CIPS L4M3試験情報と無料練習テスト問題で合格せよ
2023年最新のの問題L4M3問題集で更新されたCIPS試験問題集を試そう
質問 81
Infra Constructions receive a contract for construction of a building, and following terms were agreed upon. "The entire cost of the project will be reimbursed to Infra Constructions (estimated cost of the project being $ 25 million). The profits will be 20% of the entire cost of a project subject to a max of $ 5 million." This arrangement is an example of...?
- A. Gain-share/pain-share arrangment
- B. Cost-plus pricing arrangement
- C. Incentive pricing arrangement
- D. Fixed-pricing arrangement
正解: B
解説:
In the contract term, the buyer agrees to pay the contractor the cost of doing project plus a profit. This is an example of cost-plus pricing arrangement.
On the other hand, "Fixed-pricing arrangement" often refers to lump-sum contract or supply/service contract with fixed price. "Incentive pricing arrangement" and "Gain-share/pain-share arrangement" have the same meaning. In this type of arrangement, both supplier and buyer agree on a target (it can be cost, or lead time, or quality, etc). Once the supplier reaches that target, it will be rewarded with a portion of the gain that the buyer gets, and will pay the price if it fails.
Reference:
LO 3, AC 3.3
質問 82
MWB operates serviced offices in central London. Rock entered a contractual licence with MWB to occupy office space in Marble Arch and had accumulated licence fees in arrears. The original licence agreement contained a 'No Oral Modification' clause that said: 'All variations to this licence must be agreed, set out in writing and signed on behalf of both parties before they take effect'.
After 6 months, Rock director re-negotiated to extend payment period over phone call and MWB credit controller agreed his proposal. Is this agreement considered as an effective variation to the original licence agreement?
- A. No, because the mechanism for variation has been set out in the original contract
- B. Yes, because the credit controller had agreed with Rock director's proposal
- C. Yes, because parties who agree to altering the original contract orally despite a 'No Oral.
- D. Modification' clause, must have intended to dispense with the clause
- E. No, because Rock director assumed that the variation was effective and convinced credit controller to believe it
正解: A
解説:
The license can be amended during its lifespan. However, in this case, it already has a clause allowing for mechanism of variation which sets out who can authorise changes and prohibits any oral variation. Therefore, the agreement between Rock's director and MWB credit controller is not an effective variation to the license.
Reference:
LO 1, AC 1.1
質問 83
In which of the following section of a specification, requirements for training to use the equipment will be set out?
- A. Issue reference
- B. Performance
- C. Implementation
- D. Consultation requirements
正解: C
解説:
Implementation is a substantive requirement which covers the following areas:
- Will there be a need to train the staff to use the equipment?
- Are there integration requirements with other systems or processes?
- How will this work?
- What are the timescales?
- Are detailed method statements required?
Consultation requirements regards to explicitness of compliance with any national or local legal requirements Reference:
LO 2, AC 2.1
質問 84
Which of the following should be done by procurement professionals right after obtaining a pre-written specification for a critical item so that the added value will be the greatest?
- A. Evaluate tender or quotation
- B. Select the best supplier
- C. Issue invitation to tender or request for quotation
- D. Challenge the used specification
正解: D
解説:
A previously used specification must always be robustly challenged to see how well it fits the proposed circumstances. Aspects which appear not to fit should be analysed to understand why they were included in the sample specification and whether this changes the view on whether or not they should be omitted or changed.
Reference:
LO 2, AC 2.1
質問 85
In which of the following conditions, request for quotation produces the best results?
- A. Under a complex process
- B. With an ambiguous specification
- C. Under framework agreements
- D. With strategic items
正解: C
解説:
Request for quotation has valuable function when its use is properly controlled. It works the best under framework agreements where the contract terms are already fixed.
Reference:
LO 1, AC 1.1
質問 86
A manufacturing company signed a contract with a raw material supplier. The contract includes a clause on liquidated damages in case of late delivery. Purchaser was obliged to pay after 30 days from delivery. Eventually raw material was delivered 1 week later than initial plan due to supplier's slow production process. There is no defect in the delivered batch. Which of the following can be claimed by the manufacturing company?
- A. Right of third party
- B. Right of set-off
- C. Right of extending payment
- D. Rights to refunds or repairs
正解: B
解説:
In certain circumstances, where two parties have monetary debts against each other, the right to set-off may arise. A right of set-off allows a ("Party 1") to take into account the amount owed to it by the second party ("Party 2") against any amount owed by Party 1 to Party 2, each party must be a debtor and a creditor.
