SAP C_TFIN22_67試験情報と無料練習テスト問題で合格せよ [Q72-Q94]

Share

SAP C_TFIN22_67試験情報と無料練習テスト問題で合格せよ

2022年最新のの問題C_TFIN22_67問題集で更新されたSAP試験問題集を試そう

質問 72
How can you set up segment reporting in the New GL? (Choose two)

  • A. By assigning segments in the master record of the profit center.
  • B. By assigning segments in the master record of the cost center.
  • C. By activating the scenario segment reporting in the customizing.
  • D. By defining segment master records in the application.

正解: A,C

 

質問 73
How can you set up segment reporting in the New GL? (Choose two.)

  • A. By assigning segments in the master record of the profit center.
  • B. By assigning segments in the master record of the cost center.
  • C. By activating the scenario segment reporting in the customizing.
  • D. By defining segment master records in the application.

正解: A,C

 

質問 74
A customer complains that in various FI postings both fields, cost center and internal order, are mandatory.
Which setting causes these two fields to be mandatory?

  • A. The field "actual posted cost center" has accidentally been maintained in the master of the respective internal order (tab "control data").
  • B. The field "order" has accidentally been maintained in the master of the respective cost elements (tab
    "default account assignment").
  • C. Both cost centers and internal orders have accidentally been set to "mandatory" in the "status variant" field (group "additional account assignment").
  • D. Both cost center and internal order have accidentally been maintained in the default account assignment (OKB9).

正解: C

 

質問 75
You are using drill down reporting to evaluate data in Profitability analysis and you have defined an exception for an entire column, which of the following functionality is available in the drill down report?
There are 2 correct answers to this question.
Response:

  • A. The exception can be defined on a drill-down list.
  • B. The exception is not visible if we drill down to next level.
  • C. The exception consists of two threshold values.
  • D. The exception can be applied to entire list of the report.

正解: A,C

 

質問 76
Which data do you need to set up an accrual calculation with the percentage method? (Choose two.)

  • A. Secondary cost element (category 31) as an accrual cost element
  • B. Accrual settlement rules with percentage method.
  • C. Primary cost element (category 3) as an accrual cost element
  • D. Cost center or internal order (order category 2) as a credit object
  • E. Accrual allocation cycle with sender receiver segments

正解: C,D

 

質問 77
What must be included in a bill of material in maintenance? (Choose three.)

  • A. Quantity
  • B. Object number
  • C. Account assignment
  • D. Capital consumption per time period
  • E. Unit of measure

正解: A,B,E

 

質問 78
Difference between periodic reposting and distributions are
There are 2 correct answers to this question.
Response:

  • A. The performance of periodic reposting is better distribution.
  • B. In periodic reposting no partner is updated where during distribution the system also updates the partner in the total record for the sender.
  • C. The distribution is used to transfer primary as well as secondary costs whereas periodic reposting is used to transfer primary costs.
  • D. For periodic reposting separate credit record is written in the sender cost center whereas for distributions no separate credit record is written in the sender cost center.

正解: A,B

 

質問 79
What are the prerequisites to calculate overhead costs on an internal order? (Choose two)

  • A. Assign the costing sheet in the order master data.
  • B. Define an overhead key.
  • C. Assign the costing sheet to the costing variant.
  • D. Define a costing sheet.

正解: A,D

 

質問 80
Which of the following statement correct with reference to component scrap?
Please choose the correct answer.
Response:

  • A. The system increases the quantity to be produced.
  • B. Component scrap is used in MRP to determine the input quantities of component.
  • C. The system increases the lot size.
  • D. All the above.

正解: B

 

質問 81
Which of the following SAP Life-Cycle Data Management functions provides the integration of external files into SAP ERP?

  • A. Engineering Change Management
  • B. Product Structure Browser
  • C. Document Management
  • D. Variant Configuration Management

正解: C

 

質問 82
You are using top down distribution function in CO-PA planning.
Which of the following statement is not correct?

  • A. Reference data by period or reference data aggregated across the periods.
  • B. Distribute the data from a higher planning level to lower levels.
  • C. Distributing data that has been planned at one level in CO-PA, to the additional level based on some reference data.
  • D. It can only be used for automatic planning.

