SAPは2025年最新のE_S4CON_2025サンプル問題は信頼され続けるE_S4CON_2025テストエンジン [Q19-Q43]

Share

SAPは2025年最新のE_S4CON_2025サンプル問題は信頼され続けるE_S4CON_2025テストエンジン

無料お試しSAP E_S4CON_2025問題集PDFは必ずベストの問題集オプションを使おう

質問 # 19
You are performing an SAP S/4HAN A conversion with DMO. You are using the downtimme-optimized data conversion (DoC).
Which steps can partially be moved to uptime processing? Note: There are 2 correct annswers to this question.

  • A. Migration
  • B. Software update
  • C. Conversion
  • D. Main import

正解:A、C


質問 # 20
You are running an SAP ECC system with SAP BASIS 740, non-Unicode on SAP MaxDB. Which of the following are possible paths to perfform an SAP S/4HANA conversion? Note: There are 3 correct answers to this question.

  • A.
  • B.
  • C.
  • D.
  • E.

正解:B、C、D


質問 # 21
You are running an SAP ECC system .
For which of the following activitiess does SUM allow you to use the near-Zero Downtimme Maintenance (nZDM) capabilities? Note: There are 3 correct answers to this question.

  • A. Apply SAP Support Packagees.
  • B. Perform an SAP S/4HANA conversion without DMO.
  • C. Upgrade the SAP system.
  • D. Perform an SAP S/4HANA conversion including DMO.
  • E. Use DMO for SUM.

正解:A、C、E


質問 # 22
You are performing an SAP S/4HANA conversion for your production system. This conversion project requires that certain business functtions are switched on. Following SAP recommendatiions, how will you achieve this? Note: There are 2 correct answers to this question.

  • A. Activate the required business functions manually in the production system.
  • B. Import a transport request from the development system that contains the reccording of the activation.
  • C. Activate the required business functions in the switch framework from section S/4H_ALWAYS_ON_FUNCTIONS.
  • D. During conversion, SUM deelivers some business functions already activated.

正解:B、D


質問 # 23
You are performing an SAP S/4HANA conversion with the migration repetition option. After which phase does SUM stop to enable a teest cycle?

  • A. EU_CLONE MIG SOT RUN
  • B. EU IMPORT ALL
  • C. EU_CLONE MIG_DT_CREATTE
  • D. EU CLONE MIG_DT_RUN

正解:D


質問 # 24
You are performing an SAP S/4HANA conversion with DMO. You entered a specific nummber of R3load processes during the Extraction Roaadmap step.
Where can you change this during the migration via the Utilities option of the SUM UI?? Note: There are 2 correct answers to this questiion.

  • A. In SUM Analysis
  • B. In DMO Migration Preparattion
  • C. In SUM Parameters
  • D. In Process Control Center

正解:C、D


質問 # 25
You are executing as SAP S/4HANA Conversion with scenario strategy Standard. When will the shadow instance be stopped for thee last time?

  • A. Early in the downtime
  • B. Before the downtime startss
  • C. As part of the cleanup process
  • D. At the end of the downtimee

正解:B


質問 # 26
What is the main purpose of perforrming benchmark runs for an SAP S/4HANA conversiion?

  • A. To optimize the main import
  • B. To optimize the activation
  • C. To optimize the conversion
  • D. To optimize the migration

正解:D


質問 # 27
You are performing an SAP S/4HANA conversion. You are in the BIND PATCH phase of the Configuration roadmap step. For soome software components, you find entries in the Calculated level column.
What does the Calculated level indiicate for those software components?

  • A. The SAP Support Packages that will be bound to the conversion
  • B. The SAP Support Packages of the Support Package stack, calculated by the maintenance planner
  • C. The SAP Support Packages in the download directory that are newer than the selected Support Package stack
  • D. The SAP Support Packages contained in the upgrade media, calculated by the maintenance planner

正解:C


質問 # 28
You want to perform an SAP S/4HANA conversion using SUM with inplace DMO.
Which steps run before the beginniing of the technical downtime, irrespective of your SUM configuration? Note: There are 3 coorrect answers to this question.

  • A. Activation of dictionary objects in phase ACT_UPG
  • B. Import of upgrade and langguage data from the download directory in phase TAABIM UPG
  • C. Generation of the new ABAAP loads in phase RUN_SGEN_GENERB
  • D. Import of dictionary objects from the download directory in phase DDIC_UPG
  • E. Creation of application tablles in the SAP HANA database in phase EU_CLONE_MIG_DT_CREATTE

正解:A、B、D


質問 # 29
You are performing an SAP S/4HANA conversion, scenario strategy Standard, with DMOO as an inplace migration. How does SUM transfer the data from the source database to the target database during the migration?

  • A. Using R3load and file transffer
  • B. Using work processes and network socket connection
  • C. Using R3load and memory pipes
  • D. Using R3load and network socket connection

正解:C


質問 # 30
You are performing an SAP S/4HANA conversion with scenario strategy Standard. Whicch phases are executed during SUM technical dowwntime? Note: There are 2 correct answers to this question.

  • A. PARDIST_SHD
  • B. TABIM_SHADOW_INC
  • C. PARMVNT_UPG
  • D. TABIM UPG

正解:C、D


質問 # 31
You want to use the Custom Code Migration Worklist via remote code analysis using thhe ABAP Test Cockpit (ATC). How can you get the latest content of the simplification database?

  • A. Download it from the SAP Support Portal.
  • B. Generate it by analyzing the specific custom code via RFC.
  • C. Apply the corresponding SAAP Note via the Note Assistant.
  • D. Configure it within transacttion ATC.

正解:A


質問 # 32
During a SUM run, you want to check if the PARCONV_UPG phase is still running propeerty. Where can you find information about thiss? Note: There are 2 correct answers to this question.

  • A. Check for running R3trans processes on the host where SUM is running
  • B. Check the running batch job via Job Overview (SM37).
  • C. Check the latest log files in the SUM directory, subdirectory abap, subdirectoryy tmp.
  • D. Check for running R3load processes on the host where SUM is running

正解:B、C


質問 # 33
Which of the following SUM activitiies require a stack XML file calculated by the mainteenance planner? Note: There are 3 correct answers to this question.

  • A. DMO without system update
  • B. Benchmark tool
  • C. Prerequisite check
  • D. SAP S/4HANA conversion without DMO
  • E. SAP S/4HANA conversion inncluding DMO

正解:C、D、E


質問 # 34
You performed a custom code checck for an SAP S/4HANA conversion.
In which transactions can you review the results? Note: There are 2 correct answers to this question.

  • A. ATC (ABAP Test Cockpit)
  • B. SYCM (Simplification Database Content)
  • C. SE80 (Object Navigator)
  • D. SAT(Runtime Analysis)

正解:A、C


質問 # 35
......

有効な問題最新版を試そうE_S4CON_2025テスト解釈E_S4CON_2025有効な試験ガイド:https://www.jpntest.com/shiken/E_S4CON_2025-mondaishu

E_S4CON_2025試験資料SAP学習ガイド:https://drive.google.com/open?id=1ANkgrEQ-uYWuyOBbyK-A6j3DtHcaQTsa

弊社を連絡する

我々は12時間以内ですべてのお問い合わせを答えます。

オンラインサポート時間:( UTC+9 ) 9:00-24:00
月曜日から土曜日まで

サポート:現在連絡