質問 # 57
Which of the following apply to dynamic item processor (DIP)? Note: There are 3correct answers to this question.

  • A. Sales prices are maintained in the DIP profile
  • B. Usage of cost elements is mandatory
  • C. DIP is used to create a quotation
  • D. Sources can be based on line items
  • E. Material determination is mandatory

正解:B、C、E


質問 # 58
Where do you control whether a project stock is managed as valuated or non-valuated project stock?

  • A. In the network activity
  • B. In the material master
  • C. In the WBS element
  • D. In the project definition

正解:D


質問 # 59
Materials
Your customer want to use scheduling for network to specify planned dates of task. In the SAP project system there are different set of dates that can be scheduled.
Which set of dates can be used for scheduled for network?
Note : there are 2 correct answer for this question.

  • A. Planned dates
  • B. Fundamental dates
  • C. Forecast dates
  • D. Basic dates
  • E. Baseline dates

正解:C、D


質問 # 60
You use networks and internal activities in your project. You have activated capacity requirements and notice that one work center is overloaded. You have no authorization to change the work center. How can you reduce the overload of the work center? Note: There are 2 correct Answers to this question.

  • A. Maintain subordinate internal activity elements assigned to other work centers.
  • B. Trigger automatic capacity leveling inside the project planning board.
  • C. Shift activities backward or forward on the time axis where more capacities are available.
  • D. Increase the capacities of the work center in the project planning board.

正解:B、C


質問 # 61
A customer project must be finished at a given due date. The project consists of WBS elements and networks. What scheduling type do you use?

  • A. Backward
  • B. Current date
  • C. Forward
  • D. Only capacity requirements

正解:A


質問 # 62
Your customer wants to use requirements grouping in SAP Project System. What are the prerequisites for requirements grouping of materials? Note: There are 2 correct answers to this question

  • A. The exact lot size procedure must be used
  • B. The materials must allow sales order or project stock
  • C. The procurement type of the material must be internal
  • D. An MRP group must be assigned

正解:A、C


質問 # 63
You want to determine the planned costs for an internally processed activity. Which data do you need Note: There are 2 correct answers to this question

  • A. Profit center
  • B. Work
  • C. Activity type
  • D. Duration

正解:B、D


質問 # 64
You used reductions to reduce the scheduled duration of all internally-processed activities in your project. However, the duration did not changed after overall network scheduling. What do you check? Note: There are 2 correct answers to this question

  • A. If the reduction strategy is set in the network header
  • B. If the appropriate reduction type is set in the parameters for network scheduling
  • C. If the maximum reduction level is less than 100
  • D. If the reduction strategy is set in each activity

正解:B、C


質問 # 65
You want to use subnetworks during the project. Which of the following statements describes subnetworks?

  • A. A subnetwork cannot be defined for a superior subnetwork.
  • B. The scheduling type of a subnetwork is always copied from the superior network
  • C. Subnetworks must be scheduled separately from the superior network
  • D. Maintenance orders can be defined as sub-network

正解:C


質問 # 66
You use a WBS project structure with network and maintenance order. You want to schedule both the network and the maintenance order .
What do you have to consider?

  • A. The maintenance orders must be assigned to the same plant as the network.
  • B. The maintenance orders must be assigned to WBS element.
  • C. The maintenance orders must be assigned as sub-networks.
  • D. The maintenance order s must be assigned to the same budget profile as the project definition.

正解:A


質問 # 67
You are using networks and external activities in your project. The purchase requisition has been created. What is the sequence for the following business transactions and documents?

  • A. Credit limit check -> Acceptance of performed services -> Vendor selection -> Purchase order handling
    -> Purchase order monitoring -> Goods receipt -> Invoice receipt
  • B. Vendor selection -> Purchase order creation -> Service entry sheet creation -> Service entry sheet approval
  • C. Vendor selection -> Purchase order handling -> Invoice receipt -> Purchase order monitoring -> Goods receipt
  • D. Vendor selection -> Purchase order handling -> Purchase order monitoring -> Goods receipt

正解:B


質問 # 68
Which statements describe planned and actual revenue for WBS elements? Note: There are 2 correct Answers to this question.

  • A. Planned revenue requires a sales order assigned to a WBS element.
  • B. Actual revenue is posted via a billing plan assigned to a WBS element.
  • C. Actual revenue is posted via a billing document created from a sales order
  • D. Planned revenue can be transferred from a sales quotation.

