[2025年03月14日] 手に入れよう!最新C-S43-2023認定された有効な試験問題集解答 [Q16-Q31]

Share

[2025年03月14日] 手に入れよう!最新C-S43-2023認定された有効な試験問題集解答

100%合格率保証付きの素晴らしいC-S43-2023試験問題PDF

質問 # 16
Which component is used to display data in the Technical Object Breakdowns and Technical Object Damages app?

  • A. SAP S/4HANA Core Data Services
  • B. SAP Asset Strategy and Performance Management
  • C. SAP Predictive Analysis
  • D. SAP Lumira Designer

正解:A

解説:
Maintenance Processing - Basic Functions


質問 # 17
Which of the following API types does SAP recommend to use to achieve clean core integrations? Note:
There are 2 correct answers to this question.

  • A. IDoc
  • B. OData
  • C. SOAP
  • D. RFC

正解:B、C

解説:
Managing Clean Core


質問 # 18
You cancel the technical completion of a work order. What are the effects? Note: There are 2 correct answers to this question?

  • A. Open purchase requisitions are recompiled
  • B. Open purchase orders are recompiled.
  • C. Referenced notifications are put in Process again.
  • D. Open reservations are recompiled.

正解:A、D


質問 # 19
You want to set up a general maintenance task list for inspection rounds using the overall time confirmation as a simplified way to record measurement documents. What do you need to do? Note: There are 2 correct answers to this question

  • A. Assign a piece of equipment with an allocated measuring point to a task list operation
  • B. Assign a measuring point as a production resources/tools (PRT) to a task list operation.
  • C. Assign an inspection lot to the task list header
  • D. Assign an inspection document as a PRT to the task list operation.

正解:A、B

解説:
To set up a general maintenance task list for inspection rounds using the overall time confirmation as a simplified way to record measurement documents, you need to do the following steps:
* Assign a piece of equipment with an allocated measuring point to a task list operation. This will allow you to inspect the equipment and record the measurement readings for the measuring point during the inspection round. You can assign the equipment either manually or automatically using the object list in the task list header1.
* Assign a measuring point as a production resources/tools (PRT) to a task list operation. This will allow you to inspect the measuring point and record the measurement readings for it during the inspection round. You can assign the measuring point either manually or automatically using the PRT category
0010 (Measuring Point) in the task list operation1.
* You do not need to assign an inspection lot to the task list header, as this is not required for inspection rounds. Inspection lots are used for quality inspections that are triggered by events such as goods receipt, production order, or sales order2.
* You do not need to assign an inspection document as a PRT to the task list operation, as this is not supported for inspection rounds. Inspection documents are used for quality inspections that are based on inspection plans and inspection characteristics2. References: PM - General maintenance task list and Set up your SAP S/4HANA system for EAM Inspection Checklists in SAP Help Portal.


質問 # 20
Which steps are available for the maintenance technician when using the Report Malfunction tile?
Note: There are 3 correct answers to this question.

  • A. Select and print the maintenance order shop papers
  • B. View details of the technical object by navigating to the Asset Viewer
  • C. Add a URL to provide further information
  • D. Display the current location of the technical object
  • E. Input estimated costs for repair malfunction

正解:B、C、D

解説:
Maintenance Processing - Basic Functions


質問 # 21
Which of the below objects can you assign in a notification item? Note: There are 2 correct answers to this question

  • A. One or more object parts
  • B. One or more causes of damage.
  • C. Only one object part
  • D. Only one cause of damage

正解:A、B

解説:
A notification item is used to describe a problem, damage, or the activity executed in greater detail. A notification item can be assigned to one or more object parts and one or more causes of damage. An object part is a component of a technical object that is affected by a malfunction or damage. A cause of damage is a factor that leads to a malfunction or damage. You can use catalogs to enter object parts and causes of damage in a coded form. Therefore, the correct answers are B and D.
References:
* SAP Help Portal - Notification Item
* SAP Help Portal - Object Part
* SAP Help Portal - Cause of Damage
* [SAP Learning - Creating Notifications]


質問 # 22
Which parameter in a maintenance strategy do you use to set the start/end date of the maintenance order?

  • A. Initial/subsequent buffer
  • B. Scheduling type
  • C. Package offset
  • D. Call horizon

正解:A


質問 # 23
How do you set up the visible tiles for a specific user in SAP Fiori launchpad? Note: There are 2 correct answers to this question.

  • A. By assigning a portal role with an SAP Fiori catalog
  • B. By assigning a PFCG role with an SAP Fiori catalog
  • C. By assigning the tiles directly
  • D. By assigning a PFCG role with an SAP Fiori tile group

正解:B、D

解説:
User Interface and Mobile Maintenance


質問 # 24
What are characteristics of the structure indicator?
Note: There are 2 correct answers to this question.

