[2024年06月] 最新のOracle 1z0-1125-2認定練習テスト問題 [Q26-Q43]

Share

[2024年06月] 最新のOracle 1z0-1125-2認定練習テスト問題

確認済み1z0-1125-2問題集と解答で一年間無料最速更新

質問 # 26
Which Job Role is required to issue components to a work order?

  • A. Production Supervisor
  • B. Production Operator
  • C. Cost Accountant
  • D. Manufacturing Engineer

正解:B

解説:
According to the Oracle SCM Business Process Certified Foundations Associate Rel 2 document1, production operator is the job role that is required to issue components to a work order. Production operator is a person who performs the production activities on the shop floor, such as reporting material and resource transactions, reporting output and scrap, printing labels and documents, etc. Production operator can use the Issue Material task in Oracle SCM Cloud to issue components to a work order. Components are the raw materials or subassemblies that are used to produce a finished good. Issuing components means that the components are moved from the inventory location to the work order location.


質問 # 27
Which three tasks can production operators perform from the Dispatch List?

  • A. Issue Materials
  • B. Report Resource Transactions
  • C. Report Material Transactions
  • D. Print Work order traveler and product labels

正解:B、C、D

解説:
According to the Oracle SCM Business Process Certified Foundations Associate Rel 2 document1, production operators can perform three tasks from the Dispatch List: report resource transactions, print work order traveler and product labels, and report material transactions. The Dispatch List is a page in Oracle SCM Cloud that shows the list of operations that are scheduled for production in a work area. Production operators can use the Dispatch List to perform various tasks related to production execution and reporting. Report resource transactions is a task that records the usage of resources, such as labor, machine, tools, etc., for an operation. Print work order traveler and product labels is a task that prints the documents that contain information about the work order and the product, such as item, quantity, operation sequence, routing instructions, quality specifications, etc. Report material transactions is a task that records the movement of material, such as issuing, returning, transferring, adjusting material for an operation.


質問 # 28
What are the planning levels available for Min-Max planning?

  • A. Organization and Sub inventory
  • B. Organization, Sub inventory, and Locator
  • C. Organization, Sub inventory, Locator, and Item
  • D. Organization, Sub inventory, Locator, Project, and Item

正解:A

解説:
According to the Oracle Inventory Management Cloud User Guide, min-max planning is a replenishment method that maintains inventory levels between a minimum and a maximum quantity. Min-max planning can be performed at two planning levels: organization and sub inventory (A). Organization level min-max planning considers all sub inventories within an organization for replenishment. Sub inventory level min-max planning considers only one sub inventory within an organization for replenishment. Min-max planning does not support locator ©, project (B), or item (D) as planning levels.


質問 # 29
What represents a Physical, Geographical, or Logical Cluster of Work Centers?

  • A. Resources
  • B. Resource Instances
  • C. Manufacturing Calendar
  • D. Work Area

正解:D

解説:
According to the Oracle Manufacturing Cloud User Guide, a work area represents a physical, geographical, or logical cluster of work centers. A work area can contain one or more resources that perform similar operations or activities. A resource instance (A) is an individual machine, tool, person, or crew that performs an operation in a work definition. A resource (B) is a generic representation of a resource instance that defines its attributes, such as cost, availability, and capacity. A manufacturing calendar (D) is a calendar that defines the working days and hours for a plant or a work area.


質問 # 30
Which two methods does Oracle Fusion Manufacturing NOT support for reporting the progress of an order on the shop floor?

  • A. Complete with Details
  • B. Schedule Complete
  • C. Default Complete
  • D. Quick Complete

正解:B、C

解説:
According to the Oracle SCM Business Process Certified Foundations Associate Rel 2 document1, Oracle Fusion Manufacturing supports four methods for reporting the progress of an order on the shop floor: Complete with Details, Quick Complete, Express Complete, and Manual Complete. Schedule Complete and Default Complete are not supported methods. Schedule Complete is a method that reports the completion of an operation based on the scheduled start and end dates. Default Complete is a method that reports the completion of an operation based on the default quantity and duration.


質問 # 31
After OEM completes tracking a work order and the supply is available, who sends the shipping req and to whom?

  • A. OEM to CM
  • B. Production Supervisor to OEM
  • C. Production Supervisor to CM
  • D. CM to OEM

正解:A

解説:
According to the Oracle SCM Business Process Certified Foundations Associate Rel 2 document1, after OEM completes tracking a work order and the supply is available, OEM sends the shipping request to CM. The shipping request is a document that instructs the CM to ship the finished goods to the OEM or to a third-party location. The shipping request contains information such as item, quantity, destination, carrier, etc. The shipping request is created and sent by the OEM using the Create Shipping Request task in Oracle SCM Cloud.


