合格させるPTOEテスト問題集で[2026年02月17日]に更新された179問あります [Q60-Q83]

Share

合格させるPTOEテスト問題集で[2026年02月17日]に更新された179問あります

TPCB PTOE実際の問題と100%カバー率でリアル試験問題

質問 # 60
For a signalized intersection with a volume-to-capacity ratio of 0.95 and a cycle length of 80 seconds, what is the average control delay per vehicle per the HCM?

  • A. 55 seconds
  • B. 45 seconds
  • C. 35 seconds
  • D. 65 seconds

正解:A


質問 # 61
Which of the following is NOT considered an ITS strategy?

  • A. Electronic toll collection
  • B. Variable speed limits
  • C. GPS locating systems for transit vehicles
  • D. Service patrol vehicles

正解:D


質問 # 62
A project was awarded at a lump sum price of $2 million with 10% retainage. The construction is 95% complete and substantially complete. The amount the owner should retain is nearly:

  • A. $200,000
  • B. $0
  • C. $190,000
  • D. $100,000

正解:C


質問 # 63
What is the minimum vertical clearance for a sign installed above a sidewalk (not a secondary sign) according to the U.S. Manual on Uniform Traffic Control Devices?

  • A. 5 feet
  • B. 6 feet
  • C. 8 feet
  • D. 7 feet

正解:D


質問 # 64
What is the purpose of a clearance interval in traffic signal timing?

  • A. To provide time for vehicles to clear the intersection before conflicting movements begin
  • B. To synchronize signals at adjacent intersections
  • C. To allow pedestrians to cross the intersection
  • D. To extend the green phase for high-volume traffic

正解:A


質問 # 65
A 16-hour traffic counts, usually 6 am-10 pm normally accounts for what percentage of daily traffic on a roadway?

  • A. 90 to 95%
  • B. 50 to 60%
  • C. 60 to 75 %
  • D. 100%

正解:A


質問 # 66
Which is NOT a site specific transportation demand management program element:

  • A. Telecommuting
  • B. Growth management
  • C. Flextime
  • D. Alternative modes of transportation

正解:B


質問 # 67
A professional engineer discovers a subcontractor using substandard materials for a traffic control device installation. What is the ethical course of action per the NCEES Model Rules?

  • A. Ignore the issue if the client is satisfied
  • B. Discuss the issue only with the subcontractor
  • C. Approve the work if it meets minimum standards
  • D. Notify the client and relevant authorities

正解:D


質問 # 68
The MUTCD allows the use of fluorescent coral background for signs in what specific situation?

  • A. Incident management
  • B. Pedestrian crossings
  • C. Construction zones
  • D. School zones

正解:A


質問 # 69
By using daily and monthly expansion factors, future raw traffic count can be adjusted to estimate AADT. If the April ADT for a road is 3078 and the AADT for the road is 3419, what is the April expansion factor?

  • A. 1.11
  • B. 0.90
  • C. 1.72
  • D. 1.53

正解:A


質問 # 70
How is Time Mean Speed (TMS) defined?

  • A. The average speed of vehicles occupying a section of roadway over a specific time period
  • B. The average speed of all vehicles passing a point over a specified time period
  • C. The average headway between vehicles
  • D. The total distance traveled divided by the number of vehicles

正解:B


質問 # 71
A freeway segment with a flow rate of 2,500 vehicles per hour and a space mean speed of 55 mph has what traffic density?

  • A. 55 vehicles/mile
  • B. 45 vehicles/mile
  • C. 50 vehicles/mile
  • D. 40 vehicles/mile

正解:B


質問 # 72
According to the Model Rules, Section 240.15, Rules of Professional Conduct, licensed professional engineers are obligated to:

  • A. Express public opinions under the direction of an employer or client regardless of the knowledge of subject matter
  • B. Do whatever is necessary to secure work, including offering directly or indirectly, services or other compensation for contracts
  • C. Ensure the design documents and surveys are reviewed by a panel of licensed engineers prior to affixing a seal of approval
  • D. Practice by performing services only in the areas of their competence and in accordance with current standards of technical competence

正解:D


質問 # 73
Which of the following is NOT true about Road Safety Audits?

