WELL-AP 無料問題集「WELL Accredited Professional (WELL AP)」

The design team for a new office building protect is trying to achieve a point for Feature X08 Materials Optimization by selecting materials with enhanced chemical restrictions.
They are preparing a list of products to submit to the owner for approval All of the selected products are inventoried to 100 parts per million (ppm).
Which of the following products should the design team give priority to in order to achieve this point?

解説: (JPNTest メンバーにのみ表示されます)
A project satisfies requirements lot Feature V10: Self-Monitoring Part 1 if it provides eligible employees with self-monitoring tools mat are subsidized by at least

解説: (JPNTest メンバーにのみ表示されます)
According to the WELL Building Standard™, approximately what percentage of the global adult population fails to achieve activity guidelines and is considered physically inactive?

解説: (JPNTest メンバーにのみ表示されます)
Which of the following can help a real estate investor select a site with access to local mass transit to comply with the WELL Building Standard™ (WELL™)?

解説: (JPNTest メンバーにのみ表示されます)
Please click on the Project Scenario B button to review the project scenario and answer the following question.
BAY TOWERS BY BAYLEAF - SEATTLE, UNITED STATES - PROJECT SCENARIO B. Bay Towers by Bayleaf is a 20-floor commercial building overlooking Elliot Bay in Seattle, United States.
The building enjoys abundant natural light through floor to ceiling windows which take in Elliot Bay city views. Although located behind a major highway (four-lanes of traffic), there is a pedestrian bridge which connects their ground floor reception to the riverfront park on the other side of the highway.
The building is owned and operated by Bayleaf Inc., a real-estate organization. The building is leased at a 70% occupancy rate by a range of tenants, including those in finance, technology and healthcare. The total expected occupancy of the building is 1,000 people.
Bay Towers is mechanically ventilated and currently has MERV 11 filters. As the building owner, Bayleaf provides HVAC fit-out for tenant spaces, but tenants complete the interior walls and supply the finishes and furniture themselves. While no food is provided by Bayleaf, some individual tenants do have pantries where they provide their own snacks and beverages for their own employees.
Bayleaf manages the building and operates the ground floor which includes the reception, building management office, meeting rooms, as well as the elevator banks on each floor and the rooftop. Meeting rooms are common amenities that are able to be booked by the tenants. Bayleaf has two employees that work at desks onsite, a receptionist at the front desk and a property manager in the building management office.
PROJECT SCOPE & GOALS
Bayleaf has enrolled Bay Towers for WELL Core Certification to attract and retain high-quality tenants and address growing tenant demand for well-being facilities.
As part of the WELL Core Certification scope, Bayleaf intends to renovate their ground floor and are open to leveraging some of this space to include health and well-being programming.
The scope of renovation will also include upgrades to the base building, such as staircases, end-of-trip facilities and the air filtration system. The rooftop will also be converted into a public green space for tenants to use for recreation. Tables, chairs and barbeque facilities will be added, as well as several gardens, including edible plots and lawn areas.
Bayleaf is hoping their WELL Core Certification will provide some initial feature compliance for tenants wishing to also pursue WELL Certification for their spaces.
How can this project earn points from a feature in the Nourishment concept?

解説: (JPNTest メンバーにのみ表示されます)
Workplace family support includes parental leave policies that give paid paternity and maternity leave for the primary caregiver during any 12-month period for at least

解説: (JPNTest メンバーにのみ表示されます)
Which strategy should be met to support circadian rhythm in a project with a small amount of glazing?

解説: (JPNTest メンバーにのみ表示されます)
A WELL v2™ project received their performance verification test results back and found that their water exceeded the allowed threshold of microorganisms. Which strategy should the WELL AP take to help the project continue pursuing certification?

解説: (JPNTest メンバーにのみ表示されます)
A new building project is to be located near a very busy road. Which of the following strategies should the WELL AP recommend at an early stage to minimize acoustic disturbance?

解説: (JPNTest メンバーにのみ表示されます)
A client has received feedback from employees that a library space, labelled as an enclosed quiet zone, is noisy and disruptive. Which strategy should the WELL AP recommend that could contribute to earning a WELL feature?

解説: (JPNTest メンバーにのみ表示されます)