究極のガイドはC_IBP_2311最新2024年06月25日時間限定!今すぐダウンロード! [Q46-Q63]

Share

究極のガイドはC_IBP_2311最新2024年06月25日時間限定!今すぐダウンロード!

2024年最新のな厳密検証された合格させるC_IBP_2311試験にはリアル問題と解答


SAP C_IBP_2311 認定試験の出題範囲:

トピック出題範囲
トピック 1
  • General Configuration of a Planning Area
  • Optimize inventory in the supply chain utilizing algorithms that derive inventory targets
トピック 2
  • Create and transform forecasts in your planning model
  • Use the Fiori Launchpad to customize the UI, work with Excel UI
トピック 3
  • Create and use key figures and attributes to model the supply chain
  • Define and view information with user-defined charts and dashboards
トピック 4
  • Describe how IBP extends the logic of S&OP in the network using advanced demand
  • Display, create, copy, edit, check, and activate a planning area

 

質問 # 46
The S&OP Operator Profiles app is used to configure different types of algorithms. Which algorithm- specific settings are unique for the Time Series-based Supply Optimizer? Note: There are 2 correct answers to this question.

  • A. Time profile level
  • B. Global cost factors
  • C. Processing mode
  • D. Discretization

正解:B、D


質問 # 47
Which SAP IBP planning operator can be run to delete planning objects in a certain version?

  • A. Purge Key Figure Data Outside Planning Area Planning Horizon
  • B. Purge Non-Confirming Data
  • C. Purge Key Figure Data
  • D. Purge Master Data

正解:C


質問 # 48
Which options can be used to reduce the runtimes of a time-series optimizer run? Note: There are 3 correct answers to this question.

  • A. Use non-overlapping networks by using Subnetworks ID maintained at Location-Products to reduce the size of the problem
  • B. Increase the use of incremental lot size beyond the frozen horizon.
  • C. Split into multiple planning areas to support weekly vs. daily planning needs.
  • D. Keep the number of fairshare segments small
  • E. Eliminate the usage of telescopic time buckets

正解:A、D、E


質問 # 49
What are the possible Master Data Maintenance options for SAP Integrated Business Planning for Supply Chain? Note: There are 3 correct answers to this question

  • A. The Manage Master Data app
  • B. The data Integration job app
  • C. The Planning Areas Model Configuration app
  • D. The Planner Workspaces app
  • E. The SAP IBP, add - in for Micorsoft Excel

正解:A、B、E


質問 # 50
You need to make manual adjustments to your S&OP plan. Which are possible ways of making these changes? Note: There are 2 correct answers to this question

  • A. Leveraging the web-based Planning capability
  • B. Using Microsoft Excel planning views
  • C. Leveraging the functionality of SAP Work zone
  • D. Using Driver-Based planning

正解:A、B


質問 # 51
You need to create time periods for the time profile in a planning are
a. What should you be aware of when running the Create Time Periods application job?

  • A. This application job can also be triggered from SAP IBP, add-in for Microsoft Excel
  • B. A time profile has to be activated so that application job can proceed
  • C. The planning area to which the time profile is assigned must be active
  • D. It is mandatory to specify the planning area in the Parameter Section of the application job

正解:B


質問 # 52
How many different time levels can be selected within one planning view?

  • A. Only time levels from the base planning level of selected key figures
  • B. All time levels available in the time profile, restricted by global configuration parameter
  • C. The number of time levels is restricted to four to avoid negative effects on performance
  • D. All time levels available in the time profile

正解:B


質問 # 53
You are reviewing the master data types that are often used for supply and inventory planning. Which master data types are compound master data types? Note: There are 2 correct answers to this question

  • A. SOURCECUSTOMER
  • B. SOURCELOCATION
  • C. SOURCEPRODUCTION
  • D. SOURCECUSTGROUP

正解:A、B


質問 # 54
What are some of the features of the network charts in SAP Integrated Business Planning for Supply Chain? Note: There are 2 correct answers to this question

  • A. You can create a network chart from the dedicated app, or use the Manage Analytic Stories app
  • B. The network charts visualize relationships between warehouse, plants, customer, and supplier, for finished goods
  • C. To display the network chart, you need the Ship-From Location master data type in the planning area
  • D. You can create a network chart from the dedicated app, or use the Analytic Advanced app

正解:B、D


質問 # 55
What are some of the prerequisites for configuring a planning area that results in a successful consistency check? Note: There are 2 correct answers to this question.

