質問 49
What are some of the characteristics of SAP Core Data Services (CDS) views? Note: There are 3 correct answers to this question.
- A. CDS views have ready-to-use content.
- B. CDS views are considered system modifications.
- C. CDS views support authorization.
- D. CDS views duplicate data for reporting efficiencies.
- E. CDS views have no latency.
正解: A,C,E
質問 50
Which default values can you configure for the product cost collector? Note: There are 2 correct answers to this question.
- A. Result Analysis (RA) Version
- B. Costing variant for preliminary costing
- C. Variance variant
- D. Result Analysis (RA) key
正解: B,D
質問 51
Which parameters are controlled by the costing type in a costing variant? Note: There are 2 correct answers to this question.
- A. Price updates
- B. Price for materials
- C. Costing sheet
- D. Save with date key
正解: A,D
質問 52
Which of the following statements best describe Product Cost by Period? Note: There are 2 correct answers to this question.
- A. It is used when the focus of controlling is on a stable and continuous production process.
- B. It is used when periodic costs outweigh daily postings.
- C. It is used in conjunction with a product cost collector.
- D. It is used to analyze work in process (WIP) based on actual costs.
正解: A,C
質問 53
You want to use budget availability control for your projects and internal orders. What can you check using budget availability control? Note: There are 2 correct answers to this question.
- A. The availability of funds on period level
- B. The availability of funds using overall plan value
- C. The availability of funds in object currency
- D. The availability of funds according to tolerance limits
正解: C,D
質問 54
You are setting up a direct internal activity allocation in SAP S4/HANA. What is valid receivers for the activity? Note: There are 3 correct answers to this question.
- A. General ledger account
- B. Internal order
- C. WBS element
- D. Profit center
- E. Sales order item
正解: B,C,E
質問 55
You would like to allocate primary and secondary costs from a cost center to another cost center. Which allocation method will you use?
- A. Periodic reposting
- B. Assessment
- C. Direct activity allocation
- D. Distribution
正解: B
質問 56
How can you populate local variables in Profitability Analysis reports?
- A. By Business Add-In
- B. By user exit
- C. By populating from user parameters
- D. By user entry during report execution
正解: D
質問 57
You want to determine which operations of the routing should be considered in a product cost calculation.
How do you do this? Note: There are 2 correct answers to this question.
- A. By marking the cost indicator in the control key assigned to the operation
- B. By marking the Relevance to Costing indicator in the operation
- C. By assigning a cost center to the work center in the operation
- D. By defining a usage key in the header of the routing.
正解: A,B
質問 58
Why would you use manual cost allocation in Controlling? Note: There are 2 correct answers to this question.
- A. To run simple allocations of plan data
- B. To run simple allocations of actual data
- C. To correct secondary postings
- D. To allocate costs using an allocation cycle
正解: B,C
質問 59
You are setting up costing-based Profitability Analysis for your organization. How do you configure the deferent market segments?
- A. As characteristics
- B. As divisions
- C. As value fields
- D. As key Figures
正解: A
質問 60
You want to setup integrated planning for your internal order. What do you need to do? Note: There are 2 correct answers to this question.
- A. Set the relevant indicator in the internal order master record.
- B. Set the relevant indicator in the planning profile of the order type.
- C. Set the relevant indicator in the controlling area.
- D. Set the relevant indicators in the CO version.
正解: A,D
質問 61
Which of the following statements are applicable to automatic account assignment in SAP S/4HANA? Note:
There are 2 correct answers to this question.
- A. It can be overwritten in the application.
- B. It can be defined for postings on general ledger accounts of primary costs type.
- C. It takes precedence over validation and substitution.
- D. It can be defined for postings on general ledger accounts of secondary costs type.
正解: B,C
質問 62
To which object do you assign a costing sheet?
- A. Transfer control
- B. Costing variant
- C. Valuation variant
- D. Cost component structure
正解: C
質問 63
You want to derive the profitability segment for a line item in the universal journal using SAP S/4HANA standard configuration. What requirements must be fulfilled? Note: There are 2 correct answers to this question.
- A. The type of the general ledger account must be primary cost/revenue or secondary cost.
- B. The type of the addressed ledger must be an extension ledger.
- C. Account-based Profitability Analysis must be active.
- D. Costing-based Profitability Analysis must be active.
正解: A,C
質問 64
Which setting in the cost center master data do you use to assign the same attributes to similar cost center?
- A. Cost center type
- B. Standard hierarchy node
- C. Cost center category
- D. Object class
正解: C
質問 65
You have activated budget availability control against the overall value for an internal order and entered an overall budget of 10000.
Actuals of 10000 were posted in the previous year.
You are surprised to realize that a purchase order 1000 was created for this internal order in the current year.
How is that possible?
Note: There are 2 correct answers to this question.
- A. The cost element is exempted from budget availability control.
- B. The difference of 1000 is within the tolerance limits defined in the configuration.
- C. The purchase order has NOT generated a budget yet.
- D. The purchase order was entered in a different year than the budget.
正解: A,B
質問 66
In which module do you process profit center allocations in SAP S/4HANA?
- A. Account-based profitability analysis
- B. Cost center accounting
- C. Product cost accounting
- D. General ledger accounting
正解: D
質問 67
How can you define the overhead rate in a costing sheet? Note: There are 2 correct answers to this question.
- A. As percentage rate
- B. As equivalence number
- C. As lot-based surcharge
- D. As quantity-based surcharge
正解: A,D
質問 68
How does the system derive the requirement type from the material master data? Note: There are 2 correct answers to this question.
- A. MRP group -> requirements class -> planning strategy -> requirements type
- B. MRP group -> Strategy group -> planning strategy -> requirements type
- C. Strategy group -> planning strategy -> requirements type
- D. Strategy group -> planning strategy -> requirements class -> requirements type
正解: B,C
質問 69
Which statements best describes a single cost center standard hierarchy?
- A. It is a structure to which all the cost centers within an operating concern are assigned.
- B. It is a structure to which all the cost centers within a controlling area are assigned.
- C. It is a structure to which all cost center groups create for a controlling area are assigned.
- D. It is a structure to which all cost center groups created within an operating concern are assigned.
正解: B
質問 70
How does SAP S/4HANA determine if a characteristic value is valid in Profitability Analysis?
- A. By defining the characteristic value as a value field
- B. By defining the characteristic value as a key figure
- C. By defining the characteristic value in the field catalog
- D. By defining the characteristic value in the check table
正解: D
質問 71
Which of the following statements apply to SAP S/4HANA embedded analytics? Note: There are 2 correct answers to this question.
- A. It is the core SAP S4/HANA license and users the same technical stack and user interface.
- B. It is used by dedicated BI users who need to go beyond the capabilities of Strategic Analysis Tools for reporting.
- C. It is hosted on the SAP Cloud Platform and integrate seamlessly on the SAP S4/HANA on the Fiori Launchpad.
- D. It uses core data services (CDS ) views to create virtual data models (VDMs ) for reporting.
正解: A,D
質問 72
......
C-TS4CO-2021問題集はSAP Certified Application Associate認証済み試験問題と解答:https://www.jpntest.com/shiken/C-TS4CO-2021-mondaishu