[2025年04月08日] 合格AVIXA Certification CTS-D試験問題集には193問があります
究極ガイドの無料準備AVIXA CTS-D試験問題と解答
質問 # 35
To "train the trainer" is to __________.
Response:
- A. Host classes at the designer's office
- B. Learn the AV system so you can train the client
- C. Train the client on aspects of the user interf
- D. Train individuals at the client location who can train other users
正解:D
質問 # 36
What type of drawing would you use to find out exactly how the projector should be mounted to the ceiling?
Response:
- A. Section drawing
- B. Detail drawing
- C. Mechanical drawing
- D. Reflected ceiling plan
正解:B
質問 # 37
Which of the following statements apply to unicast streaming?
Response:
- A. It consumes more bandwidth the more people who need to view the stream.
- B. It uses group-management protocols to control streaming channels.
- C. It requires special routers called rendezvous points.
- D. It uses special IP addresses assigned by the Internet Assigned Numbers Authority.
正解:A
質問 # 38
When lighting a room for videoconferencing, the Illuminating Engineering Society recommends that fluorescent light sources have a correlated color temperature of __________.
Response:
- A. 4000 to 4500 K
- B. 3000 to 3500 K
- C. 2000 to 2500 K
- D. 5000 to 5500 K
正解:B
質問 # 39
The main considerations when selecting a cable shield are:
Response:
- A. Impedance, flexibility, and materials
- B. Materials, permeability, and conductors
- C. Cable types, gauge, and interference
- D. Coverage, flexibility, and frequency range
正解:D
質問 # 40
PAG and NAG are important calculations for ensuring an audio system is:
Response:
- A. Stable
- B. Intelligible
- C. Loud enough
- D. All of the above
正解:A
質問 # 41
In which phase does a project manager need to work with allied trades to create proper workspaces?
Response:
- A. Installation phase
- B. Training phase
- C. Maintenance phase
- D. Design phase
正解:D
質問 # 42
Which of the following documents need to be most rigidly adhered to when working on a system design?
Response:
- A. Manufacturer implementation guides
- B. National and international standards
- C. Project contract documents
- D. Regulatory requirements
正解:D
質問 # 43
Using the diagram below, how would the AV designer confirm room dimensions?
Response:
- A. Measure from the 16" studs located in the wall blue print
- B. Look at lighting fixtures and calculate by surface area
- C. Use the scale to measure and convert to feet and meters
- D. Calculate using a measured door width
正解:C
質問 # 44
How does one define project responsibilities and identify AV technology requirements?
Response:
- A. Follow guidelines determined by state and local building codes
- B. Consult with the owner as the project progresses
- C. Follow the project directory & program report
- D. The project manager will outline the responsibilities in the RFP
正解:C
質問 # 45
An AV conduit riser diagram will show information such as:
Response:
- A. Electrical breaker boxes
- B. Electrical light wiring
- C. Junction and pull boxes
- D. Plumbing routes
正解:C
質問 # 46
What type of design information is found on TELCO/DATA (IT) coordination drawings?
Response:
- A. Locations of conduit runs, mixers, signal compressors
- B. Drains, water lines, intake valves, security system
- C. Breaker boxes, lighting, signal runs
- D. Locations of server, phone and Ethernet lines, WiFi access points
正解:D
質問 # 47
A conference room requires video conferencing and AV presentation capabilities. Which of the following design elements are defined by the architectural dimensions and orientation of the room?
Response:
- A. Display size
- B. Display brightness
- C. Display aspect ratio
- D. Display type
正解:A
質問 # 48
During the design phase of a project that has many network-enabled AV devices. What will the IT team need from the AV designer?
Response:
- A. Device bandwidth requirements
- B. Device serial numbers
- C. Device list of non-networked AV equipment
- D. Device operating systems
正解:A
質問 # 49
The final AV drawing package should contain detail drawings and diagrams of:
Response:
- A. Ceiling tile format and composition, ceiling suspension layout
- B. Connections, plate & panels, patch panels and control panels, equipment
- C. Patch panel layout, cable pathways, and commissioning report
- D. Manufacturer specifications, ceiling and infrastructure, concrete footer
正解:B
質問 # 50
......
Certified Technology Specialist - Design練習テスト2025年最新のストレスなしでCTS-D合格!:https://drive.google.com/open?id=1EC5zJmuMsu4RSvunfqRrCGlmpq-THn9c
合格させるCTS-DテストエンジンとPDFで完全版無料問題集:https://www.jpntest.com/shiken/CTS-D-mondaishu