質問 12
You want to run an assessment cycle in Profitability Analysis to allocate cost center costs during period-end closing for your organization. Which of the following objects is part of the assessment cycle?
- A. Tracing factor
- B. Template
- C. Sender cost objects
- D. Cycle iteration
正解: A
質問 13
You have implemented Product Cost by Sales Oder in conjunction with cost-based POC results analysis in your organization.
For a particular sales order item, you have the following:
Plan revenue = 3000; Plan costs = 2000
Actual revenue = 1200; Actual cost=1000
What data does the system calculate during results analysis?
- A. "Revenue = 1500; Cost of sales = 1000; Revenue surplus =300"
- B. "Revenue = 1200; Cost of sales = 1000; Revenue surplus =200"
- C. "Revenue = 1200; Cost of sales = 1000; Capitalized revenue (revenue in excess of billings) = 200"
- D. "Revenue = 1500; Cost of sales = 1000; Capitalized revenue (revenue in excess of billings) = 300"
正解: D
質問 14
Which type of Profitability Analysis updates the cost of goods sold at the time of delivery?
- A. Both account-based and costing-based
- B. Periodic-accounting based
- C. Account-based only
- D. Costing-based only
正解: C
質問 15
You want to maintain a cost component structure. What can you determine for each cost component? Note:
There are 3 correct answers to this question.
- A. Relevance of cost component to goods manufactured
- B. Assignment of cost component of cost component group
- C. Assignment of cost component to calculation base for overheads in costing sheet
- D. Relevance of cost component to results analysis
- E. Relevance of cost component to inventory valuation
正解: A,B,E
質問 16
Which scenarios can be covered by one single costing run? Note: There are 2 correct answers to this question.
- A. Standard cost estimate of all the materials in all plants of a controlling area
- B. Inventory cost estimate of all the materials in one plant
- C. Current cost estimate of all the materials in all controlling area
- D. Product cost collector cost estimate in one plant
正解: B,D
質問 17
In a standard system delivery, how many free characteristics can be added to an operating concern?
- A. 0-70
- B. Over 150
- C. 101-150
- D. 71-100
正解: A
質問 18
How can you define the overhead rate in a costing sheet? Note: There are 2 correct answers to this question.
- A. As equivalence number
- B. As quantity-based surcharge
- C. As percentage rate
- D. As lot-based surcharge
正解: B,C
質問 19
You want enable WIP calculation in Product Cost by Period. What do you need to configure?
- A. Profitability Analysis (PA) transfer structure
- B. Variance variant
- C. Valuation variant
- D. Settlement profile
正解: C
質問 20
Which of the following objects can be selected in templates for activity-based costing? Note: There are 2 correct answers to this question.
- A. Internal order
- B. Cost center/activity type
- C. WBS element
- D. Business process
正解: A,C
質問 21
You want to determine which operations of the routing should be considered in a product cost calculation.
How do you do this? Note: There are 2 correct answers to this question.
- A. By defining a usage key in the header of the routing.
- B. By marking the Relevance to Costing indicator in the operation
- C. By marking the cost indicator in the control key assigned to the operation
- D. By assigning a cost center to the work center in the operation
正解: B,C
質問 22
You want to use budget availability control for your projects and internal orders. What can you check using budget availability control? Note: There are 2 correct answers to this question.
- A. The availability of funds in object currency
- B. The availability of funds on period level
- C. The availability of funds according to tolerance limits
- D. The availability of funds using overall plan value
正解: A,C
質問 23
You are setting up costing-based Profitability Analysis for your organization. How do you configure the deferent market segments?
- A. As key Figures
- B. As divisions
- C. As value fields
- D. As characteristics
正解: D
質問 24
You are considering using commitment management with internal orders. What do you need to do in the configuration?
- A. Activate commitment management only in the controlling area.
- B. Activate commitment management in both the version and the order type.
- C. Activate commitment management in both the controlling area and the order type.
- D. Activate commitment management in the controlling area, the order type, and in individual internal order master data.
正解: C
質問 25
You would like to allocate primary and secondary costs from a cost center to another cost center. Which allocation method will you use?
- A. Direct activity allocation
- B. Assessment
- C. Periodic reposting
- D. Distribution
正解: B
質問 26
Which of the following steps are part of the procedure to update the standard price of the material? Note:
There are 2 correct answers to this question.
- A. Split the costs.
- B. Mark the cost estimate.
- C. Release the cost estimate.
- D. Archive the cost estimates.
正解: B,C
質問 27
You want to derive the profitability segment for a line item in the universal journal using SAP S/4HANA standard configuration. What requirements must be fulfilled? Note: There are 2 correct answers to this question.
- A. Account-based Profitability Analysis must be active.
- B. The type of the addressed ledger must be an extension ledger.
- C. Costing-based Profitability Analysis must be active.
- D. The type of the general ledger account must be primary cost/revenue or secondary cost.
正解: A,D
質問 28
Which of the following statements best describe Product Cost by Order? Note: There are 2 correct answers to this question.
- A. It is used when full cost traceability is needed.
- B. It is used when you perform repetitive manufacturing.
- C. It is used when controlling by individual production lots or discrete quantities is needed.
- D. It is recommended for products with a long production time.
正解: A,C
質問 29
You have activated budget availability control against the overall value for an internal order and entered an overall budget of 10000.
Actuals of 10000 were posted in the previous year.
You are surprised to realize that a purchase order 1000 was created for this internal order in the current year.
How is that possible?
Note: There are 2 correct answers to this question.
- A. The difference of 1000 is within the tolerance limits defined in the configuration.
- B. The cost element is exempted from budget availability control.
- C. The purchase order has NOT generated a budget yet.
- D. The purchase order was entered in a different year than the budget.
正解: A,B
質問 30
To which object do you assign a costing sheet?
- A. Costing variant
- B. Valuation variant
- C. Cost component structure
- D. Transfer control
正解: B
質問 31
......
材料 From:
- 2022年最新の C-TS4CO-2021試験問題集で(PDFとテストエンジン)無料提供:https://www.jpntest.com/shiken/C-TS4CO-2021-mondaishu
- 2022年最新のC-TS4CO-2021のPDF試験問題集で無料提供:https://drive.google.com/open?id=1-p2jEqUVYCZ065UqYlsFSkZx87GMcYCn
無料材料を提供しております!お客様の全試験合格を助けます!