Common law provides the key features that must be present for set-off to arise are;
1. mutuality of debts (each party must be the sole beneficial owner of the debt it is owed and the sole person liable for the debt it owes)
2. the claims each party has must be for non-payment of money
The common law provisions of set-off can be greatly enhanced by the inclusion of a contractual right to set-off (this is discussed further below) so that set-off is applicable in a greater range of situations. If you envisage set-off being a useful right it is not advisable to rely on the implied ability to use it (via common law or equitable set-off). Common law and equitable set-off are subject to various conditions and limitation however, a contractual right of set-off can be drafted to ensure parties are able to agree exactly how and when set-off should be applied.
In the above scenario, the supplier owes the manufacturer the payment for damages, while the manufacturer owes the supplier the payment for goods. This is mutuality of debts, which leads to right of set off.
Reference:
- Set-off on the right foot: a practical guide to set-off
- CIPS study guide page 158-159
LO 3, AC 3.2
質問 87
Which of the following is a key feature of liquidated damage clauses?
- A. The amount of damage is predetermined
- B. The liquidated damages are non-negotiable
- C. Liquidated damage is a penalty
- D. The amount of liquidated damages must be exceptionally larger than the actual damages incurred
正解: A
解説:
Liquidated damages are presented in certain legal contracts as an estimate of otherwise intangible or hard-to-define losses to one of the parties. It is a provision that allows for the payment of a specified sum should one of the parties be in breach of contract.
Understanding Liquidated Damages
Liquidated damages are meant as a fair representation of losses in situations where actual damages are difficult to ascertain. In general, liquidated damages are meant to be fair, rather than punitive.
Liquidated damages may be referred to in a specific contract clause to cover circumstances where a party faces a loss from assets that do not have a direct monetary correlation. For example, if a party in a contract were to leak supply chain pricing information that is vital to a business, this could fall under liquidated damages.
A common example is a design phase for a new product that may involve consultation with outside suppliers and consultants in addition to a company's employees. The underlying plans or designs for a product might not have a set market value. This may be true even if the subsequent product is crucial to the progress and growth of a company. These plans may be deemed to be trade secrets of the business and highly sensitive. If the plans were exposed by a disgruntled employee or supplier, it could greatly hamper the ability to generate revenue from the release of that product. A company would have to make an estimation in advance of what such losses could cost in order to include this in a liquidated damages clause of a contract.
Limitations of Liquidated Damages
It is possible that a liquidated damages clause might not be enforced by the courts. This can occur if the monetary amount of liquidated damages cited in the clause is extraordinarily disproportional to the scope of what was affected by the breached contract.
Such limitations prevent a plaintiff from attempting to claim an unsubstantiated exorbitant amount from a defendant. For instance, a plaintiff might not be able to claim liquidated damages that amount to multiples of its gross revenue if the breach only affected a specific portion of its operations. The concept of liquidated damages is framed around compensation related to some harm and injury to the party rather than a fine imposed on the defendant.
The courts typically require that the parties involved make the most reasonable assessment possible for the liquidated damages clause at the time the contract is signed. This can provide a sense of understanding and reassurance of what is at stake if that aspect of the contract is breached. A liquidated damages clause can also give the parties involved a basis to negotiate from for an out-of-court settlement.
Reference:
- Liquidated Damages
- CIPS study guide page 158-159
LO 3, AC 3.2
質問 88
Consequences and actions that arise from certain KPI scores must be...? Select TWO that apply.
- A. Deliberately omitted
- B. Terminated
- C. Unilaterally imposed by the purchaser
- D. Mutually agreed
- E. Documented
正解: D,E
解説:
Supplier performance management and monitoring is a fundamental part of contract management. It starts with setting KPIs, targets and consequences or actions that arise from KPI scores. The measures, objectives and targets used in the monitoring of the supplier's performance must reflect those that were agreed when the contract was let. That is why it is important to specify a commitment to continuous improvement at the outset. It would be unfair to the supplier to suddenly introduce a range of measures after the contract had begun - however if such an introduction mid-term through the contract is unavoidable then it should be negotiated and agreed in a professional manner and not merely imposed on the supplier.
In conclusion, the details of how KPIs will be monitored and the actions or consequences resulting from scores achieved must be documented and agreed between the parties. This details may be embedded in the specification or the main body of the contract or it may be set out in a SLA.
