[Q42-Q63] ベスト良質なSAP C-ARSUM-2108試験問題JPNTestリアル練習試験 [2022]

Share

ベスト良質なSAP C-ARSUM-2108試験問題JPNTestリアル練習試験 [2022]

重要な試験問題でSAP Certified Application Associate - SAP Ariba Supplier Management一発合格

質問 42
Which is a benefit of using SAP Ariba Supplier Risk?

  • A. Category and region-specific qualification and segmentation.
  • B. Automatic adverse media monitoring from multiple news sources.
  • C. Additional approvals in Contract Workspaces with suppliers categorized as high risk.
  • D. Maintain key performance indicators for suppliers.

正解: A,B

 

質問 43
Your customer wants to ask a different set of questions for supplier qualifications in North America, South America, and Europe. How do you configure these questions in your customer's Supplier Qualification Project template?

  • A. Assign region-based visibility conditions within the qualification questionnaire survey
  • B. Add the questions to separate content documents mapped to each region
  • C. Create separate modular questionnaires to be sent to suppliers during the qualification process
  • D. Update the user matrix to assign the appropriate questionnaire based on the region selected

正解: C

 

質問 44
Your customer wants to include a system group or project group in the approval flow for a new supplier.
Which of the following is a limitation with a simple approval rule for SAP Ariba templates?

  • A. Only one user can be added as an approver in a simple approval rule.
  • B. The system will accept the approval from a single user within the group.
  • C. Project group members must be assigned using a team member rules file.
  • D. System groups CANNOT contain users.

正解: B

 

質問 45
Which of the following are characteristics of recurring phases? Note: There are 2 correct Answers to this question.

  • A. The survey and scorecard documents must be recreated each time.
  • B. They can be started automatically based on recurrence schedule.
  • C. They automatically stop after a set number of reoccurrences.
  • D. They can be triggered manually in between scheduled occurrences.

正解: C,D

 

質問 46
You need to use the SM Administration area to configure integration between SAP Ariba Supplier Lifecycle and Performance and an external system. Which system group do you require?

  • A. Preferred Supplier Manager
  • B. SM ERP Admin
  • C. Supplier Request Manager
  • D. SM Ops Admin

正解: D

 

質問 47
Your customer approves the disqualification of a supplier for Software, a category that appears under IT Services in the category hierarchy. What additional change occurs for this supplier?

  • A. The supplier's preferred category status for IT Services is removed.
  • B. The requalification process for Software begins automatically.
  • C. A new recurrence is created in active Supplier Performance Management projects for the supplier.
  • D. The supplier is removed from any in-progress sourcing events for Software.

正解: A

 

質問 48
Your customer is using SAP Ariba Supplier Lifecycle and Performance, and wants suppliers to accept a code of conduct each year outside of the registration process. Which option do you recommend?

  • A. Knowledge project
  • B. Modular questionnaire
  • C. Preferred supplier management project
  • D. Supplier workspace

正解: B

 

質問 49
You applied an update to the Team Member Rules file in a Supplier Performance Management project template and published. However, the project you created two weeks ago does NOT reflect this updated file. Why is this the case?

  • A. A user must edit the project and accept the changes.
  • B. The field labels in the file are incorrect.
  • C. The template upgrade option was disabled.
  • D. A deactivated template was used for the project.

正解: C

 

質問 50
Your customer is loading a large group of legacy suppliers as part of their implementation. They want to use the mass registration invitations option but have concerns with sending all of the invitations at once.
Which option do you recommend?

  • A. Import all legacy suppliers, then upload waves to send the invitations to multiple subsets of the suppliers.
  • B. Import smaller groups of suppliers and wait for them to register before importing the next group.
  • C. Register on behalf of the suppliers to avoid sending invitation emails to a large group.
  • D. Ask the suppliers to register for an Ariba Network account prior to loading them into SAP Ariba.

正解: A

 

質問 51
Which feature can you use to ensure a process flow is followed in the correct order?

  • A. Phases
  • B. Task rank
  • C. Notification profiles
  • D. Predecessors

正解: A

 

質問 52
Your customer wants to measure how well their direct materials suppliers comply with their contract terms. They want to report on each supplier's overall compliance score, plus specific measurements, such as on time delivery and defective parts per million. How do you suggest the customer structure their scorecard?