正解: D

 

質問 83
In variance calculation we are using actual costs as the control costs and planned costs as
the target costs. Which target cost version we are using?
Please choose the correct answer.
Response:

  • A. Target cost version 0-total variance
  • B. Target cost version 1-production variance
  • C. Target cost version 3-production variance of the period
  • D. Target cost version 2-planning variance

正解: B

 

質問 84
Which of the following activities would occur in Phase 2?
There are 2 correct answers to this question.
Response:

  • A. Defining and documenting all business requirements, both functional and technical
  • B. Cycle and integration testing
  • C. End user training
  • D. Finalizing the project scope

正解: A,D

 

質問 85
The function of drilldown reports are divided into 3 levels, so that each user can be given a
functionality which he or she requires.
Now you have been asked to assign a user the basic functionality of drill down report &
able to send the same to other user via SAPmail.
Which version will be assigned to him? Please choose the correct answer. Response:

  • A. Report level = 0
  • B. Report level = 1
  • C. Report level = 2
  • D. Report level = 3

正解: B

 

質問 86
Many of a company's customers regularly pay less than is charged on their bills, or fail to pay their bills at all. Along with normal dunning letters, the company uses a manual, not IT-based process, to track and resolve these cases.
Which application would you recommend to improve the processing of accounts receivable and to reduce outstanding invoices?

  • A. SAP Collections and SAP Dispute Management
  • B. SAP Billing Consolidation
  • C. SAP Credit Management
  • D. SAP Cash Management

正解: A

 

質問 87
A customer considers implementing valuated project stock. Which are the benefits of the valuated project stock?

  • A. Creating an inventory will result in an inventory posting instead of a cost posting.
  • B. The valuated project stock is simple to handle because there is always only one per project.
  • C. The inventory in a project stock always shows the same valuation as in the common stock of the material.
  • D. At period-end closing; the inventory in a valuated project stock is additionally posted as work in process on the project.

正解: A

 

質問 88
How can you credit internal orders at period-end closing? (Choose two)

  • A. Use overhead surcharging.
  • B. Use periodic reposting.
  • C. Use template allocation.
  • D. Use settlement.

正解: B,D

 

質問 89
What is the prerequisite for sales order controlling?

  • A. A valuated customer order special stock must be assigned to the sales order item.
  • B. A product cost collector must be assigned to the sales order item.
  • C. The cost object of the sales order item must be created manually in the sales order.
  • D. The sales order item must have a cost object assigned by a requirement class.

正解: D

 

質問 90
Which of the following are correct descriptions of profit centers? (Choose three.)

  • A. Profit centers are usually structured in the hierarchy by region, function or product.
  • B. Profit centers are the basic organizational units of profitability analysis.
  • C. Profit centers are sub units of cost centers.
  • D. Profit centers represent an area of responsibility for cost and revenues.
  • E. Profit centers are structured in a standard hierarchy.

正解: A,D,E

 

質問 91
On what does SAP Early Watch Alert report? (Choose two.)

  • A. System configuration
  • B. Hardware failures
  • C. Performance trending
  • D. Business processes

正解: A,C

 

質問 92
What are the names of the process hierarchy levels in SAP Solution Manager?

  • A. Business Process Maps, Business Scenarios, Business Processes.
  • B. Business Scenarios, Business Processes, Activity Steps.
  • C. Business Scenarios, Business Processes, Business Process Steps.
  • D. Business Processes, Business Process Step, Activities.

正解: C

 

質問 93
The purpose of SAP Solution Manager is to smoothly integrate various SAP solutions to achieve which of the following? (Choose four)

  • A. Optimal support for operations
  • B. Faster issue resolution
  • C. Faster implementation
  • D. Faster internet access
  • E. Optimal access to support

正解: A,B,C,E

 

質問 94
......


SAP C_TFIN22_67 認定試験の出題範囲:

トピック出題範囲
トピック 1
  • 利益センタを登録し、マスタデータ割当をチェックします
  • 原価センタレポートを設定します
トピック 2
  • 通貨を定義し、勘定コード表を割り当てます
  • 原価センタ会計の使用法と計画機能のタイプを決定します
トピック 3
  • プロセスフローを設計し、FI
  • コストセンターの会計活動タイプを報告するための承認コンセプトを開発します
トピック 4
  • 利益センターの組織図を作成し、利益センター
  • 原価センタ会計を決定します
トピック 5
  • 管理会計でスコープとプロセスを定義する
  • コストセンター、コストセンター階層、およびコストセンターグループを定義、作成、構成する
トピック 6
  • 原価対象管理
  • 組織の割り当てとプロセス統合を決定および構成する
トピック 7
  • 製品原価計画
  • 原価計算バリアントおよびマルチレベル原価計算を決定および構成します
トピック 8
  • SAP ERPソリューションについて説明し、SAPERPとSolutionManagerの統合を定義します
トピック 9
  • 値フィールド、特性、および要約特性を定義し、計画を決定します

 

最新のC_TFIN22_67試験問題集でSAP試験が合格できます:https://www.jpntest.com/shiken/C_TFIN22_67-mondaishu

弊社を連絡する

我々は12時間以内ですべてのお問い合わせを答えます。

オンラインサポート時間:( UTC+9 ) 9:00-24:00
月曜日から土曜日まで

サポート:現在連絡