次の認定試験に速く合格する!
簡単に認定試験を準備し、学び、そして合格するためにすべてが必要だ。
(A)The process simul-ation can enter into an infinite loop even if there are no logical errors in looping structures in the business process.
(B)Simul-ations can be used to examine improvements between the target business process and an existing business process.
(C)A Simul-ation Control Strategy must be provided for each simul-ation to specify the activity to proceed with, once the simul-ation ends.
(D)Simul-ations allow the business process to run without assigning participants before deploying the process.
(E)Historical data can be used to specify the activity duration of a process configured for simul-ation.
(A)User tasks in one Pageflow instance can be offered to different users.
(B)Service tasks are not allowed in Pageflow processes.
(C)All User tasks in one Pageflow instance are processed by a single user.
(D)Pageflow User tasks can be separated by Service tasks.
(A)Temporary Views can only be created for Work Item Views and Process Views.
(B)Temporary View is automatically deleted from the view list when you log out.
(C)The icons for Temporary Views are grayed out; the icons for Permanent Views are displayed in color.
(D)If a Temporary View is selected in the view list, the Save View and Save View As... Buttons are not enabled on the list of items.
(A)The URL for the WebDAV server must be configured.
(B)A deployment server must be created and configured.
(C)The login URL for the Administrator interface must be configured.
(D)The login URL for the Open space interface must be configured.
(E)The URL of the clients must be the same as the administrator.
(F)The login URL for the Workspace interface must be configured.
(A)Round-robin
(B)Statically
(C)Randomly
(D)Using expressions
(E)Dynamically
(A)It can be done by dragging a participant to a blank area of the process canvas.
(B)A participant can be used to create any type of task.
(C)Only one participant at a time can be used to create a task.
(D)It can be done using a right-click menu option in Project Explorer.
(A)To create the help file
(B)For use in the Organization Model
(C)For analysis purposes
(D)To incorporate business data in your business processes
(E)For documentation purposes
(A)Add one
(B)Add after
(C)Add before
(D)Add together
(E)Add both
(A)It is possible to highlight all tasks that contain scripts in a process.
(B)Business analysis capability is required to enter JavaScript to a Script task
(C)A script can be associated with a multi-instance task.
(D)A script can be executed on a Start Timer Event.
(A)Export the project MAA to a DAA, upload the DAA to ActiveMatrix Administrator, choose the new version, save and deploy
(B)Export the DAA to the ActiveMatrix Administrator, map the DAA to a new node, deploy the DAA
(C)Export the project as a DAA, upload the DAA to ActiveMatrix Administrator, map the DAA to BPM node, save and deploy
(D)Export the project as a DAA, upload the DAA to ActiveMatrix Administrator, choose the new version, save and deploy
我々は12時間以内ですべてのお問い合わせを答えます。
オンラインサポート時間:( UTC+9 ) 9:00-24:00月曜日から土曜日まで
サポート:現在連絡