[2025年04月08日] 合格AVIXA Certification CTS-D試験問題集には193問があります [Q35-Q50]

Share

[2025年04月08日] 合格AVIXA Certification CTS-D試験問題集には193問があります

究極ガイドの無料準備AVIXA CTS-D試験問題と解答

質問 # 35
To "train the trainer" is to __________.
Response:

  • A. Host classes at the designer's office
  • B. Learn the AV system so you can train the client
  • C. Train the client on aspects of the user interf
  • D. Train individuals at the client location who can train other users

正解:D


質問 # 36
What type of drawing would you use to find out exactly how the projector should be mounted to the ceiling?
Response:

  • A. Section drawing
  • B. Detail drawing
  • C. Mechanical drawing
  • D. Reflected ceiling plan

正解:B


質問 # 37
Which of the following statements apply to unicast streaming?
Response:

  • A. It consumes more bandwidth the more people who need to view the stream.
  • B. It uses group-management protocols to control streaming channels.
  • C. It requires special routers called rendezvous points.
  • D. It uses special IP addresses assigned by the Internet Assigned Numbers Authority.

正解:A


質問 # 38
When lighting a room for videoconferencing, the Illuminating Engineering Society recommends that fluorescent light sources have a correlated color temperature of __________.
Response:

  • A. 4000 to 4500 K
  • B. 3000 to 3500 K
  • C. 2000 to 2500 K
  • D. 5000 to 5500 K

正解:B


質問 # 39
The main considerations when selecting a cable shield are:
Response:

  • A. Impedance, flexibility, and materials
  • B. Materials, permeability, and conductors
  • C. Cable types, gauge, and interference
  • D. Coverage, flexibility, and frequency range

正解:D


質問 # 40
PAG and NAG are important calculations for ensuring an audio system is:
Response:

  • A. Stable
  • B. Intelligible
  • C. Loud enough
  • D. All of the above

正解:A


質問 # 41
In which phase does a project manager need to work with allied trades to create proper workspaces?
Response:

  • A. Installation phase
  • B. Training phase
  • C. Maintenance phase
  • D. Design phase

正解:D


質問 # 42
Which of the following documents need to be most rigidly adhered to when working on a system design?
Response:

  • A. Manufacturer implementation guides
  • B. National and international standards
  • C. Project contract documents
  • D. Regulatory requirements

正解:D


質問 # 43
Using the diagram below, how would the AV designer confirm room dimensions?

Response:

  • A. Measure from the 16" studs located in the wall blue print
  • B. Look at lighting fixtures and calculate by surface area
  • C. Use the scale to measure and convert to feet and meters
  • D. Calculate using a measured door width

正解:C


質問 # 44
How does one define project responsibilities and identify AV technology requirements?
Response:

  • A. Follow guidelines determined by state and local building codes
  • B. Consult with the owner as the project progresses
  • C. Follow the project directory & program report
  • D. The project manager will outline the responsibilities in the RFP

正解:C


質問 # 45
An AV conduit riser diagram will show information such as:
Response:

  • A. Electrical breaker boxes
  • B. Electrical light wiring
  • C. Junction and pull boxes
  • D. Plumbing routes

正解:C


質問 # 46
What type of design information is found on TELCO/DATA (IT) coordination drawings?
Response:

  • A. Locations of conduit runs, mixers, signal compressors
  • B. Drains, water lines, intake valves, security system
  • C. Breaker boxes, lighting, signal runs
  • D. Locations of server, phone and Ethernet lines, WiFi access points

正解:D


質問 # 47
A conference room requires video conferencing and AV presentation capabilities. Which of the following design elements are defined by the architectural dimensions and orientation of the room?
Response:

  • A. Display size
  • B. Display brightness
  • C. Display aspect ratio
  • D. Display type

正解:A


質問 # 48
During the design phase of a project that has many network-enabled AV devices. What will the IT team need from the AV designer?
Response:

  • A. Device bandwidth requirements
  • B. Device serial numbers
  • C. Device list of non-networked AV equipment
  • D. Device operating systems

正解:A


質問 # 49
The final AV drawing package should contain detail drawings and diagrams of:
Response:

  • A. Ceiling tile format and composition, ceiling suspension layout
  • B. Connections, plate & panels, patch panels and control panels, equipment
  • C. Patch panel layout, cable pathways, and commissioning report
  • D. Manufacturer specifications, ceiling and infrastructure, concrete footer

正解:B


質問 # 50
......

Certified Technology Specialist - Design練習テスト2025年最新のストレスなしでCTS-D合格!:https://drive.google.com/open?id=1EC5zJmuMsu4RSvunfqRrCGlmpq-THn9c

合格させるCTS-DテストエンジンとPDFで完全版無料問題集:https://www.jpntest.com/shiken/CTS-D-mondaishu

弊社を連絡する

我々は12時間以内ですべてのお問い合わせを答えます。

オンラインサポート時間:( UTC+9 ) 9:00-24:00
月曜日から土曜日まで

サポート:現在連絡