  • A. It restricts the number of hierarchical levels to no more than 6.
  • B. It sets the hierarchy levels of the functional location structure.
  • C. It limits the types of characters in the edit mask to Alpha and Numeric.
  • D. It defines the allowed characters for a functional location.

正解:B、C


質問 # 25
You want to schedule a performance-based maintenance plan.
Which parameters are mandatory?
Note: There are 2 correct answers to this question.

  • A. Estimated annual performance
  • B. Counter overflow reading
  • C. Scheduling period
  • D. Start counter reading

正解:A、D

解説:
Preventive Maintenance


質問 # 26
Which features can the planner use in a multiple-counter plan? Note: There are 2 correct answers to this question.

  • A. Maintenance Strategy
  • B. Cycles with different dimensions
  • C. Change Repeat Factor
  • D. Multiple time-based cycles

正解:B

解説:
Preventive Maintenance


質問 # 27
The maintenance technician wants to document work steps for a technical object in a notification. What are the best options to be used in regard to code-based reporting? Note: There are 2 correct answers to this question?

  • A. A text in the subject long text screen
  • B. An activity in the notification header
  • C. A task in the notification item
  • D. An entry in the object list

正解:B、C


質問 # 28
Which of the following is a prerequisite for external refurbishment?

  • A. Assign an external work center to a maintenance order operation.
  • B. Select the material group for externally refurbished materials.
  • C. Activate the subcontracting indicator in an external activity.
  • D. Define the order type for external refurbishment.

正解:C

解説:
Maintenance Processing - Advanced Functions


質問 # 29
What are valid item categories for a BOM used in Asset Management? Note: There are 3 correct answers to this question.

  • A. L (Stock item)
  • B. D (Document item)
  • C. F (Functional location)
  • D. I (PM Structure element)
  • E. E (Equipment)

正解:A、B、D

解説:
Technical Objects


質問 # 30
In which maintenance object can you use an activity type? Note: There are 2 correct answers to this question.

  • A. Maintenance order header
  • B. Work center
  • C. Notification activity
  • D. Maintenance order operation

正解:A、D

解説:
Maintenance activity type is a key for the type of maintenance activity provided, such as repairs, shutdowns, regular activities, inspections, and so on. It is used to classify data according to the type of maintenance activity in cost evaluations, for example, total costs or number of orders for each technical object1.
Maintenance activity type can be used in the maintenance order header and the maintenance order operation.
In the maintenance order header, it is used to specify the overall type of maintenance activity for the order. In the maintenance order operation, it is used to specify the type of maintenance activity for each operation within the order. The maintenance activity type in the operation can be different from the one in the header2.
Maintenance activity type cannot be used in the notification activity or the work center. Notification activity is a key for the type of activity performed in response to a notification, such as inspection, repair, or preventive maintenance. It is not related to the maintenance activity type. Work center is a key for the location where an operation is performed, such as a workshop, a laboratory, or a machine. It is also not related to the maintenance activity type.
References: 1: maintenance activity type (PM) (SAP Library - Glossary) 2: maintenance activity type in SAP
- Everything you need to know : notification activity (PM) (SAP Library - Glossary) : work center (SAP Library - Glossary)


質問 # 31
......


SAP C-S43-2023 認定試験の出題範囲:

トピック出題範囲
トピック 1
  • 予防保守: このセクションでは、タスク リスト、単一サイクル保守、時間ベースの計画、パフォーマンス ベースの保守戦略などの戦略を網羅した予防保守の専門家のスキルをテストします。予防保守のスケジュールと計画を設計および管理します。
トピック 2
  • ユーザー インターフェースとユーザー エクスペリエンス: このセクションでは、SAP S
  • 4HANA Asset Management で使用される UI テクノロジーとクライアント タイプに関する知識を評価します。受験者は、さまざまなユーザー インターフェース テクノロジーと、そのモバイル メンテナンス シナリオへの適用について説明することが求められます。
トピック 3
  • 組織単位とマスター データ: このセクションでは、重要な組織単位の説明と実装、特に一般的な物流および会計システムへの統合に焦点を当てます。候補者は、組織構造とマスター データを全体的なビジネス プロセスと管理および調整するスキルを実証する必要があります。

 

無料C-S43-2023別格な問題集をダウンロード:https://www.jpntest.com/shiken/C-S43-2023-mondaishu

C-S43-2023問題集で2025年最新のSAP試験問題:https://drive.google.com/open?id=1rQowvtsvjCHrhq2iNzl-_-1Xo-MplWUR

弊社を連絡する

我々は12時間以内ですべてのお問い合わせを答えます。

オンラインサポート時間:( UTC+9 ) 9:00-24:00
月曜日から土曜日まで

サポート:現在連絡