質問 # 44
You need to integrate data from SAP S/4HANA and legacy ERP to SAP IBP.What are the integration tools that you can use with such a setup for data transfer?Note: There are 2 correct answers to this question.
- A. Cloud Integration for Data Services
- B. Cloud Identity Authentication Service
- C. Real-time Integration
- D. Smart Data Integration
正解:A、D
質問 # 45
You are setting up planing with lot sizes.What are some of the properties of lot sizes that you need to be aware of?Note: There are 2 correct answers to this question.
- A. Periodic lot size setting overrides the minimum lot size.
- B. Lot sizes are applicable for production and handling quantities.
- C. Lot sizes are applicable for production and transportation quantities.
- D. Lot sizes are time-independent master data settings.
正解:B、D
質問 # 46
Using the import/export functionality means working with groups of items that are organized into collections.What is the best practice for managing collections?
- A. Configuration items should be bundled in the collections based on the SAP IBP project stream.
- B. You should delete collections after they have been transported.
- C. A planning area with the copy operators assigned must be bundled in one collection.
- D. A planning area with its time profile must be bundled in one collection.
正解:C、D
質問 # 47
You are developing the functionality and appearance of the Excel UI for SAP IBP business users.Which extensibility capabilities for SAP IBP, add-in for Microsoft Excel are provided by Custom VBA coding?Note: There are 2 correct answers to this question.
- A. Changing the entries from the Name Manager
- B. SAP IBP ribbon extension
- C. Changing the member names
- D. Changing the layout of the master data workbooks
正解:B、D
質問 # 48
What are the outputs of the Calculate Target Inventory Components Operator?Note: There are 3 correct answers to this question.
- A. Reorder Point
- B. Recommended Safety Stock
- C. Target Cycle Stock
- D. Target Pipeline Stock
- E. Component Usage
正解:B、C、D
質問 # 49
What are some of the prerequisites for configuring a planning area that results in a successful consistency check?Note: There are 2 correct answers to this question.
- A. Assign the compound master data type and its component master data types.
- B. Configure at least one calculated key figure for the planning area.
- C. Specify a planning horizon in the planning area for each level of the assigned time profile.
- D. Configure at most two input key figures on the same planning level in a key figure calculation.
正解:A、C
質問 # 50
Which constraints are taken into account by the Time-Series-Based Supply Planning Heuristic (Infinite)?Note: There are 3 correct answers to this question.
- A. Aggregated constraints
- B. Transportation lead times
- C. Maximum lot size
- D. Adjusted transport receipts
- E. Minimum lot size
正解:B、C、D
質問 # 51
Analytics charts are created by the user in the Advanced Analytics application.What can the user do in the Advanced Analytics app?Note: There are 2 correct answers to this question.
- A. Group data.
- B. Open graphics in Excel.
- C. Merge charts together.
- D. Apply filters on your data.
正解:A、D
質問 # 52
Which functional capabilities are included in SAP IBP for response and supply?Note: There are 2 correct answers to this question.
- A. Analyze Supply Usage
- B. Detailed Production Scheduling
- C. Gating Factors
- D. Planning with Product Allocations
正解:A、C
質問 # 53
You are implementing SAP IBP to plan for a supply chain that experiences high seasonality.What supply planning operators can be used in your model to plan stock pre-builds?
- A. Finite heuristics only
- B. Finite and infinite heuristics
- C. Supply optimizer and supply heuristics
- D. Supply optimizer only
正解:C
質問 # 54
Which of the following approaches could you take to reduce run times of an optimizer?Note: There are 3 correct answers to this question.
- A. Use non-overlapping networks by using subnetwork ID maintained at Location-Products to reduce the size of the problem.
- B. Split into multiple planning areas to support weekly vs. daily planning needs.
- C. Avoid using telescopic time buckets.
- D. Keep the number of fairshare segments small.
- E. Increase the use of incremental lot size beyond the frozen horizon.
正解:A、B、C
質問 # 55
Which of the following data inputs, when increased, will always cause an increase in the safety stock outputs when the Global (multi-stage) Inventory Optimization operator is run?Note: There are 2 correct answers to this question.
- A. Minimum Lot Size
- B. Target Service Level
- C. Transportation Lead Time Error CV
- D. Holding Cost Percentage
正解:A、B
質問 # 56
What function would you use to configure a year-to-date calculation?
- A. Last Period Aggregation
- B. Cumulative Aggregation
- C. Rolling Aggregation
- D. Dynamic Rolling Aggregation
正解:B
質問 # 57
You are configuring disaggregation for the KF1 key figure in the Planning Areas Model Configuration app.Which methods can you use?Note: There are 3 correct answers to this question.
- A. Disaggregation according to an equal split
- B. Proportional disaggregation by using KF2 in the expression
- C. Disaggregation according to a helper key figure
- D. Disaggregation according to a user-defined expression
- E. Disaggregation in batch triggered by an application job
正解:A、B、D
質問 # 58
How many different time levels can be selected within one planning view?
- A. All time levels available in the time profile, restricted by global configuration parameter
- B. Only base time levels of the planning area
- C. All time levels available in the time profile
- D. Only time levels from the base planning level of selected key figures
正解:C
質問 # 59
What are the possible ways that an attribute intended for use as an attribute as a key figure can be created and assigned?
- A. Created as type NVARCHAR and assigned to an external master data type
- B. Created as type INTEGER and assigned to a compound master data type
- C. Created as type INTEGER and assigned to a simple master data type
- D. Created as type DECIMAL and assigned to a compound master data type
正解:D
質問 # 60
......
認定問題集でSAP Certified Application Associate C_IBP_2208ガイド100%有効な:https://www.jpntest.com/shiken/C_IBP_2208-mondaishu
問題集であなたのC_IBP_2208 Certified Application Associate - SAP IBP for Supply Chainは100%一発でパス:https://drive.google.com/open?id=1_D7efC0tJnlugtFNlxu5-T3UHG2luewI