質問 # 32
With which two supply types are non-tracking components automatically transacted? a work order?

  • A. Supplier
  • B. Push
  • C. Operation Pull
  • D. Assembly Pull

正解:C、D

解説:
According to the Oracle Manufacturing Cloud User Guide1, non-tracking components are components that do not require lot or serial control, and are not tracked in inventory. Non-tracking components are automatically transacted with two supply types: operation pull (A) and assembly pull (D). Operation pull components are transacted when an operation is completed. Assembly pull components are transacted when a work order is completed.


質問 # 33
Three correct statements with respect to Demand fulfillment view in supply plan are?

  • A. The recommendation summary graph shows the cumulative at-risk demand value and the related number of recommendations associated with that value
  • B. View prioritized at-risk demands based on order values weighted by the numberof associated recommendations
  • C. User can take actions on the demand fulfilment recommendations by accepting recommendations
  • D. Users need to define the criteria and layout in the view

正解:A、B、C

解説:
According to the Oracle Supply Planning Cloud User Guide2, demand fulfillment view in supply plan is a feature that helps users to identify and resolve at-risk demands in a supply plan. Demand fulfillment view in supply plan has three correct statements: view prioritized at-risk demands based on order values weighted by the number of associated recommendations (B), user can take actions on the demand fulfillment recommendations by accepting recommendations ©, and the recommendation summary graph shows the cumulative at-risk demand value and the related number of recommendations associated with that value (D). Users do not need to define the criteria and layout in the view (A), as they are predefined by Oracle.


質問 # 34
What is the difference between input and output costs treated as?

  • A. Transfer Cost
  • B. Scrap Cost
  • C. Variance Cost
  • D. Actual Cost

正解:C

解説:
According to the Business Process Training and Certification - Oracle University document2, variance cost is the difference between input and output costs treated as. Variance cost is calculated by subtracting the output cost from the input cost for each work order operation. Variance cost reflects the efficiency or inefficiency of the production process. It can be positive or negative depending on whether the input cost is higher or lower than the output cost.


質問 # 35
While defining Supply Plan, Planning administrator can select any of the four forecast process options, which include?

  • A. Forecast Consumption
  • B. Past Due Demands based on Supply Network Model
  • C. Past Due Demands based on Plan Option Values
  • D. Sales Order Explosion
  • E. Forecast Spreading

正解:A、C、D、E

解説:
According to the Oracle Supply Planning Cloud User Guide2, while defining a supply plan, a planning administrator can select any of the four forecast process options, which include forecast spreading (B), forecast consumption ©, sales order explosion (D), and past due demands based on plan option values (E). Forecast spreading is the option to spread forecast demand across time periods based on a predefined pattern. Forecast consumption is the option to consume forecast demand by sales orders or other sources of demand. Sales order explosion is the option to explode sales orders into their component demands based on the bill of materials. Past due demands based on plan option values is the option to include or exclude past due demands in a supply plan based on the plan option settings. Past due demands based on supply network model (A) is not a forecast process option, but rather a supply network model parameter that determines how past due demands are handled in a supply network model.


質問 # 36
Which three are Demand Planning KPIs?

  • A. Simulation Set
  • B. New product forecast
  • C. Sales vs Shipments
  • D. Shipment History
  • E. Demand Planning Exceptions

正解:B、C、D

解説:
According to the Oracle Demand Management Cloud User Guide2, demand planning KPIs are metrics that measure the performance and accuracy of demand planning processes. Demand planning KPIs include sales vs shipments (B), new product forecast (D), and shipment history (E). Sales vs shipments compares the actual sales orders with the forecasted shipments. New product forecast measures the forecast accuracy of new products that have no historical data. Shipment history shows the historical shipment data by product, customer, or channel. Demand planning exceptions (A) and simulation set © are not demand planning KPIs, but rather features that help users to identify and resolve issues or compare scenarios in demand planning.


質問 # 37
Which three forecasting profiles are pre-seeded in the system?

  • A. Forecast Consumption
  • B. Forecast Shipments
  • C. Promotional Forecast
  • D. Forecast sales
  • E. Forecast Bookings

正解:A、B、E

解説:
According to the Oracle Demand Management Cloud User Guide2, forecasting profiles are settings that define how forecasts are generated and displayed in demand plans. Forecasting profiles include forecast consumption ©, forecast bookings (D), and forecast shipments (E). Forecast consumption defines how forecast demand is reduced by sales orders or other sources of demand. Forecast bookings defines how bookings data is collected and displayed in demand plans. Forecast shipments defines how shipments data is collected and displayed in demand plans. Forecast sales (A) and promotional forecast (B) are not forecasting profiles that are pre-seeded in the system, but rather types of demand information that can be included in demand plans.