  • A. Specify a planning horizon in the planning area for each level of the assigned time profile
  • B. Configure at least one calculated key figure for the planning area
  • C. Assign the compound master data type and its component master data types
  • D. Configure at most two input key figures on the same planning level in a key figure calculation

正解:A、C


質問 # 56
What is the feature of the weighted average key figure calculation?

  • A. The numerator of the calculation should be stored.
  • B. Attributes can be used in weighted average key figure calculation
  • C. The first parameter of the formula acts as a weight
  • D. The numerator's value should include multiplication by the weight.

正解:D


質問 # 57
You are adding a value-based filter to a planning view. Which of the following conditions apply? Note: Thereare 2 correct answers to this question.

  • A. These filters can be used together with attributes totals in the same planning view
  • B. You can only apply one value-based filter per planning view.
  • C. The alerts dashboard is not available if a value-based filter is set for the open planning view
  • D. You can add (or delete) planning objects to a planning view after these filters are applied

正解:A、D


質問 # 58
Manage Analytics Stories introduces advanced visualization features within SAP Integrated Business Planning for Supply Chain. What are some of the main capabilities of the stories? Note: There are 3 correct answers to this question.

  • A. Links to the external URLs can be embedded in the story.
  • B. Stories must be re-created in each SAP IBP environment.
  • C. Specific chart and table filters can be applied within the story
  • D. The story is structured around one responsive page

正解:A、B、C


質問 # 59
You set up time-series integration using SAP Cloud Integration for data services. During the integration process of master data, an error occurred. In the Data Integration app the job failed with the status "Fatal Error" How can you find more details about the error?

  • A. Navigate to the Master Data Workbook in Excel and open the Log.
  • B. Download the initial Problem report in the Data Integration app
  • C. Navigate to the Manage Master Data app and open the Log
  • D. Download the Rejection Report in the Data Integration app

正解:B


質問 # 60
What are possible approaches to modeling a customer demand in time-series-based optimization with SAP IBP for response and supply? Note: There are 2 correct answers to this question.

  • A. Try to go as granular as possible with the customer product
  • B. Assign a high cost value (1 million or more ) for non-delivery to priority customers
  • C. Ensure discounting does not result in negative costs for each customer-product combination.
  • D. Ensure product prioritization with the combination of customer and product

正解:C、D


質問 # 61
You are modeling co-products in SAP Integrated Business Planning for Supply Chain. What are some of the properties ofco-production you need to be aware of? Note: There are 2 correct answers to this question

  • A. Co-production can be modelled only by supply optimizer and finite heuristics
  • B. The output coefficient is time-dependent and should be modeled as a time series
  • C. The relationship between main product and co-product is specified in the production source of supply.
  • D. The number of co-products that can be defined in the supply model is unlimited.

正解:C、D


質問 # 62
As an architect, you are configuring the Planner Workspaces user interface settings. Which appearance settings are on your to-do list? Note: There are 3 correct answers to this question

  • A. Add Navigation profile
  • B. Add playbooks for alerts
  • C. Add custom alerts
  • D. Define key figure formatting
  • E. Adding planning view

正解:B、C、E


質問 # 63
......

問題集全額返金保証付き!C_IBP_2311問題公式問題集:https://www.jpntest.com/shiken/C_IBP_2311-mondaishu

厳密検証されたC_IBP_2311試験問題集PDF[2024年最新] 時間限定無料アクセスJPNTest:https://drive.google.com/open?id=1fgVo1T9A9-9DueAAoA7SXg_85-g-8txv

弊社を連絡する

我々は12時間以内ですべてのお問い合わせを答えます。

オンラインサポート時間:( UTC+9 ) 9:00-24:00
月曜日から土曜日まで

サポート:現在連絡