合格させるSAP Certified Application Associate C_IBP_2311テスト問題集で[2025年03月03日] 更新された80問あります [Q11-Q33]

Share

合格させるSAP Certified Application Associate C_IBP_2311テスト問題集で[2025年03月03日] 更新された80問あります

SAP C_IBP_2311実際の問題と100%カバー率でリアル試験問題

質問 # 11
What are some of the features of the network charts in SAP Integrated Business Planning for Supply Chain? Note: There are 2 correct answers to this question

  • A. You can create a network chart from the dedicated app, or use the Manage Analytic Stories app
  • B. The network charts visualize relationships between warehouse, plants, customer, and supplier, for finished goods
  • C. You can create a network chart from the dedicated app, or use the Analytic Advanced app
  • D. To display the network chart, you need the Ship-From Location master data type in the planning area

正解:B、C


質問 # 12
You need to integrate data from SAP S/4HANA and legacy ERP to SAP IBP. What are the integration toolsthat you can use with such a setup for data transfer? Note: There are 2 correct answers to this question.

  • A. SAP Smart data Integration
  • B. Real-time Integration
  • C. SAP Cloud Integration for data services
  • D. Core Interface

正解:A、C


質問 # 13
What is taken as an input for the demand sensing process? Note: There are 2 correct answers to this question.

  • A. Results of time series analysis
  • B. Open Sales Order
  • C. Consensus Demand
  • D. Forecast Accuracy measures

正解:B、C


質問 # 14
Which Master Data Types are used in time-series-based planning within SAP IBP for response and supply? Note: There are 3 correct answers to this question

  • A. Transportation lane
  • B. DS Order fulfilment
  • C. Product
  • D. Customer
  • E. Location

正解:C、D、E


質問 # 15
Which of the following conditions are relevant for subtotals in the planning view?Note: There are 2 correct answers to this question.

  • A. The Total number of the attribute that can use subtotal in the planning view can be restricted
  • B. Only attribute-based totals can be added to the planning view.
  • C. The total value can be added before or after the selected attribute
  • D. The values of the attribute-based total at the highest attribute level in the planning level can be - changed

正解:A、C


質問 # 16
You want to display and edit data in different Units of Measure (UOM). Which of the following must you consider before you use the UOM? Note: There are 3 correct answers to this question.

  • A. Units of measure are usually not time-dependent
  • B. Units of measure are usually not time-independent.
  • C. Units of measure is an attributes of master data type, such as product
  • D. Conversion to the target unit of measure is handled by the SAP IBP Excel add-in.
  • E. Analytics allow the user to select the target unit of measure

正解:A、C、E


質問 # 17
Which type of master data represents the Master Data Type Component?

  • A. Compound Master Data Type
  • B. External Master Data Type
  • C. Virtual mater data type
  • D. Reference Master data type

正解:D


質問 # 18
You set up time-series integration using SAP Cloud Integration for data services. During the integration process of master data, an error occurred. In the Data Integration app the job failed with the status "Fatal Error" How can you find more details about the error?

  • A. Download the Rejection Report in the Data Integration app
  • B. Download the initial Problem report in the Data Integration app
  • C. Navigate to the Manage Master Data app and open the Log
  • D. Navigate to the Master Data Workbook in Excel and open the Log.

正解:B


質問 # 19
What is a prerequisite for modelling outsourced manufacturers with production capacity using the Supply Optimizer?

  • A. Model target inventory and stocks at the outsourced manufacturing location
  • B. Model relative production costs across internal locations and outsourced manufacturing locations
  • C. Use production lead times and offsets to manage components at the outsourced manufacturing location
  • D. Ensure that the outsourced manufacturing locations have a separate subnetwork

正解:B


質問 # 20
Which of the following are features of lag-based snapshots? Note: There are 2 correct answers to this question

  • A. Lag-based snapshots are created in the Configuration app for a fixed time range.
  • B. The number of lag-based snapshots are limited to nine levels.
  • C. Target key figure for these snapshots must have lag as root attribute in the base planning leve
  • D. Target key figure for these snapshots are expressed to the user in planning view

正解:C、D


質問 # 21
You are evaluating criteria for choosing the solver to support planning for a complex supply What are some of the points that should be reviewed? Note: There are 2 correct answers to this question.

  • A. Planning results can be generated faster by the optimizer.
  • B. Prioritization of demand elements one by one is achieved by unconstrained heuristics
  • C. Finite heuristics works with demand prioritization
  • D. Push and Pull production models are used by the optimizer

正解:C、D


質問 # 22
What are possible approaches to modeling a customer demand in time-series-based optimization with SAP IBP for response and supply? Note: There are 2 correct answers to this question.

  • A. Ensure product prioritization with the combination of customer and product
  • B. Try to go as granular as possible with the customer product
  • C. Assign a high cost value (1 million or more ) for non-delivery to priority customers
  • D. Ensure discounting does not result in negative costs for each customer-product combination.

正解:A、D


質問 # 23
What are the possible ways that an attribute intended for use as an attribute as a key figure can be created and assigned? Note: There are 2 correct answers to this question.