  • A. Create a report including each measure and map the KPIs to the report.
  • B. Add individual KPIs for the overall compliance score and each measurement.
  • C. Create a KPI Section called Compliance containing individual KPIs for each data point.
  • D. Build compliance-related KPIs in the sourcing library so reporting includes data at the top level.

正解: A

 

質問 53
Which types of optional third-party content are supported in SAP Ariba Risk? Note: There are 3 correct Answers to this question.

  • A. Environmental and social
  • B. Financial
  • C. Geographic
  • D. Compliance
  • E. Adverse media

正解: A,B,D

 

質問 54
While reviewing a supplier request, an approver determines that there is not enough information to make an approval decision. Which option does the approver have to obtain this information?

  • A. Use the message board to contact the vendor management team.
  • B. Click the Request Additional Info button to re-engage the requester.
  • C. Click the Escalate button to add the requester's supervisor to the approval flow.
  • D. Invite the supplier contact to complete the supplier request form.

正解: B

 

質問 55
Which of the following templates are available in SAP Ariba Supplier Information and Performance Management? Note: There are 3 correct Answers to this question.

  • A. Supplier performance management
  • B. Supplier qualification
  • C. Modular questionnaire
  • D. Preferred supplier management
  • E. Supplier registration

正解: B,E

 

質問 56
Which action enables the evaluation of a supplier for a preferred status level?

  • A. The supplier organization is assigned an Ariba Network ID.
  • B. An administrator clicks the sync button to create a record in the ERP system.
  • C. A qualification for the supplier is fully approved.
  • D. The supplier updates their registration questionnaire to add qualification details.

正解: C

 

質問 57
You are creating a new Supplier Performance Management project template from scratch. Which elements does SAP Ariba support on the Documents tab? Note: There are 2 correct Answers to this question.

  • A. Analytical report
  • B. Recurring phase
  • C. Folder
  • D. Microsoft Word file

正解: A,C

 

質問 58
You configure a template to appear for region: Germany and commodities: homeopathic practice or medical practice. How can you create a visibility condition to achieve this result?

  • A. Create a field match for region and apply the IS EQUAL TO operator for Germany. Apply subcondition with the ALL OF operator with commodity IS IN LIST homeopathic practice and commodity IS IN LIST medical practice.
  • B. Create a field match for region and apply the IS EQUAL TO operator for Germany. Apply a subcondition with the ALL OF operator with commodity IS EQUAL to homeopathic practice and commodity IS EQUAL TO medical practice.
  • C. Create a field match for region is equal to Germany. Apply a subcondition with the ANY OF operator with commodity IS EQUAL to homeopathic practice and commodity IS EQUAL TO medical practice.
  • D. Create a field match for region and apply the IS EQUAL TO operator for Germany. Apply a subcondition with the NONE OF operator with commodity IS EQUAL to homeopathic practice and commodity IS EQUAL TO medical practice.

正解: B

 

質問 59
A supplier is invited to start a qualification. Which activity does the supplier perform first before appearing in Qualified status?

  • A. Upload certificates of insurance
  • B. Submit a response to the questionnaire
  • C. Participate in a sourcing event
  • D. Select a region or commodity

正解: B

 

質問 60
Which is an additional benefit of SAP Ariba Supplier Lifecycle and Performance compared to SAP Ariba Supplier Information and Performance Management?

  • A. Unified vendor model for suppliers
  • B. Supplier workspace projects
  • C. Modular questionnaire projects
  • D. Preferred supplier management projects

正解: C

 

質問 61
Your customer wants to automatically assign approvers to supplier requests based on the supplier's region. Which option do you recommend according to SAP Ariba's best practice?

  • A. Enable chain rules in each approval node within the approval task
  • B. Apply visibility conditions to region-specific project groups on the Team tab of the Supplier Request template.
  • C. Upload a user matrix file in the SM Administration area.
  • D. Create a team member rules file in the Supplier Request template.

正解: C

 

質問 62
Which supplier management project type allows for multiple templates?

  • A. Supplier qualification
  • B. Supplier registration
  • C. SM modular questionnaire
  • D. Supplier disqualification

正解: C

 

質問 63
......

C-ARSUM-2108試験問題集合格保証:https://www.jpntest.com/shiken/C-ARSUM-2108-mondaishu

弊社を連絡する

我々は12時間以内ですべてのお問い合わせを答えます。

オンラインサポート時間:( UTC+9 ) 9:00-24:00
月曜日から土曜日まで

サポート:現在連絡