正解:C、D


質問 # 69
What are the prerequisites for delivering materials from the project? Note: There are 2 correct answers to this question

  • A. A shipping point is necessary
  • B. A sales order must be created in advance
  • C. A sold to party is necessary
  • D. A delivery document type must be configured

正解:A、D


質問 # 70
What is the reason for assigning billing plans in customer projects?

  • A. Billing plans are used for revenue planning.
  • B. Billing plans are copied automatically to the sales order item.
  • C. Billing plans enable the billing process to be carried out.
  • D. Billing plans are prerequisites for quotation creation.

正解:C


質問 # 71
What are some of the possible functions in user status profiles? Note: There are 2 correct Answers to this question.

  • A. Restrict setting user status for individual users.
  • B. Allow business processes forbidden by SAP system status.
  • C. Utilize priorities for setting the user status.
  • D. Ensure user status must always be set manually.

正解:A、C


質問 # 72
You have created an internally-processed network activity, and assigned a work center and the work. After saving, you discover that no planned costs are displayed in the cost element report for the activity. What could be the reason? Note: There are 3 correct answers to this question

  • A. The activity output price for the activity type and cost center assigned to the work center is not maintained.
  • B. The duration is missing in the activity
  • C. The Determine Costs indicator in the network header rules out planned cost calculation
  • D. Integrated planning for the network is active
  • E. The formula for costing in the work center is incorrect

正解:A、C、E


質問 # 73
What PP/DS master data is necessary for using PP/DS? Note: There are 2 correct Answers to this question.

  • A. Location
  • B. Production version
  • C. Resource
  • D. Material

正解:A、C


質問 # 74
The basic dates of subordinate WBS elements should be extrapolated without taking into account the basic dates of higher-level WBS elements. What planning method for basic dates do you use?

  • A. Bottom-up
  • B. Free planning
  • C. Strict bottom-up
  • D. Top-down

正解:A


質問 # 75
How can you grant individual authorization for WBS elements and networks?

  • A. Activate access control lists (ACL) for the user master record.
  • B. Activate access control lists (ACL) for the project profile and the network profile
  • C. Set the system status to "Lock Master Data".
  • D. Define a user status to lock the business transaction Update Project.

正解:A


質問 # 76
You have saved a network and activates with assigned material components. As soon as you release the network, you receive the error message "Business transaction cannot be carried out" What could be the reason for this error message?

  • A. Missing authorizations to release material components
  • B. Missing budget for material components
  • C. Missing material availability
  • D. Missing reservations for material components

正解:C


質問 # 77
Project structure.
You intent to work with predefined project coding mask to create project definitions. What do you have to consider?

  • A. You can use only numbers for a project coding mask definition.
  • B. You can use an indicator to determine that only coded project numbers may be used within the project system.
  • C. The standard project definition must differ from the definition of the operative project.
  • D. You can create project coding mask X... event if there are project numbers beginning with X.

正解:B


質問 # 78
......


SAP C_TS412_2021認定試験は、SAP S/4HANAプロジェクトシステムに関する知識とスキルを証明したい個人向けに設計されています。この認定は、SAPプロジェクトの管理と実装に携わるプロフェッショナルを対象としています。試験では、計画、監視、制御、報告など、プロジェクト管理に関連するさまざまなタスクを実行する能力が評価されます。


試験は、SAP S/4HANAプロジェクトシステムの実装と作業に経験があるプロフェッショナルを対象としています。SAP S/4HANAプロジェクトシステムは、プロジェクト管理と実行をサポートするSAP S/4HANAのモジュールです。このモジュールは、プロジェクトの計画、実行、監視、制御に構造化された効率的なアプローチを提供します。組織は、プロジェクトリソース、コスト、タイムライン、ワークフローを定義および管理することができます。

 

今すぐ試そう2023年最新の無料更新されたSAP C-TS412-2021試験問題と解答:https://www.jpntest.com/shiken/C-TS412-2021-mondaishu

C-TS412-2021問題集PDFとテストエンジン試験問題:https://drive.google.com/open?id=1hJOb-keelLTlfHOAacduj3ewZ-N6VwoK

弊社を連絡する

我々は12時間以内ですべてのお問い合わせを答えます。

オンラインサポート時間:( UTC+9 ) 9:00-24:00
月曜日から土曜日まで

サポート:現在連絡