Reference:
- Performance Monitoring of Suppliers - CIPS Knowledge summary
- CIPS study guide page 101-109
LO 2, AC 2.2
質問 89
Which of the following should be used in a contract for window cleaning during the next three months?
- A. Fixed pricing arrangement
- B. Variable pricing arrangement
- C. Standard schedule of rates
- D. Cost-plus arrangement
正解: A
解説:
A contract for window cleaning during the next three months is a short-term service contract in which changes of input costs (labour, tools,...) are very unlikely to happen.
Fixed pricing arrangement is useful for small to medium scope project, with short timelines, where what is delivered can be adequately specified and the likelihood of changes to the specification, scope and input costs is limited.
Reference:
LO 3, AC 3.3
質問 90
Under hire purchase agreement, when will the ownership of asset legally belong to the purchaser?
- A. When the agreement is signed
- B. When the purchaser takes possession of the asset
- C. When the final instalment is paid
- D. When the down payment is made
正解: C
解説:
Hire purchase is an arrangement for buying expensive consumer goods, where the buyer makes an initial down payment and pays the balance plus interest in installments. Ownership is not transferred until the end of the agreement, hire purchase plans offer more protection to the vendor than other sales or leasing methods for unsecured items. That's because the items can be repossessed more easily should the buyer be unable to keep up with the repayments.
The answer is 'When the final instalment is paid'.
Reference:
- Hire Purchase Agreements
- CIPS study guide page 70
LO 1, AC 1.3
質問 91
Southwark is negotiating a contract with Orchard to provide software and IT services. Orchard will manufacture and install the products which are contractually supplied by IBM. Southwark's procurement manager is worried that during the contract there would be some problems that they would not able to claim for damages from Orchard. Which of the following should be included in the head contract so that Southward can sue IBM, should the need arise?
- A. Negligence
- B. Insurance
- C. Collateral warranty deed
- D. Indemnity
正解: C
解説:
A Collateral Warranty is a contract under which a consultant, a building contractor or a sub- contractor warrants to a third party that is has fulfilled its obligations under its professional appointment, building contract or sub-contract. The purpose of a Collateral Warranty is to give a third party, who is not a party to the original contract, rights to enforce that original contract.
In this case, IBM is the subcontractor, then purchaser can use collateral warranty deed to bind them.
Reference:
- Collateral Warranties - an Overview
- CIPS study guide page 39-40
LO 1, AC 1.2
質問 92
Which of the following statement is true about one-off contract?
- A. Ad-hoc purchase is not a type of one-off purchase
- B. Suppliers have many opportunities to improve the quality during the performance of one-off contract
- C. One-off contracts can be used for services and works
- D. One-off contracts only apply to low-value, low-risk purchase
正解: C
解説:
One-off contract is the type of contract that relates to a single purchase. One-off contracts can be used for goods, services or works. One-off contract can be simple (such as buying a small number of office stationeries) or complex (such as a construction project or buying an aircraft).
A one-off contract lasts "until completion of the obligations of the parties". The performance is unlikely to be improved during contract performance since the duration is relatively shorter than framework agreement or call-off contract.
Ad-hoc purchase is an item bought for a single and non-recurring use or purpose. Ad-hoc purchase is a type of one-off contract.
Reference:
LO 1, AC 1.3
質問 93
Which of the following statements is FALSE on contracts for the leasing of assets?
- A. The ownership of leased asset is transferred to the lessee at the end of the period
- B. The party responsible for maintenance, insurance and taxes is subject to negotiation
- C. In lease agreement, the possession and right of use of an asset are transferred to the lessee
- D. The lessee may bear some risks of ownership, such as the liability to insure the asset
正解: A
解説:
A lease is a contractual arrangement calling for the lessee (user) to pay the lessor (owner) for use of an asset. Some characteristics of Leases are:
- The right to use the lessor's asset is granted in exchange for a fee called the lease payment.
- The lease payments are usually paid in installments.
- Leases may be long- or short-term.
- At its inception a lease agreement constitutes a mutually unperformed contract Though the ownership of the asset is not transferred to the lessee, some responsibilities and risks do. The lessor and lessee may negotiate on who is responsible on maintenance, insurance, etc.
Reference:
LO 1, AC 1.3
質問 94
A procurement manager is setting KPIs measurement for user satisfaction. He also wants to encourage users to share the reason why they feel the way they do. Which of the following types of KPI should the procurement manager apply?