  • A. Created as type DECIMAL and assigned to an compound master data type
  • B. Created as type INTEGER and assigned to an compound master data type
  • C. Created as type INTEGER and assigned to a simple master data type
  • D. Created as type DECIMAL and assigned to an external master data type

正解:A、C


質問 # 24
What does ABC/XYZ segmentation allow you to do? Note: There are 2 correct answers to this question

  • A. Identify inventory items that quire closer attentions
  • B. Substitute missing values in case of sporadic demands.
  • C. Use forecasting algorithms that are specific to seasonal demands of SKUs in the segment "B"
  • D. Choose time-independent key figures as segmentation measures

正解:A、D


質問 # 25
What are some of the capabilities of the Planner Workspaces app? Note: There are 2 correct answers to this question.

  • A. It supports embedding analytic stories as a workspace component
  • B. It supports simulating the effect of the changes
  • C. It supports favourites created in SAP IBP, add-in for Microsoft Excel
  • D. It supports sharing with other users or user groups.

正解:A、C


質問 # 26
Which Supply Planning processes are part of the tactical Planning level within a Planning Hierarchy? Note:
There are 2 correct answers to this question.

  • A. Balancing Supply and Demand
  • B. Stock Replenishment
  • C. Inventory Build and Reduction
  • D. Order Prioritization

正解:A、C


質問 # 27
You want to maintain key figure values for a new attribute and value combination, using SAP IBP, add-infor Microsoft Excel, and you are receiving an error related to missing combinations. How can you resolve this problem? Note: There are 2 correct answers to this question

  • A. Use the Manage the master data app to create missing combinations
  • B. Use the function New Planning Object in Excel UI to create missing combination
  • C. Use the Copy Operator to create the missing combinations
  • D. Use the Data Integration app to upload the missing combinations

正解:B、D


質問 # 28
Which SAP IBP planning operator can be run to delete planning objects in a certain version?

  • A. Purge Non-Confirming Data
  • B. Purge Key Figure Data
  • C. Purge Key Figure Data Outside Planning Area Planning Horizon
  • D. Purge Master Data

正解:B


質問 # 29
You configured a stored key figure with an editability setting of "not editable" How can users modify the values of that key figure? Note: There are 2 correct answers to this question

  • A. Using planning object maintenance with key figure data in Excel UI
  • B. Importing the key figure data files using the Web UI
  • C. Managing the master data via the web UI
  • D. Using the key figure calculations in the Web UI

正解:A、B


質問 # 30
You create a planning filter using an SAP IBP Fiori app. Which of the following objects can it be appliedto? Note: There are 2 correct answers to this question.

  • A. Planning view template in the SAP IBP, add-in for Microsoft Excel
  • B. Jobs in the Application jobs app
  • C. Compare function in the Planning Areas app
  • D. Supply chain graph in Supply Chain Network app

正解:A、B


質問 # 31
Which functional capabilities are included in SAP IBP for response and supply? Note: There are 2 correct answers to this question

  • A. Detailed Production Scheduling
  • B. Calculating buffer proposals
  • C. Gating Factor
  • D. Analyse supply Usage

正解:C、D


質問 # 32
You are implementing a demand process in SAP IBP for sales and operations, and consider using the standard forecast key figures available in the sample planning area SAPIBP1. What are the first and last key figures in the logical progression of demand in the S&OP process?

  • A. Statistical Forecast Qty first and Consensus Demand Plan Qty last
  • B. Local Demand Plan first and Combined Final Demand last
  • C. Local Demand Plan first and Consensus Demand Plan Qty last
  • D. Statistical Forecast Qty first and Global Demand Plan Qty for SOP last

正解:B


質問 # 33
......


SAP C_IBP_2311 認定試験の出題範囲:

トピック出題範囲
トピック 1
  • 主要な数値と属性: 試験のこのセクションでは、主要な数値と属性を作成して利用し、サプライ チェーンをモデル化するトピックが取り上げられます。
トピック 2
  • 需要計画: 試験のこのセクションでは、計画モデルで予測を作成し、変換することが優先されます。
トピック 3
  • 計画領域の一般的な構成: このセクションでは、計画領域の表示、作成、コピー、編集、確認、アクティブ化の方法などのトピックについて説明します。
トピック 4
  • 計画オペレーターとアプリケーション ジョブ: 試験のこのセクションでは、計画フレームワーク内の手順を自動化するために計画オペレーターを構成および使用する方法などのトピックが取り上げられます。
トピック 5
  • 販売および運用プロセスのモデル化: 試験のこのセクションでは、財務計画と統合された高度な需要と供給の計画を使用して、IBP がネットワーク内の S&OP のロジックを拡張する方法がトピックに含まれます。

 

SAP C_IBP_2311リアル2025年最新のブレーン問題集で模擬試験問題集:https://www.jpntest.com/shiken/C_IBP_2311-mondaishu

C_IBP_2311無料試験問題と解答PDF更新されたのは2025年03月:https://drive.google.com/open?id=1fgVo1T9A9-9DueAAoA7SXg_85-g-8txv

弊社を連絡する

我々は12時間以内ですべてのお問い合わせを答えます。

オンラインサポート時間:( UTC+9 ) 9:00-24:00
月曜日から土曜日まで

サポート:現在連絡