質問 42
You are working with planning strategy 40 (Planning-with-final assembly). When does consumption of planned independent requirements take place?
- A. When the MRP results are saved
- B. When you deliver a sales order
- C. When you create a planned order
- D. When you create a sales order
正解: D
質問 43
Which time elements does MRP consider in backward scheduling to determine the order dates for components from dependent requirements? Note: There are 2 correct answers to this question.
- A. Operation duration
- B. Planned delivery time
- C. Total replenishment lead time
- D. In-house production time
正解: B,D
質問 44
Which Kanban master data object controls the relationship between the supply and demand source?
Please choose the correct answer.
Response:
- A. Kanban container
- B. Rate routing
- C. Production supply area
- D. Control cycle
正解: D
質問 45
The production plan is being disrupted by last minute demands that are entered in the system. Which is the most efficient way to handle last minute demands and protect the current production plan?
There are 2 correct answers to this question.
Response:
- A. In the material master record, set MRP type to P4 and a planning time fence on the replenishment lead time of the material
- B. In the material master record, set MRP type to P1 and a planning time fence on the replenishment lead time of the material
- C. Manually firm all planned orders for materials within the replenishment lead time of the material
- D. In the stock requirements list, set a manual firming fence for a date based on the replenishment lead time of the material
正解: B,D
質問 46
What is the purpose of collective orders?
- A. To post production costs on a cost collector instead of the production order
- B. To post any component withdrawals single back flush with order confirmation
- C. To manage production orders for an entire finished product on multiple levels
- D. To combine order management of co-products and by-products with the main product
正解: C
質問 47
Which of the following processes lead to an entry in the MRP planning file? Note: There are 3 correct answers to this question.
- A. Change of the material's procurement type
- B. Creation of dependent requirements
- C. Change of the storage bin
- D. Creation of a purchasing contract
- E. Creation of a sales order
正解: A,B,E
質問 48
You have maintained the parameters for simple discontinuation the material master of a component. Which business process will be affected if the available stock is zero and the discontinuation date is in the past?
- A. Back flushing
- B. Kanban
- C. Material requirements planning
- D. Production order release
正解: C
質問 49
Which actions does the system perform by default when you save a confirmation for a finished product in repetitive manufacturing? Note: There are 3 correct answers to this question.
- A. Material staging for next order in sequence
- B. Archiving of documents for assembly scrap
- C. Reduction of associated capacity requirements
- D. Posting of production costs to the production cost collector
- E. Posting of goods receipt for the product
正解: C,D,E
質問 50
What are attributes of the SAP S/4HANA Simplification list?
There are 3 correct answers to this question.
Response:
- A. It details transaction and solution capabilities at a functional level
- B. It is only a grouping of related technical simplifications
- C. It contains references to the relevant training material
- D. It was created for better planning and estimation of your way to S/4HANA
- E. It can have a business and a technical impact
正解: A,D,E
質問 51
What are the three transition scenarios for an S/4HANA implementation?
There are 3 correct answers to this question.
Response:
- A. System conversion
- B. New implementation
- C. System activation
- D. System upgrade
- E. Landscape transformation
正解: A,B,E
質問 52
In a first step you have created master recipes. In which sequence are the additional objects created?
Please choose the correct answer.
Response:
- A. Process order
Control recipe
PI sheet
Process message - B. Control recipe
Process order
PI sheet - C. Process order
Control recipe
Process message
PI sheet - D. Process message
Control recipe
Process order
Process message
PI sheet
正解: A
質問 53
Which time elements can be reduced by a reduction strategy? Note: There are 3 correct answers to this question.
- A. Move time
- B. Goods receipt processing time
- C. Float after production
- D. Queue time
- E. Wait time
正解: A,C,D
質問 54
You produce your material based on a forecast derived from historical sales and expect it to be in inventory when your customer orders. If customers order more that the forecasted quantity, you want to increase production to try to meet the extra demand.
Which is the appropriate planning strategy to use?
Response:
- A. 50 - Planning without final assembly
- B. 10 - Anonymous make-to-stock
- C. 20 - Make to order production
- D. 40 - Planning with-final-assembly
正解: D
質問 55
Advanced Planning uses master data and transaction data from SAP S/4HANA In which data obje can you set the advanced planning flag? Note: There are 2 correct answers to this question.
- A. Material
- B. Production version
- C. Work center
- D. Plant
正解: A,C
質問 56
Which materials have a negative quantity in a bill of materials or in a recipe? Note: There are 3 correct answers to this question.
- A. Bulk materials
- B. By-products
- C. Co-products
- D. Waste products
- E. Continuous flow materials
正解: B,C,D
質問 57
How Is the bill of material (BOM) exploded when you use a BOM explosion number?
Please choose the correct answer.
Response:
- A. With respect to defined separate key dates for product and each assembly
- B. With respect to a defined separate change status for product and each assembly
- C. With respect to a common change status for product and each assembly
- D. With respect to a common key date for product and each assembly
正解: A
質問 58
What are the consequences when you assign a planned order to a production line manually, using the planning table in repetitive manufacturing?
- A. The planned order generates capacity requirements.
- B. The planned order is converted to a production order.
- C. The planned order's component availability is checked
- D. The planned order's components are copied from the picking list.
正解: A
質問 59
When do you use variant bills of materials (BOMB)?
- A. When multiple material also have the same BOM
- B. When multiple material is have similar BOMB
- C. When a material has multiple BOMB
- D. When a material has a configurable BOM
正解: A
質問 60
Which elements are included in the structure of the batch where-used list?
There are 3 correct answers to this question.
Response:
- A. Stock transfers
- B. Collective orders
- C. Transfers from batch to batch
- D. Planned orders
- E. Purchase orders
正解: A,C,E
質問 61
The MRP run detected a shortage of a material that you source from an external supplier in full pallets. How can you make sure you will only receive full pallets?
- A. Use the reorder point.
- B. Use the MRP type for vendor managed inventory.
- C. Use the fixed lot size procedure.
- D. Use the minimum order quantity.
正解: C
質問 62
What are possible configuration steps when setting up the alert monitor in Advanced Planning? Note: There are 3 correct answers to this question.
- A. Create object selection variant for transportation lane-related alerts.
- B. Create object selection variant for product-related alerts.
- C. Assign the overall profile to the authorization profile.
- D. Assign the alert profile to the overall profile.
- E. Create object selection variant for resource-related alerts
正解: B,D,E
質問 63
You want to set up a make-to-order planning scenario for a finished material. Some components from the bill of materials (BOM) should be procured per sales order, other components should be procured for various requirements. Fore casting is NOT possible. Which settings do you make to achieve this?
- A. Planning strategy 50 (Planning without final assembly) and the corresponding Mixed MRP indicator
- B. Planning strategy 50 (Planning without final assembly) and the corresponding individual Collective Indicator.
- C. Planning strategy 20 (Make-to-Order) and the corresponding Mixed MRP indicator
- D. Planning strategy 20 (Make-to-Order) and the corresponding individual Collective indicator
正解: B
質問 64
Your project uses process orders for the production of liquid chemicals. What can you define to ensure that the production flow happens only in physically connected tanks?
- A. Setup matrix
- B. Operation network
- C. Resource network
- D. Work center hierarchy
正解: D
質問 65
......