSAP Certified Specialist合格目指せ
認定トレーニングE-S4CON-2025試験問題集でテストエンジン
質問 # 16
You are running an SAP ECC system with SAP BASIS 740, non-Unicode on SAP MaxDB. Which of the following are possible paths to perfform an SAP S/4HANA conversion? Note: There are 3 correct answers to this question.
- A.
- B.
- C.
- D.
- E.
正解:B、D、E
質問 # 17
Which step can be optimized when you provide the MIGRATE_DT_DURXML file to SUMM?
- A. Shadow on target creation
- B. Downtime conversion
- C. Silent data migration (SDM)
- D. Downtime migration
正解:D
質問 # 18
What is the name of the additional server that is used for a transition to SAP S/4HANA Cloud Private Edition?
- A. Migration Hub
- B. Transition Server
- C. Migration Server
- D. Central Instance
正解:C
質問 # 19
You performed a custom code checck for an SAP S/4HANA conversion.
In which transactions can you review the results? Note: There are 2 correct answers to this question.
- A. SAT(Runtime Analysis)
- B. ATC (ABAP Test Cockpit)
- C. SYCM (Simplification Database Content)
- D. SE80 (Object Navigator)
正解:B、D
質問 # 20
You are performing an SAP S/4HANA conversion of the development system.
Which credentials do you use, and in which system, to perform the adjustment of dictionary objects (SPDD)?
- A. Credentials of a named user in client 000 of the shadow system
- B. Credentials of user DDIC in client 000 of the shadow system
- C. Credentials of user DDIC in the development client of the development system
- D. Credentials of a named user in the development client of the development system
正解:D
質問 # 21
You have selected "Standard" as scenario strategy in the SUM tool.
Which steps take place via the shaddow instance? Note: There are 2 correct answers to this question.
- A. Modification adjustment (SPAU)
- B. Activation of dictionary objects (ACT_UPG)
- C. Conversion of application tables (PARCONV_UPG)
- D. Modification adjustment (SPDD)
正解:B、D
質問 # 22
Which preparational steps must be performed for an SAP S/4HANA conversion? Note: There are 2 correct answers to this question.
- A. Uninstall SAP Fiori apps NO T released for SAP_UI 7.50.
- B. Install add-on SAP Gatewayy 7.50.
- C. Perform the custom code adjustment.
- D. Delete client 066 (Early-Waatch client).
正解:A、D
質問 # 23
You are running an SAP ECC system .
For which of the following activitiess does SUM allow you to use the near-Zero Downtimme Maintenance (nZDM) capabilities? Note: There are 3 correct answers to this question.
- A. Perform an SAP S/4HANA conversion including DMO.
- B. Perform an SAP S/4HANA conversion without DMO.
- C. Apply SAP Support Packagees.
- D. Use DMO for SUM.
- E. Upgrade the SAP system.
正解:C、D、E
質問 # 24
You are performing an SAP S/4HANA conversion for your production system. This conversion project requires that certain business functtions are switched on. Following SAP recommendatiions, how will you achieve this? Note: There are 2 correct answers to this question.
- A. Activate the required business functions manually in the production system.
- B. During conversion, SUM deelivers some business functions already activated.
- C. Import a transport request from the development system that contains the reccording of the activation.
- D. Activate the required business functions in the switch framework from section S/4H_ALWAYS_ON_FUNCTIONS.
正解:B、C
質問 # 25
You are performing an SAP S/4HANA conversion with scenario strategy Standard. Whicch phases are executed during SUM technical dowwntime? Note: There are 2 correct answers to this question.
- A. PARMVNT_UPG
- B. TABIM UPG
- C. TABIM_SHADOW_INC
- D. PARDIST_SHD
正解:A、B
質問 # 26
What do you need to consider when performing the SI checks for an SAP S/4HANA connversion? Note: There are 2 correct answers to this question.
- A. You need an SAP system baased on AS ABAP 7.52 or above for the SI check frammework.
- B. The Si checks are executed in the development system and the results are trannsported into the subsequent systems.
- C. You need to build up an SI check framework by applying SAP Notes.
- D. The errors from the SI checks must be solved; otherwise, SUM will report an errror.
正解:C、D
質問 # 27
You are performing an SAP S/4HANA conversion.
When does the silent data migration (SDM) take place using the SUM defaults?
- A. During the Postprocessing roadmap step
- B. Before the start of the SUM technical downtime
- C. After SUM has ended
- D. During the Preprocessing rooadmap step
正解:C
質問 # 28
You are using DMO of SUM. You defined 40 parallel R3load processes during uptime annd 80 parallel R3load processes during downtime. You have chosen table count verification, but not table contents comparison.
Phase EU_CLONE MIG_DT_RUN is running In the Charts Control Center, you can see 400 process buckets being executed in parallel.
Why are 40 Process Buckets executed in parallel?
- A. These are 40 pairs of R3load processes, so there are 80 R3load processes running
- B. Without table contents commparison, only 40 R3load processes are being started.
- C. SUM is still running in uptimme; the 40 defined R3load processes are considered.
- D. There are 40 R3load processses used for copying and 40 R3load processes for taable count verification.
正解:A
質問 # 29
Which of the following are valid options to check the progress of an inplace SUM DMO run? Note:
There are 2 correct answers to this question.
- A. Check the log files written in the SUM directory, subdirectory abap, subdirectory log
- B. Check logs for jobs starting with RSUPG SGEN in the SAP system.
- C. Check the dump size of the database export in the SUM directory, subdirectoryy abap, subdirectory load.
- D. Check the Charts Control Ceenter in the SUM UL
正解:A、D
質問 # 30
During the upgrade of your developpment system, you run into the adjustment of non-dictionary objects, handled by transaction SPAAU. There you find programs that are shown in statuus "automatic adjustment" (green traffic light).
What will happen with these prograams when you continue with your upgrade without performing any other actions inside your SAP syystem?
- A. SUM refuses to continue unnless you have marked a transport request as modiffication adjustment transport.
- B. SUM continues with the next phase, and the coding of your modified objects are set to the new SAP standard.
- C. SUM continues with the next phase and your modifications are kept as in the start release.
- D. Before continuing with the next phase, SUM asks for a modification adjustmennt transport.
正解:D
質問 # 31
What is the minimum SAP BASIS rellease of an SAP ECC system that can be converted t o an SAP S/4HANA Server 2023?
- A. 0
- B. 1
- C. 2
- D. 3
正解:A
質問 # 32
......
合格を確定するガイドでE-S4CON-2025試験準備しよう:https://www.jpntest.com/shiken/E-S4CON-2025-mondaishu
SAP Certified Specialist E-S4CON-2025無料最新のリアル試験問題と回答:https://drive.google.com/open?id=1cKDT4vqADSUibe1rBnVLWbVe8mfnEp4_