- A. Numerical measure
- B. Binary measure
- C. Qualitative assessment
- D. Quantitative measure
正解: C
解説:
There are 3 types of KPI measure:
- Binary KPIs
- Quantitative KPIs (or numerical)
- Qualitative KPIs
User satisfaction is subjective, therefore, using qualitative assessment is the best answer.
Reference:
LO 2, AC 2.2
質問 95
A procurement manager is preparing a long-term contract with a major supplier. She decides to use the variable pricing arrangement using price indices. The payment terms describe the circumstances and mechanism where the price is allowed to change. In order to successfully manage this type of contract, the buying organisation should have...?
- A. Good market knowledge
- B. Economy of scale
- C. Value for money
- D. Selection of base year
正解: A
解説:
There are several approaches to price adjustment for long-term contract. Describing circumstances and mechanism is one of them. Although this approach has some limitations, it is the best option. It relies on good market knowledge but provides the most equitable approach to satisfying the needs of the purchaser and the supplier.
Reference:
LO 3, AC 3.3
質問 96
What is the pricing method that incentivises the supplier to control their costs?
- A. Skimming pricing
- B. Target Costing
- C. Cost-plus pricing
- D. Penetration pricing
正解: B
解説:
Penetration pricing is a marketing strategy used by businesses to attract customers to a new product or service by offering a lower price during its initial offering. The lower price helps a new product or service penetrate the market and attract customers away from competitors.
Price skimming is a product pricing strategy by which a firm charges the highest initial price that customers will pay and then lowers it over time. As the demand of the first customers is satisfied and competition enters the market, the firm lowers the price to attract another, more price-sensitive segment of the population. The skimming strategy gets its name from "skimming" successive layers of cream, or customer segments, as prices are lowered over time.
Incentive contracts allow sharing of the risks between the contractor and the client. The contractor is reimbursed all its justifiable costs in addition to a calculated fee. Target costing is an element of incentive contracts.
Cost-plus pricing is also known as markup pricing. It's a pricing method where a fixed percentage is added on top of the cost to produce Reference:
LO 3, AC 3.3
質問 97
A purchase order can become a contract between supplier and purchaser if it is...?
- A. Received by the supplier
- B. Issued by the buyer
- C. Accepted by the supplier
- D. Edited by the supplier
正解: C
解説:
A purchase order is a document sent from a buyer to a seller, with a request to order a product. The purchase order often has its number, description and quantity of the goods, unit prices and total price, name of issuer, time of delivery, standard terms and conditions, etc. It is effectively an offer to supplier. The purchase order will become a formal contract if supplier accepted it by written notice or by performance (such as deliver the goods to the buyer's premise).
Reference:
LO 1, AC 1.2
質問 98
Which of the following will be included in a conformance specification?
1. Brand names
2. Description of the operating environments
3. Chemical formulae
4. Required safety level
- A. 1 and 3 only
- B. 1 and 4 only
- C. 1 and 2 only
- D. 2 and 3 only
正解: D
解説:
According to CIPS, there are two main types of specification:
- Conformance specification - is more output driven as it outlines the product details exactly which may include the material, dimensions, tolerances, source, ingredients, packaging, storage of the part or material.
- Performance specification - is more output driven in terms of what the part or material must achieve.
Among the four options, only 2. 'Description of the operating environments' and 3. 'Chemical formulae' are possible components of a conformance specification. Brand names can be a part of a performance specification, according to a document published by CIPS and NIGP.
Reference:
- CIPS study guide page 8-10
- Knowledge Byte - Specification Development
- Principles and Practices of Public Procurement: Specifications
LO 1, AC 1.1
質問 99
A procurement professional is drafting payment terms for a commercial contract. He is considering about payment method if defective products are found. Which of the following should be embedded in payment terms to control this issue?
- A. Invoice preparation
- B. Retention clause
- C. Pay-less notice
- D. Remedies for late payment
正解: B
解説:
Retention money is the payment for a service or product that is withheld pending the completion of some specified condition. For example, buyer may withhold the amount due until the supplier replace all defective goods.
Pay-less notice is the notice under a contract which states that the invoice will only be partially paid because of some issues such as supplier has to pay the damages.
Remedies for late payment are remedies that supplier may seek when a buyer pay it later than the stated payment terms. Normally, the buyer will be charged an interest rate.