質問 # 38
Which is not a part of supplies of reservation?

  • A. Transfer Order
  • B. Sales Order
  • C. Purchase Order
  • D. Work Order

正解:B

解説:
According to the Oracle Inventory Management Cloud User Guide, a reservation is a link between a supply source and a demand source. A supply source can be a purchase order (B), a transfer order ©, or a work order (D). A demand source can be a sales order line, an internal material transfer, or a work order component requirement. A sales order (A) is not a part of supplies of reservation, but rather a part of demands of reservation.


質問 # 39
What information should users set up in order to use the financial review summary? properly?

  • A. Item cost and price for each item is calculated in the application
  • B. Item cost only
  • C. Both item cost and price list
  • D. Price list only

正解:C

解説:
According to the Business Process Training and Certification - Oracle University document2, users should set up both item cost and price list in order to use the financial review summary properly. The financial review summary is a dashboard that shows the key financial metrics and indicators of a supply plan, such as revenue, gross margin, cost comparison, plan versus forecast, unmet revenue, etc. The financial review summary requires both item cost and price list to calculate the revenue and cost of the supply plan. Item cost is the amount of money that is spent to produce or procure an item. Price list is the amount of money that is charged to sell an item.


質問 # 40
What is the input required to reserve the components against a work order?

  • A. Item Structure of the Finished Product
  • B. Plant Parameters
  • C. Routing Information of the Finished Product
  • D. Manufacturing Master Data

正解:A

解説:
According to the Oracle Inventory Management Cloud User Guide, reserving components against a work order is the process of allocating materials from inventory to production based on availability and priority. Reserving components against a work order requires the item structure of the finished product © as an input, which defines the components and their quantities that are needed to produce an item. Routing information of the finished product (A), manufacturing master data (B), and plant parameters (D) are not inputs required to reserve components against a work order, but rather inputs required for other processes such as work definition creation, contract manufacturing setup, or plant configuration.


質問 # 41
Which of the three statements are true While planning, the administrator defining the supply plan has the option to setup items included in the supply chain.

  • A. Production Plan to include items that are MPS Planned items
  • B. Production Plan to include both items that are MPS and MRP Planned items
  • C. Manufacturing Plan to include items that are MRP Planned items
  • D. Manufacturing Plan to include both items that are MPS and MRP Planned items

正解:A、B、C

解説:
According to the Business Process Training and Certification - Oracle University document2, while planning, the administrator defining the supply plan has the option to setup items included in the supply chain. There are three types of statements that are true in this context:
Production Plan to include items that are MPS Planned items
Production Plan to include both items that are MPS and MRP Planned items Manufacturing Plan to include items that are MRP Planned items MPS (Master Production Schedule) is a plan that specifies the quantity and timing of finished goods to be produced. MRP (Material Requirements Planning) is a plan that calculates the quantity and timing of raw materials and components needed to produce the finished goods. A Production Plan is a type of supply plan that focuses on the production of finished goods. A Manufacturing Plan is a type of supply plan that covers both the production of finished goods and the procurement of raw materials and components.


質問 # 42
Which three pieces of demand information can be included as demand in an Oracle supply plan?

  • A. Production Plan
  • B. Build Plan
  • C. Demand Forecast
  • D. Manual Forecast

正解:A、C、D

解説:
According to the Oracle Supply Planning Cloud User Guide1, there are four types of demand information that can be included as demand in an Oracle supply plan: production plan (A), manual forecast ©, demand forecast (D), and sales orders. A production plan is a high-level plan that specifies the quantity and timing of finished goods to be produced. A manual forecast is a user-defined forecast that can be entered or imported into a supply plan. A demand forecast is a statistical forecast that is generated by Oracle Demand Management Cloud or another forecasting system. Sales orders are confirmed orders from customers that have been entered into Oracle Order Management Cloud or another order management system. A build plan (B) is not a type of demand information that can be included as demand in an Oracle supply plan, but rather an output of a supply plan that specifies the quantity and timing of production orders to be executed.


質問 # 43
......

最新の2024年最新の実際に出ると確認された1z0-1125-2問題集で100%無料1z0-1125-2試験問題集:https://www.jpntest.com/shiken/1z0-1125-2-mondaishu

無料提供中2024年最新の無料更新されたOracle 1z0-1125-2試験問題と解答:https://drive.google.com/open?id=1_9G9rKuw4X_dMEfPPI5WnIH69vO7GEwi

弊社を連絡する

我々は12時間以内ですべてのお問い合わせを答えます。

オンラインサポート時間:( UTC+9 ) 9:00-24:00
月曜日から土曜日まで

サポート:現在連絡