7003 無料問題集「Avaya Communication Server 1000 for Avaya Aura® Implementation」
A technician is upgrading an existing Option 11C 5.5 system to a Communication Server
(CS) 1000E Rls. 7x Standard Availability with a single media Gateway 1000E chassis. A
CPMG Co-Resident Server card is being deployed during the upgrade. This is a stand- alone system that is not part of a larger network so the CPMG will act as its own Primary
Server.
Which application should be deployed on the CPMG server for this customer?
(CS) 1000E Rls. 7x Standard Availability with a single media Gateway 1000E chassis. A
CPMG Co-Resident Server card is being deployed during the upgrade. This is a stand- alone system that is not part of a larger network so the CPMG will act as its own Primary
Server.
Which application should be deployed on the CPMG server for this customer?
正解:A
解答を投票する
A customer with a Communication Server (CS) 1000Rls. 6.0 SA is upgrading to Release 7.0.
They have decided to replace the existing CPPM Call server CPPM Signaling Server with a CPPM Co-Resident Call Server, Signaling Server and Gateway Controller to free up a two card slots. A technician has decided to use the ELAN IP of the Call Server from the original system as the ELAN IP address of the Co-Resident server.
Which action must be taken to consolidate the servers?
They have decided to replace the existing CPPM Call server CPPM Signaling Server with a CPPM Co-Resident Call Server, Signaling Server and Gateway Controller to free up a two card slots. A technician has decided to use the ELAN IP of the Call Server from the original system as the ELAN IP address of the Co-Resident server.
Which action must be taken to consolidate the servers?
正解:D
解答を投票する
A customer wants to build a new Ip node on their Communication Server (CS) 1000E system with three Signaling Servers. This node will support virtual trunks, IP media services, TPS and personnel directories. A technician logs into Elements manager to complete the configuration, after creating and saving the node configuration, the transfer now option chosen, then the servers are selected, the start sync is selected followed by restart application.
What is expected outcome from the system?
What is expected outcome from the system?
正解:A
解答を投票する
Click the Exhibit button.

A customer has deployed a Communication Server (CS) 1000Rls. 7x system at their site, and has asked that a swap using the Element Manager Phones tool on the two telephone sets shows in the Print-out be performed.
What should the customer be told regarding the request?

A customer has deployed a Communication Server (CS) 1000Rls. 7x system at their site, and has asked that a swap using the Element Manager Phones tool on the two telephone sets shows in the Print-out be performed.
What should the customer be told regarding the request?
正解:C
解答を投票する