  • A. It is conducted by a team of independent professionals
  • B. It focuses solely on safety issues
  • C. It is a formal examination with structured process
  • D. It is limited to new or major redesign projects

正解:D


質問 # 74
Conversion of two-way streets to one-way flow can reduce which types of crashes?

  • A. Pedestrian, left-turn, and rear-end
  • B. Left-turn, lane-change, and head-on
  • C. Pedestrian, rear-end, and lane-change

正解:B


質問 # 75
Under base conditions what is generally considered to be freeway capacity?

  • A. 1,500 to 1,850 passenger cars per hour per lane
  • B. 1,900 to 2,000 passenger cars per hour per lane
  • C. 2,250 to 2,400 passenger cars per hour per lane
  • D. 1,250 to 1,500 passenger cars per hour per lane

正解:C


質問 # 76
Which of the following statements about Pedestrian Hybrid Beacons is true?

  • A. Pedestrian Hybrid Beacons shall not be installed at locations where vehicle speeds exceed 30 mph
  • B. The beacon faces shall consist of two signal sections, one with a circular red and one with a circular yellow indication
  • C. A Flashing Yellow indication shall be displayed continuously unless the pedestrian pushbutton is activated
  • D. A pedestrian signal head shall be installed at each end of the marked crosswalk

正解:D


質問 # 77
What is the present worth of a safety improvement benefit of $5,000 that will occur 5 years in the future if an interest rate of 4% is used?

  • A. $4,110
  • B. $1,000
  • C. $5,000
  • D. $7,270

正解:A


質問 # 78
A traffic engineer calculates an intersection sight distance of 750 feet for a left turn from a stop-controlled minor road onto a major road with a design speed of 55 mph. What is the AASHTO time gap used?

  • A. 7.0 seconds
  • B. 8.0 seconds
  • C. 7.5 seconds
  • D. 8.5 seconds

正解:B


質問 # 79
How is Space Mean Speed (SMS) defined?

  • A. The average distance between successive vehicles
  • B. The average speed of vehicles occupying a given section of roadway over a specific time period
  • C. The average speed of all vehicles passing a point over a specified time period
  • D. The total travel time divided by the number of vehicles

正解:B


質問 # 80
Yan, a consulting environmental engineer, discovers a garbage company employee dumping liquid into a stream, which is a violation of environmental regulation. After the yard manager dismisses her concerns, what is Yan's most appropriate next step?

  • A. Assume that since it has gone on for a long time, there is no major hazard being created and forget what she saw
  • B. Write a letter to the garbage company president outlining what she discovered and advising that the dumping practice is an environmental regulation violation
  • C. Advise the local town council of the situation at the next opportunity
  • D. Terminate her consulting with the garbage company

正解:B


質問 # 81
A two-lane rural road with an AADT of 8,000 vehicles per day experiences 12 crashes over 2 years on a 4- mile segment. What is the crash rate per 100 million vehicle miles?

  • A. 71 crashes
  • B. 61 crashes
  • C. 41 crashes
  • D. 51 crashes

正解:B


質問 # 82
A traffic study records a space mean speed of 45 mph and a density of 50 vehicles per mile. What is the flow rate?

  • A. 2,750 vehicles/hour
  • B. 2,000 vehicles/hour
  • C. 2,500 vehicles/hour
  • D. 2,250 vehicles/hour

正解:D


質問 # 83
......

TPCB PTOEリアルな2026年最新のブレーン問題集で模擬試験問題集:https://www.jpntest.com/shiken/PTOE-mondaishu

PTOE無料試験問題と解答PDF更新されたのは2026年02月:https://drive.google.com/open?id=16kA-tZlVwE-z0CZmi4SCipQO5ZIg2JaY

弊社を連絡する

我々は12時間以内ですべてのお問い合わせを答えます。

オンラインサポート時間:( UTC+9 ) 9:00-24:00
月曜日から土曜日まで

サポート:現在連絡