Reference:
LO 3, AC 3.3
質問 100
Transformers & Rectifiers Ltd wanted to buy some specialist gaskets. They sent a request for quotation with specification to Needs Ltd. The supplier replied with a quotation in which had its own terms and conditions. The buyer edited delivery terms on the quotation and sent the document back to Needs Ltd. Gaskets were delivered to Transformers' premise with an invoice from Needs Ltd. Which of the following is most likely to be the governing terms if the two companies must settle the dispute at court?
- A. Terms and conditions in the request for quotation
- B. Terms & conditions in the original quotation
- C. Edited terms and conditions
- D. Terms and conditions in the invoice
正解: C
解説:
In the 'battle of the forms', generally who shot the last will win. This is not applied to this case. Initial RFQ is an invitation to treat, then the quotation forms an offer. Transformers & Rectifiers Ltd edits terms and conditions then sends back to supplier, this act terminates Needs's offer and makes a new offer. Delivery of goods can be deemed as acceptance from Needs Ltd. The contract is formed with its details in the edited terms and conditions.
Reference:
LO 1, AC 1.2
質問 101
Which of the following will be always automatically deemed as a consideration?
- A. Promise given to a third party
- B. Implied consideration
- C. Past consideration
- D. Promise to perform over and above an existing obligation
正解: D
解説:
Consideration only appears in common law countries. Below are some examples of what is and what is not consideration:
- Past consideration is something that has already been done or given. This cannot act as consideration
- Implied consideration: if the detail of a promise to pay is expressed after the provision of goods or services, but there is an implication that such promise would be forthcoming, this may (depending on the facts) be valid consideration.
- A promise given to a third party: this is not normally consideration, and is based on a concept known as privity of contract. Anyone who is not a party to the contract, even if they are beneficiary of it, cannot sue if the terms of the contract are breached.
- A promise to perform over and above an existing obligation: This is always consideration Reference:
- Consideration & Promissory Estoppel
- CIPS study guide page 36-40
LO 1, AC 1.2
質問 102
Which of the following are NOT covered by CISG? Select TWO that apply:
- A. Transfer of risks
- B. Liability of the seller for death or personal injury
- C. Contract validity
- D. Remedies for breach of contracts
- E. Liability to pay damages
正解: B,C
解説:
United Nations Convention on Contracts for the International Sale of Goods (Vienna Convention or CISG) Vienna Convention was prepared by by the United Nations Commission on International Trade Law (UNCITRAL) and adopted by a diplomatic conference on 11 April 1980. The Convention was welcomed by several countries from different geographic areas, with different legal and political systems. As of 20 August 2020, the Convention has93 Contracting States. The Convention has proved the effectiveness of an uniform text on international trade law.
What CISG covers, and what it does not
In the 6 first articles of the Convention, the authors set up the boundaries of its application.
First is about where it applies. According to UNCITRAL, the Convention applies to contracts of sale of goods between parties whose places of business are in different States and either both of those States are Contracting States or the rules of private international law lead to the law of a Contracting State. A few States have availed themselves of the authorisation in article 95 to declare that they would apply the Convention only in the former and not in the latter of these two situations. As the Convention becomes more widely adopted, the practical significance of such a declaration will diminish. Finally, the Convention may also apply as the law applicable to the contract if so chosen by the parties. In that case, the operation of the Convention will be subject to any limits on contractual stipulations set by the otherwise applicable law.
Second, the Convention has a list of goods that are not subject to its application in Article 2. Article 3 clarifies the differences between manufacturing contracts and sale contract.
Third, Article 4 and 5 clearly states what CISG does not covers, including grounds for contract invalidity and liabilities to death or injury of person caused by the the goods Finally, the Convention respects the contractual freedom of the trading parties. Trading parties may select this convention as governing law or select other instrument, such as UPICC or domestic laws.
Reference:
- Governing law in International Contracts - Would you choose CISG or UPICC (Part 1)
- CIPS study guide page 49-52
LO 1, AC 1.2
質問 103
......
CIPS L4M3 認定試験の出題範囲:
| トピック | 出題範囲 |
|---|---|
| トピック 1 |
|
| トピック 2 |
|
| トピック 3 |
|
| トピック 4 |
|
| トピック 5 |
|
| トピック 6 |
|
最新のL4M3試験問題集でCIPS試験が合格できます:https://www.jpntest.com/shiken/L4M3-mondaishu
合格できるCIPS L4M3のPDF問題集で最近更新された161問あります:https://drive.google.com/open?id=13ocePGj_llK_F5uKsyAJZs50HNPvmYsY